Gazette Notice No. 15142 of 2025

The National Environment Management Authority invites public comments on Kings Lotus Limited’s proposed 308 residential units in Kajiado County.

Official PDF · 1.4 MB

Whole issue, from Kenya Law. This notice starts on printed page 7221.

AI-extractedAgreement between models, not verified accuracy.

What the notice says

  1. L.R No. Ngong/Ngong 110409

    Link
    Parcel
    L.R No. Ngong/Ngong 110409
    Issuing authority
    National Environment Management Authority
    Proponent
    Kings Lotus Limited
    Place
    GATAKA ROAD, Ngong, Kajiado County, Rongai
    Body
    Ministry of Environment, Climate Change and Foresty (The report is available for inspection at the Ministry.)
    Inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty, County-Director of Environment, Kajiado County
    Comment recipient
    Director-General, National Environment Management Authority (The report is also available for inspection at this office.)
    Comments
    30 days, as printed
    Comment period start
    from the date of publication of this notice
    Project description
    4 blocks of 65 storey each (Ground plus 6 floors) residential building comprising a total of 280 two and three bedroom residential units and 28No. Maisonattes, basketball court, driveway, parking, sewer systems and other associated facilities and amenities
    Report url
    www.nema.go.ke
    Comment method
    oral or written comments; Comments can also be e-mailed to dgnema@nema.go.ke

Schedule 16 rows

ImpactsProposed Mitigation
Changes in hydrology/im­pended drainage• Proper installation of drainage structure. • Ensure efficiency of drainage structures through proper design and maintenance.
Soil erosion• Control earthworks. • Install drainage. • Compact loose soil. • Landscaping. • Control activities during rainy conditions. • Provide soil erosion control structures on the steep sides during construction phase.
Air Pollution• Control speed and operation regular maintenance of construction vehicles/plant equipment. • Sprinkling of water during construction phase.
Noise pollution• Sensitize drivers on noise management. • Maintenance of plant equipment. • Construction activities to be restricted to daytime. • Workers in the vicinity of high level noise to wear safety and protective gear. • Provide noise buffers such as walls and trees around site.
Oil Pollution• Proper storage handling and disposal of oil waste. • Maintain plant and equipment to avoid leaks. • Maintenance of construction vehicles should be carried out in the contractor’s yard of the site. • Provide oil interceptors along the drains leading from the carwash and service bays.
High water demand• Management of water use. • Recycling of water during construction phase Rainwater harvesting.
Contractors lay down area• Special attention should be paid to sanitary facilities on site. • Garbage should be disposed off periodically at approved dumpsites.
Road Safety• Enforce speed limits for contraction vehicles especially along roads leading to the site • Provide bill boards at the site entrance to notify motorists about the development
Public health and occupational safety• Ensure proper solid waste disposal facilities. • Ensure effective waste water management. • Sensitize residents on environmental management. • Provision of Personal Protective Equipment (PPE).
Vegetation• Revegetation in the event of removal of vegetation. • Landscaping.
Fire Safety training/ emergency response• Adapt effective emergency response plans. • Enhance disaster preparedness among stakeholders. • Ensure equipment are well maintained.
Record Keeping• Collection and analysis of relevant environmental data of the site.
Internal Audits• Monitoring will involve measurements, observations, evaluations, assessment of changes in water quality, waste management, noise levels, contractors safety etc.
Fire Outbreaks• Install firefighting equipment. • Sensitize workers and residents on fire risks management. • Adapt effective emergency response plan. • Maintain firefighting machinery regularly. • Provide emergency numbers at strategic points.
Security• Provide security guards and facilities during construction period. • The gate should always be manned by security men even during occupation.
GHG Emissions• Reduce over-specification of concrete and steel. • Limit high-carbon tiles, use low-carbon adhesives, paints, waterproofing. • Increase PV capacity, install solar water heaters, high efficiency pumps and lighting, optimize STP energy use. • Materials passport for steel, stone, glass; design for disassembly and reuse. • Replace 30–50% cement with supplementary materials (PFA, GGBS), specify recycled-content steel.

Everyone named

Signed byMamo B. Mamo, Director-General, National Environment Management Authority
Places 4GATAKA ROAD · Ngong · Kajiado County · Rongai
Inspection offices 2Principal Secretary, Ministry of Environment, Climate Change and Foresty · County-Director of Environment, Kajiado County
Issuing authorityNational Environment Management Authority
ProponentKings Lotus Limited
ParcelL.R No. Ngong/Ngong 110409
BodyMinistry of Environment, Climate Change and Foresty
Comment recipientDirector-General, National Environment Management Authority
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 15142 of 2025, Vol. CXXVII No. 215, 16 October 2025, p. 7221.

Permalink funua.com/notices/2025/15142/.

About this data

Source
Official PDF of Vol. CXXVII No. 215, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice