Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 13879 of 2025

National Environment Management Authority invites public comments on Ziklag Wells Ltd's proposed used oil transfer station, asbestos disposal site and incinerator.

Official PDF · 1.6 MB

Whole issue, from Kenya Law. This notice starts on printed page 6456.

AI-extractedAgreement between models, not verified accuracy.

Items 2

  1. L.R. NO. 3291/KALUMANI/ MNYENZENI, L. R. No. 3290 /Kalumani

    Link
    Parcels
    L.R. NO. 3291/KALUMANI/ MNYENZENI, L. R. No. 3290 /Kalumani
    Issuing authority
    National Environment Management Authority
    Proponent
    Ziklag Wells Ltd
    Place
    Mnyenzeni, Kilifi County
    Report
    Environmental Impact Assessment Study Report
    Project
    used oil transfer station and asbestos disposal site and incinerator
    Project components
    an office block, waste oil decanting chamber, waste oil decanting chambers, incinerators, an open yard complete with storm water drains, waste management facilities, perimeter fence, E-waste holding area, temporary asbestos holding shade, dismantling space
  2. Public comments 2

    Link
    Issuing authority
    National Environmental Management Authority (Invites oral or written comments on the environmental impact assessment report.)
    Body
    Ministry of Environment, Climate Change and Foresty (The full report is available for inspection during working hours at the Principal Secretary's office.)
    Inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty ((a) Principal Secretary, Ministry of Environment, Climate Change and Foresty, NHIF Building, 12th Floor, Ragati Road, Upper Hill, Upper Hill, hidden.), Director-General, National Environment Management Authority ((b) Director General, NEMA, Popo Road, off Mombasa Road, hidden.), County Director of Environment, Malindi County ((c) County Director of Environment, Malindi County.)
    Comments recipient
    Director-General, National Environment Management Authority (Director General, NEMA)
    Place
    Malindi County (Location of an office where the report is available for inspection.), Nairobi (Location of offices where the report is available for inspection.)
    Comments
    30 days, as printed
    Comment period start
    the date of publication of this notice
    Report availability
    The full report of the proposed project is available for inspection during working hours.
    Report download
    www.nema.go.ke
    Comment submission
    Oral or written comments to the Director General, NEMA; comments can also be e-mailed to dgnema@nema.go.ke.

Schedule 9 rows

ImpactsMitigation Measures
Noise Generation• Reduction of idling time of vehicles which are not in use • Increase attention to maintenance of tools and equipment • Regular inspection and servicing of the various machines and power tools • Warn drivers to avoid unnecessary hooting of vehicles • Enclosure of noisy equipment with temporary barriers • Conduct periodic noise measurements and monitoring • Carry out project cycle activities between 8.00 a.m. and 5.00 p.m. • Where noise exceeds 85dB (A) workers should be provided with appropriate hearing protection and their use enforced
Gaseous Emissions• Ensure all fuel powered construction equipment are serviced and maintained regularly • Unnecessary reversing and idling should be discouraged • The contractor shall carry out routine vehicle maintenance and other machinery as per the manufacture’s specifications to ensure minimum emissions of gases such as NO2 and SO2. • Municipal waste should not be routinely composted before disposal, and certainly not in open air windrows. • Provide public education to calm the public’s fears about incineration, and explain that CO2 and some CH4 are released when waste decomposes in landfill or compose.
Oil Spillage and/or leakages• Installation and maintenance of oil interceptor • Maintenance and regular inspection of above ground used oil storage tanks • Document spill prevention procedure & response plan • Major maintenance operations to be carried out offsite • Maintain appropriate spill response kits at the site • Use of drip trays for minor servicing of equipment • Used oil containers should be stored in closed containers placed on water proofed surface and protected from direct sunlight and rainfall • Minimize the quantity of hazardous materials stored at the site • Use appropriate siphoning equipment to transfer recycled oil from storage tanks onto tankers to avoid oil spills • Inspect transportation tankers and reception/storage tanks to check checked for any leakages • In the event of an accidental spillage: • Take immediate steps to avoid the spillage spreading • Keep other people and vehicles away from the site • Wear protective clothing appropriate to the use of • the hazardous material • Soak up the hazardous material with absorbent material • such as dry san • Decontaminate any remaining traces of spillage on surfaces
Waste Generation and Disposal• Provide suitable solid waste containers • Segregate waste as necessary • Contract a waste transporter with a valid license from NEMA to collect waste from the site for disposal • Construct suitable pit latrines for use by construction workers on site • Used oil should be accumulated in suitable labelled containers for recycling during project operation phase • Safely accumulate oily rags for collection and incineration by • NEMA licensed incinerator operators • Implement an oil skimming programme for oil/water interceptors to ensure normal functioning
Falls and Injuries from elevated and overhead work• Provide safety nets/traps prior to commencing work at height Use of appropriate notices and signage to warn workers against falling objects • Restrict access to the site by unauthorized personnel • Ensure statutory inspection of all lifting equipment (Chain blocks and cranes) • Ensure cranes are operated only by trained and experienced personnel • Lifting equipment should not be overloaded • Provide safety harnesses and scaffolding while working at high levels • Provide appropriate personal protective equipment (helmets, safety boots, coveralls) • Provide appropriate number of first aid kits which should be restocked on regular basis • Adequate number of workers to be trained on first aid administration • Names of trained first aiders to be conspicuously displayed at the site • Maintain a record of incidents & accidents on site • Document the procedure for working at heights
Fire• Provide appropriate firefighting equipment • Train workers on fire fighting • Ensure inspection of the fire equipment • Post No smoking signs at the storage area for the fuel and/or oil • Designate a fire assembly point • Provide and maintain a well-stocked first aid kit
Occupational Health and Safety Risks• Construction of a site office for coordinating construction activities • Appoint a responsible person to be oversee all health and safety issues • Document appropriate emergency response procedures • Employ security guards from reputable firms • Document and display at the site emergency contacts • Obtain indemnity cover for all the workers on site • Provision of wholesome drinking water to workers • Use permits to work for critical tasks such as electrical installations and hot works (welding) • Maintain a register of workers on site • Designate an emergency assembling point
• Hold pre-job and monthly safety meetings with the hired workers to discuss safety issues pertinent to the job
Increase of Transmission of Communicable Diseases• Refuse will be disposed onto the same area as other inorganic wastes to deteriorate the capacity of breeding sources. Insecticide should be used to control threshold density of the houseflies that may include Fly baits. • A surface-active agent or polyoxyethylene lauryl ether (PEL), should be used effectively for the suppression of the fly density. • Sticky traps can also reduce houseflies in households

Everyone named

Signed byMamo B. Mamo, Director-General, National Environment Management Authority
Places 4Mnyenzeni · Kilifi County · Malindi County · Nairobi
Inspection offices 3Principal Secretary, Ministry of Environment, Climate Change and Foresty · Director-General, National Environment Management Authority · County Director of Environment, Malindi County
Issuing authorities 2National Environment Management Authority · National Environmental Management Authority
Parcels 2L.R. NO. 3291/KALUMANI/ MNYENZENI · L. R. No. 3290 /Kalumani
ProponentZiklag Wells Ltd
BodyMinistry of Environment, Climate Change and Foresty
Comments recipientDirector-General, National Environment Management Authority
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 13879 of 2025, Vol. CXXVII No. 200, 26 September 2025, p. 6456.

Permalink funua.com/notices/2025/13879/.

About this data

Source
Official PDF of Vol. CXXVII No. 200, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · September 2025 · Vol. CXXVII No. 200