Gazette Notice No. 13539 of 2025
National Environment Management Authority invites public comments on Lesonia Residency Limited's proposed residential apartments on L.R. No. Nairobi/Block 23/380.
Official PDF · 1.3 MB
Whole issue, from Kenya Law. This notice starts on printed page 6369.
AI-extractedAgreement between models, not verified accuracy.
Items 3
-
L.R. No. Nairobi/Block 23/380
Link- Parcel
- L.R. No. Nairobi/Block 23/380
- Issuing authority
- National Environment Management Authority
- Proponent
- Lesonia Residency Limited
- Place
- Gatundu Road, Kileleshwa Area, Nairobi City County (Excavation permit to be obtained from Nairobi City County.)
- Body
- NCWSC (Connection permits to be obtained from NCWSC.), DOSHS (Construction worker records and workplace registration requirements.)
- Office
- Nairobi County Director of Forestry (Tree-cutting clearance certificate to be obtained before cutting down trees.)
- Proposed development
- A 16-storey residential building with 3No. Basements, ground floor, 1st floor and typical 2nd to 16th floor comprising a total of 278No. residential apartments (154No. one-bedroom units, 93No. two-bedroom units and 31No. three-bedroom units), 232 parking bays, children play area, gym, swimming pool, 2 yoga studios, 2 steam rooms, resident lounge, a management office and other associated facilities and amenities.
- Report status
- National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report.
-
Mitigation measures 2
Link- Excavation permit authority
- Nairobi City County
- Licensing authority
- NEMA (Waste transporter licensing.)
- Connection permit authority
- NCWSC (Sewer and water supply connection permits.)
-
Public comments 3
Link- Issuing authority
- National Environment Management Authority
- Body
- Kplc (Connection permit for an onsite transformer.), DOSHS (Construction workplace registration and construction worker records.), Ministry of Environment, Climate Change and Forestry (Report available for inspection.), Nairobi City County
- Inspection office
- Principal Secretary, Ministry of Environment, Climate Change and Forestry (Report available for inspection during working hours.), County Director of Environment, Nairobi City County (Report available for inspection during working hours.)
- Office
- Director-General, National Environment and Management Authority (Report inspection and receipt of public comments.)
- Place
- NHIF Building (Report inspection address.), Ragati Road (Report inspection address.), Upper Hill (Report inspection address.), Nairobi (Report inspection addresses.), Popo Road (Report inspection address.), Mombasa Road (Report inspection address.)
- Comments
- 30 days, as printed
- Comment period start
- the date of publication of this notice
- Comment submission
- oral or written comments
- Report url
- www.nema.go.ke
- Comment email
- dgnema@nema.go.ke
- Inspection location
- (a) Principal Secretary, Ministry of Environment, Climate Change and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126–00100, Nairobi.
- Inspection location
- (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
- Inspection location
- (c) County Director of Environment, Nairobi City County.
Schedule 25 rows
| Impact | Mitigation Measures |
|---|---|
| Soil erosion | • Obtain an excavation permit from Nairobi City County before excavation begins. • Excavation will be undertaken using standard equipment and no blasting of the rocks will be carried out to avoid the destruction of neighbouring developments. |
| Water demand | • Extend the connection of the main water supply to the proposed development upon acquisition of a connection permit from NCWSC. • Drill a borehole as an alternative source of water during the project cycle. • Harvest rainwater for reuse to supplement the existing surface and subsurface water sources. • Monitor the water consumption within the site every month. |
| Energy demand | • Extend the connection of the proposed development to the existing conventional sewer system upon acquisition of a connection permit from NCWSC. • Install solar panels as an alternative source of renewable energy for the proposed development. • Install a standby generator as a backup source of energy for the development. • Install energy-efficient fixtures and fittings within the development such as LED bulbs. • Monitor the energy consumption within the site every month. |
| Liquid waste | • Extend the connection of the proposed development to the existing conventional sewer system upon acquisition of a connection permit from NCWSC. • Design and construct an internal reticulation system which can consistently handle the loads even at peak volumes. • Provide adequate sanitary conveniences to the workers and ensure they are kept clean. |
