LicencesGazette notice
Gazette Notice No. 4777 of 2025
The Water Services Regulatory Board approves adjusted water and sewerage tariffs for Meru County Rural Water and Sanitation Company for 2024/2025 to 2027/2028.
Official PDF · 1.5 MB
Whole issue, from Kenya Law. This notice starts on printed page 1641.
AI-extractedAgreement between models, not verified accuracy.
Items 3
-
Tariff approval 1
Link- Licensing authority
- Water Services Regulatory Board
- Licensee
- Meru County Rural Water and Sanitation Company (Applied for a review of water services tariffs.)
- Term
- 2024/2025, 2025/2026, 2026/2027 and 2027/2028
- Notice period
- one-month notice from the date of this communication
- Reason
- to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff
- Non functional meter billing
- Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
- Sewerage with water connection
- Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories
- Disconnected account billing
- Disconnected water accounts shall be charged based on the average sewerage charges for the last three months before the disconnection.
- Domestic sewerage without water connection
- Domestic customers without a metered water source (Per Single dwelling unit): Ksh. 350 Per Month
- Other sewerage without water connection
- All other categories: 75% of the volume of water consumed as per the metered source of water, including boreholes, at the rates specified in (1.1) above.
- Indexation
- The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the Water Services Regulatory Board (WASREB) regulations.
- Inflation adjustment
- The inflation adjustment shall come into effect every July of the tariff period, commencing July 2026.
- Sewer only deposit
- Customers with only sewer connection are to be charged a deposit equivalent to a water connection.
-
Tariff approval 2
Link- Licensee
- MERUWASCO
- Body
- WASREB (Approves priority service delivery capital projects and receives quarterly performance reports.)
- Approval conditions
- The conditions attached to this approval, which shall form part of the license conditions of MERUWASCO are:
- Annual budgets
- (ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
- Surpluses
- (iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by WASREB.
- Reporting
- (iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
- Catchment protection
- (v) Catchment protection: The utility shall undertake measures to conserve/ protect catchment areas of their water source as part of corporate social responsibility
- Cost centres
- (vi) Creation of distinct water and sewer cost centres: MERUWASCO will ensure that separate water and sewer cost centres are created and that different records of operations of the two centres are maintained.
- Regulatory levy
- (vii) Regulatory Levy: The Utility is to pay a monthly regulatory levy based on 4% of total turnover which is inclusive of billing of other services and interest income earned.
- Investments
- (viii) Investments: The utility shall undertake the investments in Table 1:
-
Tariff approval 3
Link- Licensee
- MERUWASCO
- Area
- Mitunguu scheme, muriri scheme, Ngundune, Kianjae, Maua, Timau, Nkubu, Mwimbi, Kanyaka
- Office
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Licensing authority
- Water Services Regulatory Board
Schedule 94 rows
| Consumer Categories | Consumption Block (M3) | Approved Tariff (KSh./M3) |
|---|---|---|
| Domestic/Residential | 1-6 | 90 |
| 7-20. | 100 | |
| 21-50 | 105 | |
| 51-100 | 110 | |
| 101-300 | 115 | |
| >300 | 120 | |
| Multi-Dwelling Units | Per M3 | 100 |
