PlanningGazette notice
Gazette Notice No. 8144 of 2025
NEMA invites public comments on Festus Mwaniki Lonzi's proposed residential development in Donholm Phase 8, Embakasi East, Nairobi City County.
Official PDF · 1.3 MB
Whole issue, from Kenya Law. This notice starts on printed page 3292.
AI-extractedAgreement between models, not verified accuracy.
What the notice says 9
-
L.R NO. NAIROBI BLOCK 82/7034, 35, 36, 37, 38, 39, 41, 42, 45
Link- Parcels
- L.R NO. NAIROBI BLOCK 82/7034, 35, 36, 37, 38, 39, 41, 42, 45
- Issuing authority
- National Environment Management Authority
- Proponent
- Festus Mwaniki Lonzi
- Place
- DONHOLM PHASE 8, Embakasi East, Nairobi City County
- Body
- Ministry of Environment, Climate Change and Foresty (Report available for inspection at the Principal Secretary's office.)
- Inspection office
- Principal Secretary, Ministry of Environment, Climate Change and Foresty, County Director of Environment, Nairobi City County
- Comment recipient
- Director-General, NEMA (Report also available for inspection.)
- Power supplier
- KPL (Solar PV system proposed to supplement KPL supply.)
- Comments
- 30 days, as printed
- Comment period start
- from the date of publication of this notice
- Comment method
- oral or written comments
- Project description
- 10No storey(Ground floor parking spaces, 180 No. one bedroom and 40No. bedsitters units) totaling to 220 residential units, overhead and underground water storage facility, power and a stand-by generator, associated facilities and amenities
- Report url
- www.nema.go.ke
- Parcel references
- L.R NO. NAIROBI BLOCK 82/7034, 35, 36,37,38,39,41,42,45
Schedule 11 rows
| Possible Impacts | Mitigation Measures |
|---|---|
| Soil erosion | • Control earthworks; install drainage structures properly, ensure management of excavations activities. |
| Air pollution | • Stockpiles of earth should be sprayed with water or covered during the dry seasons. • Provide dust masks for the personnel in dust generation areas; Sensitize construction workers on pollutions control measures. |
| Noise pollution | • Sensitize workforce including drivers of construction vehicles; Install sound barriers for pile driving activity. • Install portable barriers to shield compressors and other small stationary equipment where necessary. • Display signs to indicate construction activities. • Maintain all equipment, Workers in the vicinity of high level noise to wear safety protective gear. |
| Exhaust emissions | • Vehicles idling time to be minimized; Equipment shall be properly serviced and maintained. |
| Increased water use | • Installation of motion sensing taps to automatically switch off ;Rainwater harvesting to be done; Avail storage tanks. |
| Waste management | • Garbage shall be disposed periodically; Contract a NEMA licensed waste handler. |
| Public health and occupa safety | • Ensure proper solid waste disposal and collection facilities. • Ensure dustbin cubicles are protected from animals. • Provide safety gears for all personnel. • Proper treatment of waste waters. |
| Emission of greenhouse gas | • Installation of Solar PV system to supplement KPL supply. • Implantation of energy efficiency mechanism to reduce energy consumption. • Undertaking annual energy audits to monitor progress for efficiency. |
| Climate change ris vulnerability | • Water management. • Invest in water management strategies like rainwater harvesting. • Efficient water use practices to mitigate water scarcity during dry periods and reduce floods risks during heavy rainfall events. • Infrastructure Designs. • Incorporate resilient features to withstand extreme weather like flooding storms and high temperatures. • Energy Efficiency. • Implement technologies and practice to reduce greenhouse gas emissions and dependency on fossils fuels. |
| Traffic disruption | • Plan transportation of materials so as to reduce on the number of trips or the number of vehicles on the access roads. • Employment of flagmen to ensure public safety. • Signage’s to alert drivers to be cautious. |
| Fire risks | • Install fire alarm with smoke sensors. • Have standby fire extinguishers at the site. • Declare places with flammable materials as “NO SMOKING ZONES” and display Conspicuous notices of the same. |
Everyone named
| Signed by | MAMO B. MAMO, Director-General |
|---|---|
| Parcels 9 | L.R NO. NAIROBI BLOCK 82/7034 · 35 · 36 · 37 · 38 · 39 · 41 · 42 · 45 |
| Places 3 | DONHOLM PHASE 8 · Embakasi East · Nairobi City County |
| Inspection offices 2 | Principal Secretary, Ministry of Environment, Climate Change and Foresty · County Director of Environment, Nairobi City County |
| Issuing authority | National Environment Management Authority |
| Proponent | Festus Mwaniki Lonzi |
| Body | Ministry of Environment, Climate Change and Foresty |
| Comment recipient | Director-General, NEMA |
| Power supplier | KPL |
| Places 6 | NHIF Building · Ragati Road · Upper Hill · Nairobi · Popo Road · Mombasa Road |
| Law | Environmental Management and Co-ordination Act |
Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.
Corrections 0
- Corrected by
- No corrigendum in the issues we hold.
- Refers to
- No other notices.
Cite
Kenya Gazette Notice No. 8144 of 2025, Vol. CXXVII No. 132, 20 June 2025, p. 3292.Permalink funua.com/notices/2025/8144/.
About this data
- Source
- Official PDF of Vol. CXXVII No. 132, from Kenya Law
- Extracted by
- AI models
- Model audit
- An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
- Review flag
- None on this notice
Filed under: Planning, 2025 · June 2025 · Vol. CXXVII No. 132