Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 2112 of 2025

The National Environment Management Authority invites public comments on Eastbourne Enterprises Limited's proposed Ikhaya residences affordable housing project in Ruaraka.

Official PDF · 1.6 MB

Whole issue, from Kenya Law. This notice starts on printed page 588.

AI-extractedAgreement between models, not verified accuracy.

Items 2

  1. L.R. NO. NAIROBI/BLOCK 245/327, L.R. No. Nairobi/Block 45/327

    Link
    Parcels
    L.R. NO. NAIROBI/BLOCK 245/327, L.R. No. Nairobi/Block 45/327
    Issuing authority
    National Environment Management Authority
    Proponent
    Eastbourne Enterprises Limited
    Project
    Ikhaya residences
    Place
    Ruaraka, Roysambu Constituency, Nairobi City County
    Body
    County Government (Approves building line, plot coverage and plot ratio.)
    Report
    Environmental Impact Assessment Study Report
    Project description
    992 No. of total units comprising of 4 No. Blocks Type A (136 No. bedsitters, 132 No. one bedroom and 100No. two bedroom units), Block Type B (8No. bedsitters, 64 No. one bedroom and 96No. two bedroom units), Block Type C (136 No. bedsitters, 102 No. one bedroom and 64 No. Two bedroom units) and Block Type D (176 No. one bedroom and 96 No. two bedroom), 400No. parking spaces and associated facilities
  2. Public comments 2

    Link
    Issuing authority
    National Environmental Management Authority, Director-General, National Environment Management Authority (Inspection location (b) and recipient of oral or written comments.)
    Body
    Ministry of Environment, Climate Change and Foresty (Ministry at whose Principal Secretary's office the full report is available for inspection during working hours.)
    Inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty (Inspection location (a).), County Director of Environment, Nairobi City County (Inspection location (c).)
    Place
    NHIF Building (Report inspection address.), Ragati Road (Report inspection address.), Upper Hill (Report inspection address.), Nairobi (Report inspection addresses.), Popo Road (Report inspection address.), Mombasa Road (Report inspection address.), Nairobi City County (County Director of Environment's inspection location.)
    Comments
    30 days, as printed
    Comment period start
    the date of publication of this notice
    Report availability
    The full report of the proposed project is available for inspection during working hours
    Report url
    www.nema.go.ke
    Comment submission
    oral or written comments
    Comment email
    dgnema@nema.go.ke