| Commercial/Industrial/Government/Institutions | 1-50 | 100 |
| 51-100 | 105 | |
| 101-300 | 115 | |
| >300 | 120 | |
| Public Schools, Colleges and Universities | 1-600 | 90 |
| 601-1200 | 100 | |
| >1200m3 | 110 | |
| Water Kiosks | Per M3 | 85 |
| Item/ Service | Charge (KSh.) |
|---|---|
| Water Deposit | |
| Category of consumer | |
| Domestic | 2,500 |
| Retail shops less than 10m3 | 3,000 |
| Retail shops more than 10m3 | 3,500 |
| Bar and restaurants less than 15 m3 | 4,000 |
| Bar and restaurants more than 15 m3 | 6,000 |
| Hotel class “A” and “B” less than 150 m3 | 12,000 |
| Hotel class “A” and “B” more than 150 m3 | 15,000 |
| Hotel class “C” and ‘D’ less than 150 m3 | 18,000 |
| Hotel class “C” and ‘D’ more than 150 m3 | 20,000 |
| Hospitals and Health centres more than 150 m3 | 20,000 |
| Hospitals and Health centres less than 150 m3 | 12,000 |
| Schools and other institutions more than 200 m3 | 20,000 |
| Schools and other institutions less than 200 m3 | 10,000 |
| Minor construction sites of more than 200 m3 | 15,000 |
| Major construction sites more than 300 m3 | 50,000 |
| Light industries less than 200 m3 | 30,000 |
| Medium industries between 200 m3 and 300 m3 | 50,000 |
| Heavy industries of more than 300 m3 | 100,000 |
| Water Kiosks | 5,000 |
| Other Charges | |
| Service | |
| New water connection fee – Connection size: ½ inch to 1 inch | 2,500 |
| New water connection fee – Connection size: 1.5 inches to 3 inches | 7,500 |
| New water connection fee – Connection size above 3 inches | 15,000 |
| Water Reconnection fee – at meter point | 1,000 |
| Water Reconnection fee – at mains | 5,000 and double deposit |
| Tanker – 8000 & 16,000 litres | 2,500 & 5,000 respectively per tanker within MERUWASCO’s area for all consumers |
| Sale of water per M3 at Bowsing Point (own tanker) | KSh. 90 |
| Replacement of stolen or damaged meters | 100% of the market cost of the meter |
| Meter testing on request | 500 |
| Sewer Connection- Residential/ Domestic | 5,000 |
| Sewer Connection- Commercial, Government, Schools, Universities and Colleges | 7,500 |
| Sewer Connection- Industrial | 15,000 |
| Private sewer unblocking | 2,500 |
| Leak detection services | 1,000 |
| Sewer Reconnection fee | 15,000 |
| Statement of account fees | 200 |
| Cutting off the supply at the request of the consumer | 200 |
| For turning on the supply other than in respect of a first connection | 200 |
| Exhauster Services (Company Exhauster) | 5,000 for other customers and 4,000 for informal settlements |
| Private Exhausters (Dumping into the company’s sewer system) | 15,000 per Truck per month |
| Item/ Service | Charge (KSh.) |
|---|---|
| Illegal water connection -Commercial, Industry, Construction (Fraud) | 100,000 plus estimated consumption during the period of illegality |
| Illegal water connection (Fraud) – Domestic | 30,000 plus estimated consumption during the period of the illegality |
| Overcharging (fraud) at water kiosk | 15,000 |
| Illegal sewer connection- Commercial, Industry, Construction | 100,000 |
| Illegal sewer connection- Domestic, Government, Schools, Universities, & Colleges | 30,000 |
| Self-reconnection after cut-off for non-payment | 5,000 and billing to be backdated from the date of cut-off |
| Surcharge for tampering with meters (this to include meter removal, reversing of meter, etc) | 5,000 |
| Surcharge for direct suction of water from the supply line using a pump | 10,000 |
| Expenditure Item | 2024/25 | 2025/26 | 2026/27 | 2027/28 |
|---|---|---|---|---|
| Operations | 56,532,492 | 60,961,335 | 63,576,876 | 66,420,453 |