| Solid waste | • Design and implement a three-year Waste Management Plan. • Provide a centralised Waste Collection Centre with colour-coded receptacles for solid waste management. • Segregate non-hazardous waste into organic and non-organic fractions before final disposal. • Engage a NEMA-licensed waste transporter to collect and dispose of the segregated waste to designated disposal sites. |
| Traffic density | • Ferry building materials and construction waste during the off-peak hours. • Engage traffic marshals to control traffic in and out of the site. • Install traffic control/warning signs to inform the motorists and public of the potential hazards. • Provide temporary car parking spaces for construction vehicles within the site boundary. |
| Air pollution | • Screen the entire site using dust screens/nets to control and arrest construction-related dust. • Sprinkle water in the work areas twice every day to prevent fugitive dust violations. • Ambient air quality monitoring within the site. |
| Noise and excessive vbrations | • Construction activities are to be undertaken between (0800hrs to 1800hrs) on weekdays and (0800hrs to 1300hrs) on Saturdays only. • Sensitize workers and drivers on minimal permissible noise levels. • Regular maintenance of the machinery to reduce frictional noise. • Ambient noise quality monitoring within the site. |
| Security risks | • Engage licensed security personnel to safeguard the property and monitor the movement of people in and out of the site. • Keep records of all construction workers as per DOSHS requirements. • Install CCTV cameras and security lights at strategic points within the site to monitor and enhance the security of the property. |
| Health and safety of workers | • Register the construction site as a workplace with the DOSHS before the construction begins. • Provide adequate and appropriate PPE and ensure that all workers wear them at all times. • Provide first aid facilities and ensure that the workers are trained in emergency response. • Develop an Emergency Response Plan to manage the occurrence of anticipated hazards during the construction phase. • Comply with the Occupational Safety and Health Act (OSHA), 2007 and all other relevant regulations governing the health and safety of the workplace. |
| Loss of vegetation | • Apply for a tree-cutting clearance certificate from the Nairobi County Director of Forestry before cutting down the trees and adhere to the conditions. • Undertake a comprehensive landscaping exercise by planting indigenous trees and grass within the open spaces. systems. • Provide proper signage and barriers. • Use full-body harnesses and fall arrest systems. • Ensure ladders and scaffolds are inspected regularly. • Ensure continuous ventilation of the confined space. |
| Oil spillages | • Conduct routine inspection and monitoring of all oil and fuel storage tanks. • Maintenance of fully stocked spill kits at the Yard • Develop and implement a Spill Prevention and Emergency Response Plan (SPERP). • Pave all oil handling and storage areas. • Construct an oil-water interceptor in the drainage system. • Construct bund walls around the fuel tank farm to contain potential spills or leaks. • In case of accidental spillage. • Immediately stop the source of the spill. • Activate emergency response plan and alert responsible personnel. • Contain the spill using sand, absorbent booms, or soil bunds. • Block nearby drains to prevent oil from entering water systems. • Use spill kits to absorb and clean up spilled oil. |
| Fire | • Install fire extinguishers at key points around the plant. • Train all workers on fire safety, use of extinguishers, and evacuation procedures. • Conduct regular fire drills and emergency preparedness exercises. • Install smoke detectors and heat sensors in critical areas. • Prohibit open flames and smoking within site. • Clearly label flammable materials. • Keep fire assembly points and access routes well-marked and unobstructed. |
| Occupational health and safety risks | • Construction of a site office for coordinating activities. • Appointment of a responsible team/persons to oversee Health, Safety, and Environment (HSE) matters • Provision of Workers Injury Benefits Act (WIBA) coverage for all site personnel • Engagement of security services from a reputable security firm at the • Provision of clean drinking water, adequate sanitation facilities, a first aid kit, and other basic welfare amenities at the site • Maintenance of a register of workers of water during the project cycle. • Harvest rainwater for reuse to supplement the existing surface and subsurface water sources. • Monitor the water consumption within the site every month. |
| Energy demand | • Install an onsite transformer to supply energy to the proposed development subject to the acquisition of a connection permit from KPLC. • Install solar panels as an alternative source of renewable energy for the proposed development. • Install energy-efficient fixtures and fittings within the development such as LED bulbs. • Monitor the energy consumption within the site every month. |
