Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 18346 of 2025

NEMA invites public comments on Royal Suburb Phase Six Limited's proposed residential apartments on Nairobi/Block 138/1337 in Roysambu.

Official PDF · 1.4 MB

Whole issue, from Kenya Law. This notice starts on printed page 9046.

AI-extractedAgreement between models, not verified accuracy.

What the notice says

  1. Nairobi/Block 138/1337

    Link
    Parcel
    Nairobi/Block 138/1337
    Issuing authority
    National Environment Management Authority
    Proponent
    Royal Suburb Phase Six Limited
    Place
    Roysambu, Kamiti Road, Roysambu Sub-county, Nairobi City County
    Body
    NCA (Excavation methodology required by NCA prior to excavation.), Kplc (Power supply requirements shall be calculated and shared with KPLC.), Ministry of Environment, Climate Change and Forestry (EIA report available for inspection.)
    Office
    Principal Secretary, Ministry of Environment, Climate Change and Forestry (EIA report available for inspection.), Director-General, NEMA (Receives oral or written comments; EIA report available for inspection.), County Director of Environment, Nairobi City County (EIA report available for inspection.)
    Comments
    30 days, as printed
    Comment period start
    from the date of publication of this notice
    Project reference
    NEMA/ENVIS/SR/00309
    Project description
    construct 1No. block building with a total of 885No. residential units
    Building configuration
    a basement for parking, ground floor and 1st to 15th floors
    Residential units
    180No. one bed-room units, 495No. Studio units, 30No. junior studio units, 135No. superior studio units 15No. two bed-room units, 30No. superior one bed-roomed apartments units
    Report url
    www.nema.go.ke

Schedule 11 rows

The following are the anticipated impacts and proposed mitigation measures:-
ImpactsProposed mitigation Measures
Soil erosion• Control earthworks. • Install drainage structures to control flow of storm water. • Ensure and management of excavation activities.
Loss of Vegetation• Only area earmarked for development should be cleared. • Plant trees, shrubs and flowers on remaining open spaces.
Changes in hydrology/ impended drainage/deep excavations• Proper installation of drainage structures. • Ensure efficiency of drainage structures through proper design and maintenance. • Provide gratings to the drainage channels. • A geotechnical survey shall be conducted and the recommendations thereof followed. There shall be no blasting during excavation. • A methodology for excavation shall be generated as required by NCA prior to excavation.
Air pollution• Stockpiles of earth should be sprayed with water or covered during dry seasons. • Provide dust masks for personnel in dusty areas. • Sensitize construction workers on pollution control measures. • Cover all trucks hauling soil, sand and other loose materials.
Noise pollution• Install suitable barriers to shield compressors and other small stationary equipment where necessary. • Display signs to indicate construction activities. • Maintain all equipment. • Adhere to provisions of Noise Prevention and Control Rules, 2005, Legal Notice No. 24 regarding noise limits at the workplace as well as NEMA Noise Excessive Vibration Pollution Control Regulations, 2000.
Increased water demand• Recycling of water at the construction phase where possible. • Make use of roof catchments to provide water i.e. for general purpose. • An alternative water source shall be provided. The proponent shall drill a borehole at the proposed site.
Increased energy demand• Power supply requirements shall be calculated and shared with KPLC as is the requirement. A dedicated transformer for the entire project shall be a consideration. • Alternative power sources (solar) shall also be considered. • Use methods that control climate change.
Security and social impacts• Provision of security guards, CCTV cameras, security lights and other security apparatus during the entire project cycle. • Construction work timings shall only in line with the NEMA licensing conditions.
Increased Water Usage• Make use of roof catchments to provide water i.e. for general purpose. • An alternative water source shall be provided. The proponent shall drill a borehole at the proposed site. • Management of water usage. Avoid unnecessary wastage. • Recycling of water at the construction phase where possible.
Increased generation of waste• Adopt waste minimization at source. • Monitoring the fate of disposed wastes to ensure they are legally land filled at a recognized controlled site. • Adhering to Waste Management Regulations of 2006.
Public health, occupational health and safety• Train staff/workers on occupational health and safety. • Provide full protective gear and workmen’s compensation cover in addition to the right tools and operational instructions and manuals during construction. • Design of sewerage system should be as provided in the plans and should be constructed to approved size and design, standard and of approved materials. • Ensure use of standard construction materials and to the specifications. Avoid undesirable, substandard, hazardous or unauthorized materials during construction and maintenance. • Sensitized staff on social/health issues such as drugs.

Everyone named

Signed byMAMO B. MAMO, Director-General
Places 4Roysambu · Kamiti Road · Roysambu Sub-county · Nairobi City County
Bodies 3NCA · Kplc · Ministry of Environment, Climate Change and Forestry
Offices 3Principal Secretary, Ministry of Environment, Climate Change and Forestry · Director-General, NEMA · County Director of Environment, Nairobi City County
Issuing authorityNational Environment Management Authority
ProponentRoyal Suburb Phase Six Limited
ParcelNairobi/Block 138/1337
Places 6NHIF Building · Ragati Road · Upper Hill · Nairobi · Popo Road · Mombasa Road
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Cites
Legal Notice No. 24 of 2005 (no page yet)

Cite

Kenya Gazette Notice No. 18346 of 2025, Vol. CXXVII No. 258, 11 December 2025, p. 9046.

Permalink funua.com/notices/2025/18346/.

About this data

Source
Official PDF of Vol. CXXVII No. 258, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · December 2025 · Vol. CXXVII No. 258