Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 7427 of 2025

NEMA invites public comments on Elemental Terra Developers Limited's proposed multi-dwelling residential development on L.R. No. Nairobi/Block 31/96.

Official PDF · 0.8 MB

Whole issue, from Kenya Law. This notice starts on printed page 3049.

AI-extractedAgreement between models, not verified accuracy.

What the notice says

  1. L.R. No. Nairobi/Block 31/96

    Link
    Parcel
    L.R. No. Nairobi/Block 31/96
    Issuing authority
    National Environment Management Authority (Received the Environmental Impact Assessment Study Report and invites oral or written comments.)
    Proponent
    Elemental Terra Developers Limited
    Place
    Mawensi Road, Upper Hill, Kibra Sub-county, Nairobi City County, NHIF Building (Report inspection location.), Ragati Road (Address of report inspection location.), Nairobi (Postal addresses of report inspection offices.), Popo Road (Address of report inspection location.), Mombasa Road (Address of report inspection location.)
    Body
    NCWSC (Trunk sewer line available in the area.), Ministry of Environment, Climate Change and Foresty (Ministry at whose Principal Secretary's office the report is available for inspection.)
    Report inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty (The full report is available for inspection during working hours.), County Director of Environment, Nairobi City County (The full report is available for inspection during working hours.)
    Comments recipient
    Director-General, National Environment Management Authority (Receives public comments; the report is also available for inspection at this office.)
    Comments
    30 days, as printed
    Comment period start
    from the date of publication of this notice
    Project description
    a 24 No. storey (2 No.basements, ground plus 24 No. floors) multi dwelling residential development comprising a total of 200 units (40No. one bedroom units, 80 No. two-bedroom units, 80 No. three-bedroom units) swimming pool, communal kitchen, fire pumproom, coffee house, roof gardon, 163 parking spaces, lifts and staircases, associated facilities and amenities
    Report url
    www.nema.go.ke

Schedule 14 rows

The following are the anticipated impacts and proposed mitigation measures:
ImpactsMitigation Measures
Air, noise pollution and vibration• Water sprinkling on driveways. • Switch off engines not in use. • Construction work to be confined to between 8.00 a.m to 6.00 p.m. • Provide and enforce use of PPE e.g ear muffs, aprons, gloves. • Proper servicing of machinery and equipment (oiling and greasing). • Monitor noise levels as per NEMA guidelines.
Health and safety (risks of accidents and injuries to workers)• Education and awareness to all workers. • Procure services of a health and safety officer. • Provide First Aid Kits on site. • Proper signage and warning to public. • Provide clean water and food to the workers. • The contractor to abide by all conditions including health safety and workforce welfare. • Personnel to stick to standard operation procedures. • Personnel to wear complete protective gear. • Provision of fire-fighting equipment. • Comply with Kenyan safety policy and safe working procedures, laws and regulations.
Solid waste generation• Ensure waste materials are disposed off to County and NEMA approved sites. • Use of the 3rs – Reduce, Re-use, Re-cycle. • Solid waste to be collected in designated areas for appropriate disposal. • Waste segregation at source. • Engage a NEMA and county licensed waste handler.
Excessive water use• Harvesting of rain water. • Training and awareness to workers on importance of water conservation and best practices. • Encourage use of alternatives for dust control such as non-toxic biodegradable dust suppressants or polymers that require less water. • Efficient water use in concrete mixing.
Solid waste generation and management• Provide waste disposal bins at strategic points well protected from adverse weather conditions and animals. • Regular inspection and maintenance of the waste disposal systems. • Engage a NEMA licensed waste handler to transport and dispose waste. • Use of the 3rs – Reduce, Re-use, Re-cycle. • Encourage waste segregation at source.
Liquid waste generation and management• Availability of NCWSC trunk sewer line in the area. • Proper connection to the existing sewer line. • Regular inspection and maintenance of the waste disposal systems. • Use of separate storm water drainage channel.
Increased loading on Infrastructure• Provision of adequate parking within the facility. • Have paved driveways. • Encourage rainwater harvesting and water storage tanks. • Provide adequate storm water management system.
Social conflict• Encourage good relation with the neighbours through provision of employment opportunities to the community members (skilled and semi-skilled). • Formation of residents association/Register with the existing association. • Improved livelihood. • Strict adherence to provided ESMP.
Insecurity• secure the premise with a perimeter wall. • Installation of CCTV cameras at strategic points. • Have a entry point that is manned 24 hours. • Construction of gate house.
Building Safety land and building use• Assess the condition of buildings to ascertain usefulness. • Ascertain the Planning development policy.
Accidents/Injuries• Securing the Site by fencing off.
Un-disconnected Services e.g. Power, Water, telephone,septic• Ensure disconnection of all services. • Remove all surface and underground cables and wiring.
Solid waste generation (demolition waste)• Ensure waste materials are disposed of on County and NEMA approved sites. • Ensure re-use of materials that can be re-used. • Use of the 3rs – Reduce, Re-use, Re-cycle.
Noise and Vibration• Ensure use of serviced equipment. • Switch off engines not in use. • Demolition work to be confined to between 8.00 a.m to 5.00 p.m. • Ensure use of earmuffs by workers.

Everyone named

Signed byMAMO B, MAMO, Director-General, National Environment Management Authority
Places 9Mawensi Road · Upper Hill · Kibra Sub-county · Nairobi City County · NHIF Building · Ragati Road · Nairobi · Popo Road · Mombasa Road
Bodies 2NCWSC · Ministry of Environment, Climate Change and Foresty
Report inspection offices 2Principal Secretary, Ministry of Environment, Climate Change and Foresty · County Director of Environment, Nairobi City County
Issuing authorityNational Environment Management Authority
ProponentElemental Terra Developers Limited
ParcelL.R. No. Nairobi/Block 31/96
Comments recipientDirector-General, National Environment Management Authority
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 7427 of 2025, Vol. CXXVII No. 119, 5 June 2025, p. 3049.

Permalink funua.com/notices/2025/7427/.

About this data

Source
Official PDF of Vol. CXXVII No. 119, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · June 2025 · Vol. CXXVII No. 119