| Health and safety of workers | • Register the construction site as a workplace with the DOSHS before the construction begins. • Provide adequate and appropriate PPE and ensure that all workers wear them at all times. • Provide first aid facilities and ensure that the workers are trained in emergency response. • Develop an Emergency Response Plan (ERP) to manage the occurrence of anticipated hazards during the construction phase. • Comply with the Occupational Safety and Health Act (OSHA), 2007 and all other relevant regulations governing the health and safety of the workplace. |
| Impacts | Mitigation Measures |
|---|---|
| Noise generation | • Schedule project activities between 8:00 a.m. and 5.00 p.m. • Train operators on efficient operation practices, including minimizing idling time and hooting. • Maintenance of equipment to ensure optimal performance and reduced noise emissions. • Carry out periodic noise level measurements at the site. • Provide PPE to all personnel operating or working above 85db. • Install noise barriers, silencers, or dampeners on machinery. |
| Gaseous emissions | • Use covered containers for handling and transporting waste oil. • Regularly service machinery and generators to reduce exhaust emissions. • Monitor ambient air quality periodically to detect pollutant levels. • Avoid open burning of oily waste, rags, or sludge. • Minimize idling of vehicles and heavy equipment within the facility. |
| Waste generation and disposal | • Segregate waste at source. • Provide designated waste bins for different waste streams. • Contract licensed waste handlers for collection and disposal. • Encourage reuse and recycling where feasible • Conduct periodic audits to monitor waste management practices. |
| Injuries from working at heights and in Confined Spaces | • Conduct job-specific risk assessments. • Develop and implement permit-to-work |
| Soil erosion | • Obtain an excavation permit from Nairobi City County before excavation begins. • Excavation will be undertaken using standard equipment and no blasting of the rocks will be carried out to avoid the destruction of neighbouring developments. • Control excavation works especially during rainy/wet conditions. |
| Noise and excessive vibrations | • Construction activities are to be undertaken between 0800hrs to 1800hrs on weekdays and 0800hrs to 1300hrs on Saturdays only. • Sensitize workers and drivers on minimal permissible noise levels. • Regular maintenance of the machinery to reduce frictional noise. • Ambient noise quality monitoring within the site. |
| Solid waste | • Design and implement a three-year Waste Management Plan. • Provide a centralised Waste Collection Centre (WCC) with colour-coded receptacles for solid waste management. • Segregate non-hazardous waste into organic and non-organic fractions before final disposal. • Engage a NEMA-licensed waste transporter to collect and dispose of segregated waste to designated disposal sites. |
| Storm water drainage | • Construct internal drainage channels covered with gratings for storm water management. • Install rainwater-harvesting facilities within the site structures to reduce the amount of storm reaching the surface. |
| Water demand | • Extend the connection of the main water supply to the proposed development upon acquisition of a connection permit from NCWSC. • Drill a borehole as an alternative source |
Everyone named
| Signed by | Mamo B. Mamo, Director-General, National Environment and Management Authority |
|---|---|
| Places 9 | Gatundu Road · Kileleshwa Area · Nairobi City County · NHIF Building · Ragati Road · Upper Hill · Nairobi · Popo Road · Mombasa Road |
| Bodies 5 | NCWSC · DOSHS · Kplc · Ministry of Environment, Climate Change and Forestry · Nairobi City County |
| Offices 2 | Nairobi County Director of Forestry · Director-General, National Environment and Management Authority |
| Inspection offices 2 | Principal Secretary, Ministry of Environment, Climate Change and Forestry · County Director of Environment, Nairobi City County |
| Issuing authority | National Environment Management Authority |
| Proponent | Lesonia Residency Limited |
| Parcel | L.R. No. Nairobi/Block 23/380 |
| Excavation permit authority | Nairobi City County |
| Licensing authority | NEMA |
| Connection permit authority | NCWSC |
| Law 3 | Environmental Management and Co-ordination Act · Co-ordination Act · Occupational Safety and Health Act |
Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.
Corrections 0
- Corrected by
- No corrigendum in the issues we hold.
- Cites
- Occupational Safety and Health Act
Cite
Kenya Gazette Notice No. 13539 of 2025, Vol. CXXVII No. 195, 19 September 2025, p. 6369.Permalink funua.com/notices/2025/13539/.
About this data
- Source
- Official PDF of Vol. CXXVII No. 195, from Kenya Law
- Extracted by
- AI models
- Model audit
- An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
- Review flag
- None on this notice