Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 12991 of 2025

NEMA invites public comments on Mara Groove Limited’s proposed residential apartments development on plot L.R. NO. 7149/210 in Syokimau Area Machakos County.

Official PDF · 1.0 MB

Whole issue, from Kenya Law. This notice starts on printed page 6212.

AI-extractedAgreement between models, not verified accuracy.

What the notice says

  1. L.R. No. 7149/210

    Link
    Parcel
    L.R. No. 7149/210
    Issuing authority
    National Environment Management Authority
    Proponent
    Mara Groove Limited
    Place
    Nairobi-Mombasa Highway (The proposed development is located off along the Nairobi-Mombasa Highway.), Syokimau Area, Machakos County
    Body
    Ministry of Environment, Climate Change and Foresty (The full report is available for inspection during working hours.)
    Inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty (The full report is available for inspection during working hours.), County-Director of Environment, Machakos County (The full report is available for inspection during working hours.)
    Comment recipient
    Director-General, National Environment Management Authority (Receives oral or written comments; the full report is available for inspection during working hours.)
    Comments
    30 days, as printed
    Comment period start
    from the date of this publication
    Project description
    5 blocks residential building comprising a total of 502 housing units (130 one bedroom units, 156 two bedroom units and 216 three bedroom units) 13 shops, gym, parking spaces, power distribution room, water pump room and other associated facilities and amenities
    Report type
    Environmental Impact Assessment Study Report
    Report url
    www.nema.go.ke
    Comment method
    oral or written comments
    Comment email
    dgnema@nema.go.ke

Schedule 5 rows

ImpactsProposed Mitigation Measures
Disruption of existing natural environment and modification of microclimate Increased development density Increased glare/solar reflection Reduced natural ground cover Obstruction of ventilating wind Increased surface run-off• Development restricted to follow zoning policy/approved density – building line, plot coverage and plot ratio. • Careful layout and orientation of buildings to respect wind and sun direction. • Adequate provision of green and open space planted with grass, shrub and tree cover. • Minimum use of reflective building material and finishes for roof, wall and pavement.
Pollution and health Hazards Dust and other construction waste noise generation from construction activities.• Damping down of site e.g. sprinkling water to dusty areas on construction site. • Containment of noisy operation, including locating noise operations away from sensitive neighbors. • Construction work limited to day time only and take shortest time possible.
Increased loading on Infrastructure services Increased vehicular and/or pedestrian traffic increased demand on water, sanitation services etc. Increase surface runoff• Have paved local access road and walkway system. • Encourage rainwater harvesting. • Provision of increased water storage capacity. • Provide adequate storm water drainage system.
Worker accidents and health infection• Employ skilled and trained workers, provide protective clothing. • Prepare clear work schedule and the organization plan. • Have adequate worker insurance cover. • Enforce occupational health and safety standards.
Increased social conflict• Increased Housing stock in the area and Kenya. • Increased economic activities-employment generation, income earnings and housing capital stock formation. • Encourage formation of community policing and formation of neighbourhood associations.

Everyone named

Signed byMamo B. Mamo, Director-General, National Environment Management Authority
Places 3Nairobi-Mombasa Highway · Syokimau Area · Machakos County
Inspection offices 2Principal Secretary, Ministry of Environment, Climate Change and Foresty · County-Director of Environment, Machakos County
Issuing authorityNational Environment Management Authority
ProponentMara Groove Limited
ParcelL.R. No. 7149/210
BodyMinistry of Environment, Climate Change and Foresty
Comment recipientDirector-General, National Environment Management Authority
Places 6NHIF Building · Ragati Road · Upper Hill · Nairobi · Popo Road · Mombasa Road
Law 2Environmental Management and Co-ordination Act · Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 12991 of 2025, Vol. CXXVII No. 192, 12 September 2025, p. 6212.

Permalink funua.com/notices/2025/12991/.

About this data

Source
Official PDF of Vol. CXXVII No. 192, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · September 2025 · Vol. CXXVII No. 192