PlanningGazette notice
Gazette Notice No. 19135 of 2025
National Environment Management Authority invites public comments on Trific Twin Tower Company Limited's proposed Vantage Point Office Towers project in Nairobi City County.
Official PDF · 2.3 MB
Whole issue, from Kenya Law. This notice starts on printed page 9281.
AI-extractedAgreement between models, not verified accuracy.
What the notice says 4
-
plot 17, plot 18, plot 19, L.R. No. 22/365
Link- Parcels
- plot 17, plot 18, plot 19, L.R. No. 22/365
- Issuing authority
- National Environment Management Authority
- Proponent
- Trific Twin Tower Company Limited
- Project
- VANTAGE POINT OFFICE TOWERS PROJECT
- Place
- Two Rivers precinct, Nairobi City County
- Comments recipient
- Director General, NEMA (Report available for inspection during working hours.)
- Inspection office
- County Director of Environment, Nairobi City County (Report available for inspection during working hours.)
- Comments
- 30 days, as printed
- Comment period start
- from the date of publication of this notice
- Project description
- construct a 22 storey office tower consisting of (3No.basements, ground floor, podium with a drop off point and office, 21No. office floors and a roof level) with approximately 700 parking spaces, lifts and other associated facilities and amenities
- Report url
- www.nema.go.ke
- Comment method
- oral or written comments; comments can also be e-mailed to info@nema.go.ke
Schedule 9 rows
| Potential Impact | Proposed Mitigation Measure |
|---|---|
| Clearance of vegetation | • Clearly delineate areas for land preparation/other activities in the field to prevent loss of vegetation outside of designated works areas. • Develop and implement a landscaping plan. • Landscape and plant vegetation in all open areas after the completion of the project. |
| Increased noise and vibrations generation | • Plan the site clearance and construction activities in consultation with the neighbours so that activities with the greatest potential to generate noise and vibration are scheduled accordingly. • Ensure construction activities are undertaken during the day between 0800hrs to 1800hrs. • Sensitization of staff and contractors to foster a culture of shared responsibility in managing noise impacts. • Ensure contractors monitor the noise levels in compliance with the Environmental Management and Co-ordination (Noise and Excessive Vibration Pollution) (Control) Regulations, 2009. |
| Increased solid waste generation | • Use of an Integrated Solid Waste Management System (ISWMS); through a hierarchy of options including source reduction, recycling, composting and reuse. • Comply to the National Waste Colour code i.e. Green for Organic Waste, Black for General Waste and Blue for Recyclable Waste. • Keep a record of data on the quantity and type or classification of waste generated, stored, transported, treated, transformed, reduced, reused, recycled, recovered or disposed of (Waste tracking documentation). • Engage the services of a NEMA Licensed waste handler to collect and transport waste to designated disposal sites. • Manage all waste in line with the requirements of the Environmental Management and Co-ordination (Waste Management) Regulations, 2024 and Sustainable Waste Management Act, 2022. |
| Water pollution | • Adhere to the demarcated riparian land and ensure no construction activities are undertaken at the riparian reserve. • Precautionary measures should be taken to prevent wastewater from being discharged into the environment, particularly during heavy rainfall periods when the risk of run-off is amplified. • Ample facilities should be provided to the workers as per good practice standards requirements and the generated wastewater should be discharged into the right channels, to minimize the risk of discharge into the environment. • Waste from construction activities should be disposed of in an environmentally sound manner to minimize the risk of discharge into the river. • Construction vehicles, machinery and equipment should be parked or stored away from river riparian to ensure spillage of petroleum-based products do not run-off. |
| Increased waste water generation | • Installation of adequate sanitary facilities separate for males and females that are well-maintained and have adequate hand washing facilities. • Contain and sustainably manage potential pollutants of any kind to ensure the water table is not endangered; • Promote recycling of wastewater and storm-water where feasible • Comply with the provisions of the Environmental Management and Coordination (Water Quality) Regulations, 2024. |
| Air pollution | • Regular sprinkling of water on work areas to prevent fugitive dust violations. • Use of dust nets/screens around the construction site to contain and arrest dust. • All construction machinery should be regularly serviced to minimize the generation of hazardous gases. • Regularly monitor air quality levels to ensure compliance with Environmental Management and Coordination (Air Quality) Regulations, 2024. |
| Traffic impact | • Adopt a Traffic Management plan and Delivery Management Plan to enhance traffic movement within the site. • Minimize haulage and transportation of construction material during peak hours. • Proper signage and warnings should be placed at strategic locations. • Any change in the normal programming of activities that will significantly disrupt normalcy along the abutting project roads should be timely communicated. |
| Occupational health and safety risks | • Registration of the site prior to commencement of construction works. • Provide appropriate Personal Protective Equipment (PPE) to workers. • Training of workers in Occupational Safety and Health and Construction Safety. • Obtain a Work Injury Benefit Act (WIBA) cover for employees. • Employing a qualified Health and Safety officer to monitor compliance to the Occupational Safety and Health Act (OSHA), 2007. |
| Increased pressure on the existing resources | • Explore alternative means which are environmentally sound like employing Green Energy Technologies when and where applicable. • Liaise closely with other development partners and Government/Council Departments, to upgrade the existing shared facilities including roads, water distribution systems, etc. |
Everyone named
| Signed by | Mamo B. Mamo, Director-General, National Environment Management Authority |
|---|---|
| Parcels 4 | plot 17 · plot 18 · plot 19 · L.R. No. 22/365 |
| Places 2 | Two Rivers precinct · Nairobi City County |
| Issuing authority | National Environment Management Authority |
| Proponent | Trific Twin Tower Company Limited |
| Project | VANTAGE POINT OFFICE TOWERS PROJECT |
| Comments recipient | Director General, NEMA |
| Inspection office | County Director of Environment, Nairobi City County |
| Law 4 | Environmental Management and Co-ordination Act · Sustainable Waste Management Act · Work Injury Benefits Act · Occupational Safety and Health Act |
Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.
Corrections 0
- Corrected by
- No corrigendum in the issues we hold.
- Cites
- Environmental Management and Co-ordination (Noise and Excessive Vibration Pollution) (Control) Regulations, 2009, Environmental Management and Co-ordination (Waste Management) Regulations, 2024, Sustainable Waste Management Act, Environmental Management and Coordination (Water Quality) Regulations, 2024, Environmental Management and Coordination (Air Quality) Regulations, 2024, Work Injury Benefits Act, Occupational Safety and Health Act
Cite
Kenya Gazette Notice No. 19135 of 2025, Vol. CXXVII No. 266, 24 December 2025, p. 9281.Permalink funua.com/notices/2025/19135/.
About this data
- Source
- Official PDF of Vol. CXXVII No. 266, from Kenya Law
- Extracted by
- AI models
- Model audit
- An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
- Review flag
- None on this notice
Filed under: Planning, 2025 · December 2025 · Vol. CXXVII No. 266