Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 17565 of 2025

NEMA invites public comments on Eco Witaly Limited’s proposed eco-lodge at Ontulili Forest Station, Sirimon Gate, Mt. Kenya ecosystem, Meru County.

Official PDF · 2.2 MB

Whole issue, from Kenya Law. This notice starts on printed page 8447.

AI-extractedAgreement between models, not verified accuracy.

What the notice says

  1. Public comments

    Link
    Issuing authority
    National Environment Management Authority
    Proponent
    Eco Witaly Limited
    Place
    Ontulili Forest Station, Sirimon Gate, Mt. Kenya ecosystem
    County
    Meru County
    Heritage evaluation body
    National Museums of Kenya (To be notified if archaeological artefacts are encountered.)
    Water supplier
    Naivasha Water Co. (Engage for routine supply monitoring.)
    Body
    Ministry of Environment, Climate Change and Foresty (Report available for inspection.)
    Inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty (Report available for inspection during working hours.), County Director of Environment, Meru County (Report available for inspection during working hours.)
    Comment recipient
    Director-General, NEMA (Report available for inspection; receives oral or written comments.)
    Comments
    30 days, as printed
    Comment period start
    from the date of this publication
    Project description
    construct an eco-lodge comprising of; Wooden and canvas guest cabins, a central reception and restaurant area, Solar-powered lighting and heating systems, Nature trails, viewing decks, and educational signage, a sustainable wastewater treatment unit and solid waste segregation facility on a portion of Ontulili forest station, Sirimon Gate, Mt. Kenya ecosystem, Meru County.
    Report reference
    NEMA/ENVIS/SR/00247
    Report download
    www.nema.go.ke

Schedule 14 rows

Potential impactProposed Mitigation Measures
Soil erosion and site disturbance• Minimize vegetation clearance to the smallest possible footprint. • Excavate only within the designated construction boundaries. • Compact and stabilize loose soils immediately after. • Earthworks. • Provide temporary stormwater channels to direct runoff safely. • Re-vegetate exposed surfaces with indigenous grasses after completion.
Dust and air pollution• Sprinkle water on dusty surfaces and access roads regularly. • Cover trucks transporting loose materials such as sand and soil. • Ensure all construction machinery and vehicles are well maintained. • Limit speed of vehicles to reduce dust generation.
Noise and vibration pollution• Restrict noisy works to daytime hours (8.00 a.m. – 5.00 p.m.). • Use low-noise machinery and fit exhaust mufflers. • Sprinkle water on dusty surfaces regularly. • Maintain buffer vegetation to absorb noise and dust. • Inform local leaders before undertaking heavy works.
Solid waste generation• Segregate solid waste at source into recyclable, reusable, and general waste. • Provide bins at strategic collection points. • Engage licensed NEMA waste handlers for offsite disposal. • Promote reuse of inert materials like stones and timber offcuts. • Maintain proper waste transfer records.
Occupational health and safety hazards• Provide workers with appropriate PPE (helmets, boots, gloves, masks). • Conduct safety induction and toolbox meetings daily. • Install warning signage and restrict access to hazardous areas. • Keep first aid kits and trained personnel onsite. • Enforce safety supervision at all times.
Water pollution and spill risks• Construct oil-water interceptors at vehicle washing and maintenance zones. • Store fuel and lubricants in bunded areas. • Prohibit direct discharge of wastewater into natural drains. • Train workers on spill prevention and response. • Regularly inspect and maintain equipment to prevent leaks.
Impacts on flora and fauna• Avoid unnecessary tree felling within the forest buffer. • Restrict construction works to the approved footprint. • Relocate or protect rare plant species identified onsite. • Sensitize workers on wildlife protection and anti-poaching laws. • Maintain waste discipline to avoid attracting wildlife.
Positive social and economic impacts• Prioritize employment of local residents during construction. • Ensure gender inclusivity and fair wages. • Engage local suppliers for materials where possible. • Maintain a grievance redress system for community concerns.
Cultural and heritage resource disturbance• Halt works immediately if archaeological artefacts are encountered. • Notify the National Museums of Kenya (NMK) for expert evaluation. • Secure the discovery site pending guidance. • Conduct cultural sensitivity briefings for workers.
Solid and liquid waste generation• Maintain segregation bins for organic, recyclable, and hazardous waste. • Contract licensed NEMA waste handlers for proper collection and disposal • Maintain functional septic tanks and soak pits. • Monitor and maintain oil interceptors. • Conduct periodic staff training on waste handling.
Increased water demand and potential overuse• Install water-saving fixtures (dual flush, aerated taps). • Harvest rainwater and recycle grey water. • Monitor water consumption monthly. • Educate staff and guests on water conservation. • Engage Naivasha Water Co. for routine supply • monitoring
Energy demand and carbon footprint• Use solar energy for lighting and water heating. • Maintain energy-efficient appliances. • Monitor energy use and carbon footprint quarterly. • Encourage guest participation in energy saving campaigns.
Oil leaks and spills from kitchen or maintenance areas• Use spill containment trays under fuel/oil containers. • Maintain oil interceptors and clean them regularly. • Store oils and lubricants in designated, lined areas. • Train staff on emergency spill response and containment.
Fire risks and emergency preparedness• Maintain fire extinguishers and hydrants; service every 6 months. • Conduct fire drills quarterly. • Ensure fire exits are well marked and accessible. • Train staff in firefighting and evacuation procedures.

Everyone named

Signed byMAMO B. MAMO, Director-General
Places 3Ontulili Forest Station · Sirimon Gate · Mt. Kenya ecosystem
Inspection offices 2Principal Secretary, Ministry of Environment, Climate Change and Foresty · County Director of Environment, Meru County
Issuing authorityNational Environment Management Authority
ProponentEco Witaly Limited
CountyMeru County
Heritage evaluation bodyNational Museums of Kenya
Water supplierNaivasha Water Co.
BodyMinistry of Environment, Climate Change and Foresty
Comment recipientDirector-General, NEMA
Places 6NHIF Building · Ragati Road · Upper Hill · Nairobi · Popo Road · Mombasa Road
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 17565 of 2025, Vol. CXXVII No. 245, 28 November 2025, p. 8447.

Permalink funua.com/notices/2025/17565/.

About this data

Source
Official PDF of Vol. CXXVII No. 245, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · November 2025 · Vol. CXXVII No. 245