PlanningGazette notice
Gazette Notice No. 15142 of 2025
The National Environment Management Authority invites public comments on Kings Lotus Limited’s proposed 308 residential units in Kajiado County.
Official PDF · 1.4 MB
Whole issue, from Kenya Law. This notice starts on printed page 7221.
AI-extractedAgreement between models, not verified accuracy.
What the notice says
-
L.R No. Ngong/Ngong 110409
Link- Parcel
- L.R No. Ngong/Ngong 110409
- Issuing authority
- National Environment Management Authority
- Proponent
- Kings Lotus Limited
- Place
- GATAKA ROAD, Ngong, Kajiado County, Rongai
- Body
- Ministry of Environment, Climate Change and Foresty (The report is available for inspection at the Ministry.)
- Inspection office
- Principal Secretary, Ministry of Environment, Climate Change and Foresty, County-Director of Environment, Kajiado County
- Comment recipient
- Director-General, National Environment Management Authority (The report is also available for inspection at this office.)
- Comments
- 30 days, as printed
- Comment period start
- from the date of publication of this notice
- Project description
- 4 blocks of 65 storey each (Ground plus 6 floors) residential building comprising a total of 280 two and three bedroom residential units and 28No. Maisonattes, basketball court, driveway, parking, sewer systems and other associated facilities and amenities
- Report url
- www.nema.go.ke
- Comment method
- oral or written comments; Comments can also be e-mailed to dgnema@nema.go.ke
Schedule 16 rows
| Impacts | Proposed Mitigation |
|---|---|
| Changes in hydrology/impended drainage | • Proper installation of drainage structure. • Ensure efficiency of drainage structures through proper design and maintenance. |
| Soil erosion | • Control earthworks. • Install drainage. • Compact loose soil. • Landscaping. • Control activities during rainy conditions. • Provide soil erosion control structures on the steep sides during construction phase. |
| Air Pollution | • Control speed and operation regular maintenance of construction vehicles/plant equipment. • Sprinkling of water during construction phase. |
| Noise pollution | • Sensitize drivers on noise management. • Maintenance of plant equipment. • Construction activities to be restricted to daytime. • Workers in the vicinity of high level noise to wear safety and protective gear. • Provide noise buffers such as walls and trees around site. |
| Oil Pollution | • Proper storage handling and disposal of oil waste. • Maintain plant and equipment to avoid leaks. • Maintenance of construction vehicles should be carried out in the contractor’s yard of the site. • Provide oil interceptors along the drains leading from the carwash and service bays. |
| High water demand | • Management of water use. • Recycling of water during construction phase Rainwater harvesting. |
| Contractors lay down area | • Special attention should be paid to sanitary facilities on site. • Garbage should be disposed off periodically at approved dumpsites. |
| Road Safety | • Enforce speed limits for contraction vehicles especially along roads leading to the site • Provide bill boards at the site entrance to notify motorists about the development |
| Public health and occupational safety | • Ensure proper solid waste disposal facilities. • Ensure effective waste water management. • Sensitize residents on environmental management. • Provision of Personal Protective Equipment (PPE). |
| Vegetation | • Revegetation in the event of removal of vegetation. • Landscaping. |
| Fire Safety training/ emergency response | • Adapt effective emergency response plans. • Enhance disaster preparedness among stakeholders. • Ensure equipment are well maintained. |
| Record Keeping | • Collection and analysis of relevant environmental data of the site. |
| Internal Audits | • Monitoring will involve measurements, observations, evaluations, assessment of changes in water quality, waste management, noise levels, contractors safety etc. |
| Fire Outbreaks | • Install firefighting equipment. • Sensitize workers and residents on fire risks management. • Adapt effective emergency response plan. • Maintain firefighting machinery regularly. • Provide emergency numbers at strategic points. |
| Security | • Provide security guards and facilities during construction period. • The gate should always be manned by security men even during occupation. |
| GHG Emissions | • Reduce over-specification of concrete and steel. • Limit high-carbon tiles, use low-carbon adhesives, paints, waterproofing. • Increase PV capacity, install solar water heaters, high efficiency pumps and lighting, optimize STP energy use. • Materials passport for steel, stone, glass; design for disassembly and reuse. • Replace 30–50% cement with supplementary materials (PFA, GGBS), specify recycled-content steel. |
Everyone named
Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.
Corrections 0
- Corrected by
- No corrigendum in the issues we hold.
- Refers to
- No other notices.
Cite
Kenya Gazette Notice No. 15142 of 2025, Vol. CXXVII No. 215, 16 October 2025, p. 7221.Permalink funua.com/notices/2025/15142/.
About this data
- Source
- Official PDF of Vol. CXXVII No. 215, from Kenya Law
- Extracted by
- AI models
- Model audit
- An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
- Review flag
- None on this notice