Gazette Notice No. 14451 of 2025

NEMA invites public comments within 30 days on Tana Water Works Development Agency's environmental impact study for the Runyenjes sewerage project, Embu County.

Official PDF · 1.3 MB

Whole issue, from Kenya Law. This notice starts on printed page 6962.

AI-extractedAgreement between models, not verified accuracy.

What the notice says

  1. Public comments

    Link
    Issuing authority
    National Environment Management Authority
    Proponent
    Tana Water Works Development Agency
    Place
    Runyenjes, Embu County
    Comments
    30 days, as printed
    Reason
    Ref. No. NEMA/EIA/5/2/2299

Schedule 10 rows

Anticipated impacts and proposed mitigation measures
ImpactsProposed mitigation measures
Soil erosion• Re-plant the indigenous vegetation as much as practical once work is completed. • Limit vegetation clearance unless where unavoidable circumstances appear. • Contain excavated soils so that they will not find their way into nearby water sources. • Cement mixing should be done in a designated area away at a safe distance from storm water drains. • Spilled cement or concrete should be collected and disposed away from natural water ways or storm water drainage. • Sensitize workers and enable them to properly handle concrete spillages or waste cement. • Re-vegetation of exposed areas around the site should be carried out rapidly to mitigate against erosion of soil through surface water runoff and wind erosion.
Loss of vegetation• Cutting of trees to be restricted to the wayleave area only. • Issuance of tree seedlings to PAPs and local community to compensate for the trees cut and increase forest cover.
Changes in hydrology/ impended drainage/deep excavations• Excavated channels to follow contours to avoid interference with surface drains. • Where necessary, the drains to be directed along the construction line towards existing drainage systems to cater for storm water during the rains. • Utilize excavated soil to level excavated ground where necessary and cover the sewer lines. • Construction materials and other debris (lime, cement and fresh concrete.) should be handled carefully to prevent them from finding their way into the nearby water sources.
Air pollution• Proper maintenance of the sewer infrastructure. • Regular patrols to supervise leakages. • Installation of leak detectors.
Noise pollution• Discouraging hooting within public places or reserved places. • Proper servicing of vehicles • Monitor noise levels at sensitive receptors (residential areas, schools, hospitals). • Use of hearing protective gears e.g. earmuffs and ear plugs by workers working in noisy environments. • Inform residents when construction activities are likely to generate excessive noise in order to minimize disruption to local residents.
Occupational Safety and Health• Ensure that all construction machines and equipment are in good working conditions to prevent occupational hazards during excavation activities and laying of the pipes. • Establish a Health and Safety Plan for civil works areas ensuring the working hours are controlled and that employees are not allowed to extend the working hours beyond an acceptable limit for purposes of gaining extra pay. • Provide adequate manual labor to meet the requirements of the tasks. • Appoint a trained health and safety team for the duration of the construction work, monitor and advise appropriately on health and safety matters during the rehabilitation activities. • Provide workers with gloves, ear gears, sturdy rubber boots and overalls to protect their skin from the effects of cement. • Provide workers training on safety procedures and emergency response such as fire and sewer pipe bursts.
Public health, occupational health and safety• Train staff/workers on occupational health and safety. • Provide full protective gear and workmen’s compensation cover in addition to the right tools and operational instructions and manuals during construction. • Design of sewerage system should be as provided in the plans and should be constructed to approved size and design, standard and of approved materials. • Ensure use of standard construction materials and to the specifications. Avoid undesirable, substandard, hazardous or unauthorized materials during construction & maintenance. • Sensitized staff on social/health issues such as drugs.
Insecurity and social impacts• Provision of security guards, CCTV cameras, security lights and other security apparatus during the entire project cycle. • Construction work timings shall only in line with the NEMA licensing conditions.
Increased water usage• Management of water usage. Avoid unnecessary wastage. • Recycling of water at the construction phase where possible. • Make use of roof catchments to provide water i.e. for general purpose.
Increased generation of waste• A site waste management plan should be prepared by the contractor prior to commencement of construction works. • Proper solid waste receptacles and storage containers should be provided. • Arrangements should be made for the regular collection of litter and for its disposal with the County Government • Ensure that the solid waste collection, segregation, and disposal system is always functioning properly during the construction phase. • Recycle and re-use wastes where possible such as scraps metal.

Everyone named

Signed byMamo B. Mamo, Director-General
Places 2Runyenjes · Embu County
Issuing authorityNational Environment Management Authority
ProponentTana Water Works Development Agency
Also named 4Principal Secretary, Ministry of Environment, Climate Change and Foresty · Director-General, NEMA · County Director of Environment, Embu County · Ministry of Environment, Climate Change and Foresty
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 14451 of 2025, Vol. CXXVII No. 206, 3 October 2025, p. 6962.

Permalink funua.com/notices/2025/14451/.

About this data

Source
Official PDF of Vol. CXXVII No. 206, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · October 2025 · Vol. CXXVII No. 206