Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 7807 of 2025

NEMA invites public comments on Everfor King Company Limited’s proposed residential apartments on Plot L.R. No. Nairobi/Block 34/443 in Westlands.

Official PDF · 2.1 MB

Whole issue, from Kenya Law. This notice starts on printed page 3220.

AI-extractedAgreement between models, not verified accuracy.

What the notice says

  1. Plot L.R. No. Nairobi/Block 34/443

    Link
    Parcel
    Plot L.R. No. Nairobi/Block 34/443
    Issuing authority
    National Environment Management Authority
    Proponent
    Everfor King Company Limited
    Place
    Westlands Road, Westlands, Nairobi City County, Nairobi
    Body
    NCA (Excavation methodology generated as required by NCA.), Ministry of Environment, Climate Change and Foresty (Ministry at which the report is available for inspection.)
    Inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty (The full report is available for inspection during working hours.), County Director of Environment, Nairobi City County (The full report is available for inspection during working hours.)
    Comment recipient
    Director-General, NEMA (Receives oral or written comments; the full report is also available for inspection at this office.)
    Comments
    30 days, as printed
    Comment period start
    the date of publication of this notice
    Project description
    a 25 storey( 3No. basements, ground, mezzanine floor plus 25 No. floors) residential block comprising a total of 296 units (96No. small one bedroom units and 200No. big one-bedroom units) parking spaces, lifts and staircases, other associated amenities and facilities
    Report url
    www.nema.go.ke

Schedule 10 rows

ImpactsProposed Mitigation Measures
Soil erosion• Control earthworks. • Install drainage structures to control flow of storm water. • Ensure and management of excavation activities.
Loss of vegetation• Only area earmarked for development should be cleared. • Plant trees, shrubs and flowers on remaining open spaces.
Changes in hydrology/ impended drainage/deep excavations• proper Installation of drainage structures. • Install cascades to break the impact of water flowing in the drains. • Ensure efficiency of drainage structures through proper design and maintenance. • Provide gratings to the drainage channels. • A geotechnical survey shall be conducted and the recommendations thereof followed. There shall be no blasting during excavation. • A methodology for excavation has been generated as required by NCA.
Air pollution• Stockpiles of earth should be sprayed with water or covered during dry seasons. • Provide dust masks for personnel in dusty areas. • Sensitize construction workers on pollution control measures. • Cover all trucks hauling soil, sand and other loose materials.
Noise pollution• Install suitable barriers to shield compressors and other small stationary equipment where necessary. • Display signs to indicate construction activities. • Maintain all equipment. • The working hours should be in line with NEMA licensing conditions. • Adhere to provisions of Noise Prevention and Control Rules 2005, Legal Notice no. 24 regarding noise limits at the workplace as well as NEMA Noise Excessive Vibration Pollution Control Regulations, 2000.
Public health, occupational health and safety• Train staff/workers on occupational health and safety. • Provide full protective gear and workmen’s compensation cover in addition to the right tools and operational instructions and manuals during construction. • Design of sewerage system should be as provided in the plans and should be constructed to approved size and design, standard and of approved materials. • Ensure use of standard construction materials and to the specifications. Avoid undesirable, substandard, hazardous or unauthorized materials during construction and maintenance. • Sensitized staff on social/health issues such as drugs.
Road traffic disruption• No overloading of trucks and good driving practices to be practiced. • Suitable junction/access point to be provided. • Use of appropriate and legible signage. • Employment of formal flagmen/women to ensure the public safety. • Follow the recommendations of the traffic management plan.
Insecurity and social impacts• Provision of security guards, CCTV cameras, security lights and other security apparatus during the entire project cycle. • Construction work timings shall only in line with the NEMA licensing conditions
Increased water usage• An alternative water source shall be provided. The proponent shall drill a borehole at the proposed site. • Management of water usage. Avoid unnecessary wastage. • Recycling of water at the construction phase where possible. • Make use of roof catchments to provide water i.e. for general purpose.
Increased generation of waste• Adopt waste minimization at source. • Monitoring the fate of disposed wastes to ensure they are legally land filled at a recognized controlled site. • Adhering to Waste Management Regulations of 2006.

Everyone named

Signed byMAMO B. MAMO, Director-General
Places 4Westlands Road · Westlands · Nairobi City County · Nairobi
Bodies 2NCA · Ministry of Environment, Climate Change and Foresty
Inspection offices 2Principal Secretary, Ministry of Environment, Climate Change and Foresty · County Director of Environment, Nairobi City County
Issuing authorityNational Environment Management Authority
ProponentEverfor King Company Limited
ParcelPlot L.R. No. Nairobi/Block 34/443
Comment recipientDirector-General, NEMA
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Cites
Legal Notice No. 24 of 2005 (no page yet), NEMA Noise Excessive Vibration Pollution Control Regulations, 2000, Waste Management Regulations of 2006

Cite

Kenya Gazette Notice No. 7807 of 2025, Vol. CXXVII No. 125, 13 June 2025, p. 3220.

Permalink funua.com/notices/2025/7807/.

About this data

Source
Official PDF of Vol. CXXVII No. 125, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · June 2025 · Vol. CXXVII No. 125