Schedule 14 rows

ImpactsMitigation Measures
Loss of vegetation• Prohibit unnecessary vegetation clearing. • Encourage sparing the mature trees. • Demarcation and restriction of construction site. • Landscaping/re-vegetation to be done using fast growing species.
Increased traffic flow and road safety concerns• Carry out traffic impact assessment study. • Implement a traffic management plan for the proposed development. • Erect appropriate road safety signage. • Deploying adequate traffic marshals. • Provide adequate construction parking allocation within the project site. • Provide incentives for facility users to prioritize public and Non-motorized transport modes.
Noise pollution and excessive vibration• Ensure use of serviced equipment. • Switch off engines not in use. • Demolition work to be confined to between 8am to 5pm. • Ensure use of earmuffs by workers.
Air pollution, particulate matter and dust emission• Cover all trucks hauling soil, sand and other loose materials. • Avoid open air burning of waste such as paper and plastic containers at the construction site. • Onsite dirt piles or other stockpiled material should be covered, wind breaks installed, water and/or soil stabilizers employed to reduce wind-blown dust emissions. • All workers at the construction site and visitors exposed to dusty conditions must be provided with dust masks and other PPEs. • Regular and prompt maintenance of construction machinery and equipment to minimize generation of hazardous gases. • Institute appropriate dust suppression measures such as regular sprinkling of water on dusty access roads; speed limits; etc.
Public health occupational safety and health• Comply with applicable labor laws such as the Occupational Safety and Health Act, 2007; the Work Injury Benefits Act, 2007, etc. • Staff awareness creation on safety and health issues. • Have trained first aiders and fully equipped First Aid box on site. • Provide and ensure proper use of personal protective equipment i.e. safety boots, helmet, goggles and hand gloves. • Proper supervision of works Hoarding / fencing of the construction site to prevent unauthorized people accessing the site. • Enforce speed limits for trucks and vehicles delivering construction materials. • Proper signage and warning to public of heavy vehicle turning. • The contractor to abide by ESIA licensing conditions.
Solid waste generati• Ensure waste materials are disposed-off to County and NEMA approved sites. • Use of the 3rs – Reduce, Re-use, Re-cycle. • Solid waste to be collected in designated areas for appropriate disposal. • Waste segregation at source. • Engage a NEMA and county licensed waste handler.
Sewerage and wastewater management• Carry out sanitation needs analysis for the project and implement the recommendations. • Comply with EMCA Water Quality Regulations, 2006. • For waste management prevent the contamination of surface or subsurface water. • Proper decommissioning of the sanitary facilities shall be carried out once construction is complete. • Regular monitoring of sewer line to ensure proper working conditions. • Servicing of machinery and equipment to be done at a designated places with a paved surface and oil interceptors.
Increased water demand and consumption• Undertake a water needs analysis for the project. • Set up water reservoirs to buffer against erratic supplies and reduce competition for resource with other users. • Prompt detection and repair of all the water fixtures and fittings to reduce water wastage. • The contractor shall use water bowsers and tankers to bring in water for construction activities i.e., during periods of high-water demand (i.e., during slab formation). • Use water efficient appliances and fixtures for conservation of water during the project cycle.
Emergence and spread of social vices• Installation of security lighting in and around the project site. • Use of local labor force as far practical to avoid construction of a labor camp. • Conduct periodic sensitization forums for employees on ethics, morals, general good behavior and the need for the project to co-exist with the neighbors. • Ensure enforcement of relevant legal policy on sexual harassment and abuse of office. • Contractor employs workers from the immediate area where possible to minimize social conflict and maximize benefits. • Offer awareness, guidance and counselling on HIV/AIDS and other STDs to employees. • Provide condoms to employees.
Disruption of existing natural environment and modification of micro-climate• Development restricted to follow zoning policy/approved density – building line, plot coverage and plot ratio as approved by the County Government. • Careful layout and orientation of buildings to respect wind and sun direction. • Adequate provision of green and open space planted with grass, shrub and tree cover. • Minimum use of reflective building material and finishes for roof, wall and pavement.
Social harmony• Develop a mechanism to maximize use of local labor force. • Dedicated Liaison officer to receive and handle grievance from the neighborhood.
Increased energy demand and consumption• Install and routine maintenance of energy efficient appliances e.g. LED bulbs. • Monitor energy use during construction and operation and set reasonable limit.
• Use of solar energy as an alternative source of energy.
Storm water management• Rainwater harvesting by providing gutters to collect and direct rain water into drains and storage tanks. • Construct drains to standard specifications. • Develop a storm water drainage system and linkage to natural drains.

Everyone named

Signed byMamo B. Mamo, Director-General, National Environment Management Authority
Places 9Ruaraka · Roysambu Constituency · Nairobi City County · NHIF Building · Ragati Road · Upper Hill · Nairobi · Popo Road · Mombasa Road
Issuing authorities 2National Environment Management Authority · National Environmental Management Authority
Parcels 2L.R. NO. NAIROBI/BLOCK 245/327 · L.R. No. Nairobi/Block 45/327
Inspection offices 2Principal Secretary, Ministry of Environment, Climate Change and Foresty · County Director of Environment, Nairobi City County
ProponentEastbourne Enterprises Limited
ProjectIkhaya residences
BodyMinistry of Environment, Climate Change and Foresty
Also namedCounty Government
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 2112 of 2025, Vol. CXXVII No. 36, 21 February 2025, p. 588.

Permalink funua.com/notices/2025/2112/.

About this data

Source
Official PDF of Vol. CXXVII No. 36, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · February 2025 · Vol. CXXVII No. 36