| Maintenance | 12,264,794 | 12,878,033 | 13,521,935 | 14,198,032 |
| Regulatory Levy | 2,205,510 | 3,942,917 | 4,032,233 | 4,123,584 |
| Total O&M Costs | 71,002,796 | 77,782,286 | 81,131,045 | 84,742,069 |
| Investment Costs | - | 1,104,000 | 1,904,000 | 1,504,000 |
| Debt Repayment | - | 11,326,607 | 11,326,607 | 11,326,607 |
| Total Costs | 71,002,796 | 90,212,893 | 94,361,652 | 97,572,675 |
| Total Billing (KSh.) | 55,497,217 | 98,572,935 | 100,805,831 | 103,089,599 |
| Collection Efficiency (%) | 95% | 95% | 95% | 95% |
| Projected Revenue | 52,722,357 | 93,644,288 | 95,765,540 | 97,935,119 |
| Total Cost Coverage | 78% | 109% | 107% | 106% |
| Target | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|
| Water Coverage (%) | 92% | 92% | 93% | 93% |
| Water quality standards (%) | 100% Compliance with Standards | |||
| Personnel Expenditure as % of O&M | 40% | 38% | 37% | 37% |
| Maintenance Expenditure as % of O&M | 17% | 17% | 17% | 17% |
| Investment Expenditure as a % of Total Expenditure | 0% | 1% | 2% | 2% |
| Non-Revenue Water | 39% | 38% | 37% | 36% |
| Hours of Supply (Hrs.) | 17 | 18 | 19 | 20 |
| Staff per 1000 connections | 14 | 11 | 10 | 9 |
| Metering ratio (%) | 86% | 88% | 90% | 92% |
| Resale at Kiosk | KSh. 3.00 per 20l Jerry Can |
| Investment | Project Area | Guide | Sample description | Size | Unit | Unit Cost (ksh) | QTY | Total Amt KShs. | 2025/2026 (KSh.) | 2026/2027 (KSh.) | 2027/2028 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| A. Increase water coverage | New Connections in Mitunguu scheme, muriri scheme and reviving of the dormant connections | Purchase of New Meters | Mechanical Cold Water multi-jet water meter class B | DN 15 | No. | 2,000 | 3,500 | 7,000,000 | 1,000,000 | 1,800,000 | 1,400,000 |
| B. Reduce NRW | Purchase of regional Master meters -In the 9 schemes; Muriri, Ngundune, Kianjae, Maua, Timau,Nkubu,Mwimbi,Kanyaka & Mitunguu | Mechanical Cold Water multi-jet water meter class B | 50mm | No | 15,000 | 40 | 600,000 | 30,000 | 30,000 | 30,000 | |
| Mechanical Cold Water multi-jet water meter class B | 80mm | No | 35,000 | 9 | 315,000 | 28,000 | 28,000 | 28,000 | |||
| Mechanical Cold Water multi-jet water meter class B | 100mm | No | 45,000 | 10 | 450,000 | 18,000 | 18,000 | 18,000 | |||
| Mechanical Cold Water multi-jet water meter class B | 150mm | No | 60,000 | 5 | 300,000 | 12,000 | 12,000 | 12,000 | |||
| Mechanical Cold Water multi-jet water meter class B | 200mm | No | 80,000 | 1 | 80,000 | 16,000 | 16,000 | 16,000 | |||
| TOTAL | 8,745,000 | 1,104,000 | 1,904,000 | 1,504,000 |
Everyone named
| Signed by | RICHARD CHERUIYOT, Ag. Chief Executive Officer, Water Services Regulatory Board |
|---|---|
| Areas 9 | Mitunguu scheme · muriri scheme · Ngundune · Kianjae · Maua · Timau · Nkubu · Mwimbi · Kanyaka |
| Licensees 2 | Meru County Rural Water and Sanitation Company · MERUWASCO |
| Licensing authority | Water Services Regulatory Board |
| Body | WASREB |
| Office | Ag. Chief Executive Officer, Water Services Regulatory Board |
| Law | Water Act |
Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.
Corrections 0
- Corrected by
- No corrigendum in the issues we hold.
- Cites
- Water Act
Cite
Kenya Gazette Notice No. 4777 of 2025, Vol. CXXVII No. 72, 11 April 2025, p. 1641.Permalink funua.com/notices/2025/4777/.
About this data
- Source
- Official PDF of Vol. CXXVII No. 72, from Kenya Law
- Extracted by
- AI models
- Model audit
- An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
- Review flag
- None on this notice
Filed under: Licences, 2025 · April 2025 · Vol. CXXVII No. 72