Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

PlanningGazette notice

Gazette Notice No. 8679 of 2025

NEMA invites public comments on Macaash Investment Limited's proposed residential and commercial development along Kasuku lane, Kilimani, Nairobi County.

Official PDF · 1.4 MB

Whole issue, from Kenya Law. This notice starts on printed page 4048.

AI-extractedAgreement between models, not verified accuracy.

What the notice says 2

  1. L.R. No. Nairobi Block 19/104, Nairobi Block 19/510

    Link
    Parcels
    L.R. No. Nairobi Block 19/104, Nairobi Block 19/510
    Issuing authority
    National Environment Management Authority
    Proponent
    Macaash Investment Limited
    Place
    Kasuku lane, Kilimani
    County
    Nairobi City County
    Body
    Ministry of Environment, Climate Change and Foresty (Ministry where the report is available for inspection.), KPC (Supply to be supplemented by a rooftop solar PV system.)
    Office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty (Report available for inspection during working hours.), Director-General, NEMA (Receives oral or written comments; report available for inspection during working hours.), County Director of Environment, Nairobi City County (Report available for inspection during working hours.)
    Comments
    30 days, as printed
    Comment period start
    from the date of publication of this notice
    Project description
    19No. floors (2No. basement, mezzanine floor, ground plus 19No. floors) residential cum commercial building comprising a total of 141 shops and 240 residential units (32No. one-bedroom units, 96No. two-bedroom units, 32No. three-bedroom units, 32No. four-bedroom units, 48No. five bedroom units) conference halls, gym, kids play area, swimming pool, madrassa, 283 parking spaces, lifts and staircases, associated facilities and amenities
    Report url
    www.nema.go.ke
    Comment submission
    Oral or written comments to the Director General, NEMA; comments can also be e-mailed to dgnema@nema.go.ke.

Schedule 14 rows

The following are the anticipated impacts and proposed mitigation measures:
Possible ImpactsMitigation Measures
Soil erosion• Control earthworks; Install drainage structures properly; Ensure management of excavation activities.
Vegetation disturbance• Restore/re-establish vegetation in some parts of the disturbed areas through implementation landscaping programme.
Air pollution• Stockpiles of earth should be sprayed with water or covered during dry seasons; Provide dust masks for the personnel in dust generation areas; Sensitize construction workers on pollution control measures.
Noise pollution• Sensitize workforce including drivers of construction vehicles; Install sound barriers for pile driving activity; Install portable barriers to shield compressors and other small stationary equipment where necessary; Display signs to indicate construction activities; Maintain all equipment; Workers in the vicinity of high-level noise to wear safety and protective gear.
Dust generation• Spray stock piles of earth with water; Avoid pouring dust materials from elevated areas to ground; Cover all trucks hauling soil, sand and other loose materials; Provide dust screen where necessary.
Exhaust emissions• Vehicle idling time shall be minimized; Equipment shall be properly serviced and maintained.
Increased Water Use• Installation of motion-sensing taps, urinals, and toilets to automatically switch off once the user leaves the station. A motion sensor tap would cut up to 85% of annual water usage compared to conventional taps. Rainwater harvesting: The harvested water would be used for cleaning, flushing toilets, watering plants, etc. • Avail storage tanks.
Waste Management• Special attention shall be paid to the sanitary facilities on site; garbage shall be disposed periodically. Contract a NEMA licensed waste handler.
Emission of greenhouse gas emission• Installation of a solar PV system on the rooftop to supplement KPC supply thereby abating about GHG emissions. Implementing energy efficiency mechanisms to reduce energy consumption. Undertaking annual energy audits to monitor progress and exploit opportunities for energy efficiency.
Public health and occupational safety• Ensure proper solid waste disposal and collection facilities; Ensure dustbin cubicles are protected from animals, rains and are well covered; Provide suitable safety gear for all personnel; Proper treatment of waste water.
Climate change risks and vulnerability• Water management; The project should invest in water management strategies like rainwater harvesting, storage facilities, and efficient water use practices. These measures aim to mitigate water scarcity during dry periods and reduce flood risks during heavy rainfall events. • Infrastructure design: Incorporate resilient features to withstand extreme weather like flooding, storms, and high temperatures. • Energy efficiency: Implement technologies and practices to reduce greenhouse gas emissions and dependency on fossil fuels. • Biodiversity conservation: Protect and enhance natural ecosystems to preserve biodiversity and ecosystem services, including reforestation, habitat restoration, and sustainable land management practices.
Traffic disruption• Properly plan for transportation of materials to ensure that vehicles are optimally filled to reduce the number of trips done or the number of vehicles on the access roads; Employment of formal flagmen/women to ensure the public safety; Place clear signage’s at the gate to alert drivers to be cautious about the construction and to look out for entering and/or exiting vehicles.
Fire risks• Install fire alarm with smoke sensors; Have standby fire extinguishers at the site in case fire erupts; Declare places with flammable construction materials as ‘’NO SMOKING ZONES’’ and display conspicuous notices of the same.
Encroachment of the area• Demarcate the project area affected by construction activities to prevent unnecessary interference with areas not meant for proposed project. • Avoid encroachment into road reserves in totality.

Everyone named

Signed byMAMO B, MAMO, Director-General
Offices 3Principal Secretary, Ministry of Environment, Climate Change and Foresty · Director-General, NEMA · County Director of Environment, Nairobi City County
Parcels 2L.R. No. Nairobi Block 19/104 · Nairobi Block 19/510
Places 2Kasuku lane · Kilimani
Bodies 2Ministry of Environment, Climate Change and Foresty · KPC
Issuing authorityNational Environment Management Authority
ProponentMacaash Investment Limited
CountyNairobi City County
Places 6NHIF Building · Ragati Road · Upper Hill · Nairobi · Popo Road · Mombasa Road
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 8679 of 2025, Vol. CXXVII No. 139, 27 June 2025, p. 4048.

Permalink funua.com/notices/2025/8679/.

About this data

Source
Official PDF of Vol. CXXVII No. 139, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · June 2025 · Vol. CXXVII No. 139