Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 4994 of 2025

The National Environment Management Authority invites public comments on Express View Estate Company Limited's proposed residential development on L.R. No. Nairobi/Block 15/119.

Official PDF · 2.2 MB

Whole issue, from Kenya Law. This notice starts on printed page 1768.

AI-extractedAgreement between models, not verified accuracy.

Items 2

  1. L.R. No. Nairobi/Block 15/119

    Link
    Parcel
    L.R. No. Nairobi/Block 15/119
    Issuing authority
    National Environment Management Authority
    Proponent
    Express View Estate Company Limited
    Place
    Riara Gardens, Riara Road, Kilimani, Nairobi City County
    Power supplier
    KPC (Installation of a solar PV system on the rooftop to supplement KPC supply)
    Proposed development
    a 21 Storey residential building of 4No.Blocks consisting of 440No. Units, 4No.basement and ground floor consisting of 400No. Parking spaces and ground floor. Typical 1st–27th floor will comprise of 176No. One bedroom, 132No. Two bedroom, 132No. Three bedroom units, other associated amenities and facilities
  2. Public comments 2

    Link
    Issuing authority
    National Environment Management Authority
    Body
    Ministry of Environment, Climate Change and Foresty (The full report is available for inspection during working hours at the Principal Secretary's office.)
    Inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty, County Director of Environment, Nairobi City County
    Comment recipient
    Director-General, National Environment Management Authority (The full report is also available for inspection during working hours at this office.)
    Comments
    30 days, as printed
    Comment period start
    the date of publication of this notice
    Comment method
    oral or written comments
    Comment purpose
    to assist the Authority in the decision making process for this project
    Comment email
    dgnema@nema.go.ke
    Report download
    www.nema.go.ke
    Report inspection hours
    during working hours
    Report inspection location a
    Principal Secretary, Ministry of Environment, Climate Change and Foresty, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126–00200, Nairobi.
    Report inspection location b
    Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.

Schedule 14 rows

ImpactsProposed Mitigation Measures
Soil erosion• Control earthworks. • Install drainage structures properly. • Ensure management of excavation activities.
Loss of vegetation• Restore/re-establish vegetation in some parts of the disturbed areas through implementation landscaping program.
Air pollution• All trucks and any other mode of hauling soil sand and other loose materials to and from the site should be covered. • Sprinkling of water on dry soils in excavated areas, pavements. • Use of clean fuels for machines and equipment. • Stockpiles of earth should be sprayed with water or covered during dry seasons. • Provide dust masks for the personnel in dust generation areas. • Sensitize construction workers on pollution control measurers.
Emission of greenhouse gas emission• Installation of a solar PV system on the rooftop to supplement KPC supply thereby abating about GHG emissions. • Implementing energy efficiency mechanisms to reduce energy consumption. • Undertaking annual energy audits to monitor progress and exploit opportunities for energy efficiency.
Fire risks• Install fire alarm with smoke sensors. • Have standby fire extinguishers at the site in case fire erupts. • Declare places with flammable construction materials as “NO SMOKING ZONES” and display conspicuous notices of the same.
Traffic disruption• Properly plan for transportation of materials to ensure that vehicles are optimally filled to reduce the number of trips done or the number of vehicles on the access roads. • Employment of formal flagmen/women to ensure the public safety. • Place clear signage’s at the gate to alert drivers to be cautious about the construction and to look out for entering and/or exiting vehicles.
Noise pollution• Sensitize workforce including drivers of construction vehicles. • Install sound barriers for pile driving activity. • Install portable barriers to shield compressors and other small stationary equipment where necessary. • Display signs to indicate construction activities. • Maintain all equipment; Workers in the vicinity of high-level noise to wear safety and protective gear.
Occupational safety and health• All workers and visitors on site to use mandatory protective gear. • Unattended entry to the project site to be restricted. • Use of efficient and well-maintained machines to lift and transfer materials. • Removal of all dangerous materials that may pose a threat such as metal bars, wires, glass, and broken equipment. • Availing of fully equipped first Aid kitties to help address emergencies. • Warning signs to all users and visitors be placed at appropriate places. • Educate construction workers and tenants on health and safety risks and their prevention.
Public health, occupational health and safety• Train staff/workers on occupational health and safety. • Provide full protective gear and workmen’s compensation cover in addition to the right tools and operational instructions. • Design of sewerage system should be as provided in the plans and should be constructed to approved size and design, standard and of approved materials. • Avoid undesirable, substandard, hazardous or unauthorized materials during construction and maintenance.
Contribution to climate change• Water management; The project should invest in water management strategies like rainwater harvesting, storage facilities, and efficient water use practices. These measures aim to mitigate water scarcity during dry periods and reduce flood risks during heavy rainfall events. • Infrastructure Design: Incorporate resilient features to withstand extreme weather like flooding, storms, and high temperatures. • Energy Efficiency: Implement technologies and practices to reduce greenhouse gas emissions and dependency on fossil fuels. • Biodiversity Conservation: Protect and enhance natural ecosystems to preserve biodiversity and ecosystem services, including reforestation, habitat restoration, and sustainable land management practices.
Insecurity and social impacts• Provision of security guards, CCTV cameras, security lights and other security apparatus during the entire project cycle. • Adhere to work timings in line with the NEMA licensing conditions.
Increased water usage• Installation of motion-sensing taps, urinals, and toilets to automatically switch off once the user leaves the station. • A motion sensor tap would cut up to 85% of annual water usage compared to conventional taps. • Rainwater harvesting: The harvested water would be used for cleaning, flushing toilets, watering plants, etc. • Avail storage tanks.
Increased generation of waste• Build construction workers capacity on sanitation and hygiene practices. • Segregation of waste at the source during the project cycle. • Special attention shall be paid to the sanitary facilities on site.
• Garbage shall be disposed periodically. • Contract a NEMA licensed waste handler.

Everyone named

Signed byMamo B. Mamo, Director-General, National Environment Management Authority
Places 4Riara Gardens · Riara Road · Kilimani · Nairobi City County
Inspection offices 2Principal Secretary, Ministry of Environment, Climate Change and Foresty · County Director of Environment, Nairobi City County
Issuing authorityNational Environment Management Authority
ProponentExpress View Estate Company Limited
ParcelL.R. No. Nairobi/Block 15/119
Power supplierKPC
BodyMinistry of Environment, Climate Change and Foresty
Comment recipientDirector-General, National Environment Management Authority
Places 6NHIF Building · Ragati Road · Upper Hill · Nairobi · Popo Road · Mombasa Road
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 4994 of 2025, Vol. CXXVII No. 77, 17 April 2025, p. 1768.

Permalink funua.com/notices/2025/4994/.

About this data

Source
Official PDF of Vol. CXXVII No. 77, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · April 2025 · Vol. CXXVII No. 77