Gazette Notice No. 9467 of 2025

National Environment Management Authority invites public comments on KCA University's proposed academic building on L.R. No.28799/1 in Ruaraka, Nairobi City County.

Official PDF · 1.5 MB

Whole issue, from Kenya Law. This notice starts on printed page 4390.

AI-extractedAgreement between models, not verified accuracy.

Items 2

  1. L.R. No.28799/1

    Link
    Parcel
    L.R. No.28799/1
    Issuing authority
    National Environment Management Authority (Has received the Environmental Impact Assessment Study Report.)
    Proponent
    KCA University
    Place
    Ruaraka, Nairobi City County
    Project
    Proposed multi-level academic building for KCA University
    Building description
    10 storey (basement, ground plus 10 floors) academic building
    Total area
    27,468m2
    Facilities
    parking, restaurant, ATMs, games room, lecture/seminar rooms, study rooms, incubation labs, kitchen, offices, meeting rooms, associated facilities and amenities
  2. Public comments 2

    Link
    Issuing authority
    National Environmental Management Authority
    Body
    Ministry of Environment, Climate Change and Foresty (The full report is available for inspection during working hours at the Principal Secretary's address.)
    Inspection office
    Principal Secretary, Ministry of Environment, Climate Change and Foresty, County Director of Environment, Nairobi City County
    Comments recipient
    Director General, NEMA (The full report is also available for inspection during working hours at this office.)
    Place
    Nairobi City County, Nairobi
    Comments
    30 days, as printed
    Comment period start
    the date of publication of this notice
    Comment submission
    oral or written comments
    Comment purpose
    to assist the Authority in the decision making process for this project
    Inspection location a
    Principal Secretary, Ministry of Environment, Climate Change and Foresty, NHIF Building, 12th Floor, Ragati Road, Upper Hill, Upper Hill, P.O. Box 30126–00200, Nairobi
    Inspection location b
    Director General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
    Report download c
    A copy of the EIA report can be downloaded at www.nema.go.ke
    Inspection hours
    during working hours
    Comment email
    dgnema@nema.go.ke

Schedule 12 rows

ImpactsMitigation Measures
Extraction and use of building materials• Use of eco-friendly and sustainable building materials. • Obtain materials from approved sources and those who use environmental friendly processes. • Ensure accurate budgeting and estimation of actual construction material requirements to ensure that only amount of material necessary is ordered. • Ensure that damage or loss of materials at the construction site is kept minimal through proper storage. • Use recycled, refurbished or salvaged materials to reduce the use of raw materials and divert material from landfills.
Demolition of Undesirable structures• Apply for demolition permit from relevant authorities before commencing the demolition. • Provide workers with PPEs. • Comply with EMCA 1999 revised 2015 and all attendant regulations and laws of Kenya.
Air Quality Degradation• Provide 2.4m high hoarding along site boundary. • Provide effective dust screen, sheeting or netting around the building. • Water all active construction areas when necessary. • Cover all trucks hauling soil, sand and other loose Materials. • Down wash of trucks (tyres) prior to departure from site. • Speed control for vehicles visiting site. • Use of dust masks by people on site and other PPEs. • Minimize vehicles idling time. • Sensitize truck drivers to avoid unnecessary racing of vehicle engines at loading/offloading points and parking areas, and to switch off vehicle engines at these points.
Noise and Vibration• Sensitize construction vehicle drivers and machinery operators to switch off engines of vehicles or machinery not being used. • Use of machinery and equipment operating optimally and with operational noise mufflers. • Install portable barriers to shield noisy equipment where necessary and locate stationary noise sources as far from existing sensitive receptors as possible. • Ensure that construction machinery are kept in good condition to reduce noise generation. • Provide appropriate PPE to operators and workers. • Construction program should adapt to academic sessions.
Vegetation Clearance• Cutting down trees should be avoided unless absolutely necessary. • Develop a revegetation/ landscaping plan to be implemented after project is completed.
Deep Excavation Risks• Conduct a thorough geotechnical investigation to assess soil conditions, groundwater levels, and potential risks before excavation begins. • Implement appropriate shoring and support systems such as soldier piles, sheet piles, secant piles, or retaining walls to stabilize excavation walls and prevent collapse. • Implement effective groundwater control methods to manage water inflow during excavation. • Regularly inspect and maintain the stability of the excavation walls and slopes. • Develop a detailed emergency response plan that outlines procedures to follow in case of unexpected ground movement, structural instability, or other emergencies.
Increased Energy Demand• Ensure electrical equipment, machinery and lights are switched off when not being used. • Ensure planning of transportation of materials to ensure that fossil fuels (diesel, petrol) are not consumed in excessive amounts. • Monitor energy use during construction and set targets for reduction of energy use. • Sensitization on efficient use of energy.
Increased traffic and obstruction• Develop and implement traffic management plan. • Ensure all construction vehicles to and from the construction site use the designated Entry/Exit to the project site. • All transportation of construction raw materials and excavated materials are to be conducted at traffic off peak hours only. • Sensitize truck drivers to avoid unnecessary road obstruction. • Cover all trucks hauling soil, sand and other loose materials to avoid spillage and dust emissions that may interfere with smooth motoring.
Safety and health including accidents• Ensure security guards and adequate lighting within and around the construction site. • Install safety signages. • Keep surveillance and ensure daily toolbox talks. • Cordon off active sites to keep of the public. • Provide a well-stocked on site First Aid Box. • Suitable, efficient, clean, well-lit and adequate sanitary conveniences should be provided for construction workers. • Ensure that equipment and work tasks are adapted to fit workers and their ability including protection against mental strain. • Design and develop a comprehensive Site Specific Safety and Health Management Plan. • Absolute compliance with OSHA 2007.
Damages to existing Utilities and Related Inconveniences• Adjacent corridor should remain intact and available for use by area community. • Design and construction to avoid unnecessary damages to utilities. • Reconnect all damaged utilities in good time. • Provide for utility ducts for future crossing facilities. • Continuous consultations with area community.
Project area community and their social rights• Respect the rights and resources for area communities in relation to properties and service utilities. • Protect community facilities and properties and resolve any issues that may arise amicably and promptly. • Community Sensitisation and proper grievance Redress mechanism.
Surface and groundwater contamination• Hazardous substance control and emergency response plan that will include preparations for quick and safe cleanup of accidental spills. • Hazardous-materials handling procedures to reduce the potential for a spill during construction to be prescribed. • Identify areas where refueling and vehicle maintenance activities and storage of hazardous materials, if any, will be permitted. • Stagnant water, will be collected during construction contained and disposed of in accordance with all applicable regulations.

Everyone named

Signed byMamo B. Mamo, Director-General, National Environment Management Authority
Places 3Ruaraka · Nairobi City County · Nairobi
Issuing authorities 2National Environment Management Authority · National Environmental Management Authority
Inspection offices 2Principal Secretary, Ministry of Environment, Climate Change and Foresty · County Director of Environment, Nairobi City County
ProponentKCA University
ParcelL.R. No.28799/1
BodyMinistry of Environment, Climate Change and Foresty
Comments recipientDirector General, NEMA
LawEnvironmental Management and Co-ordination Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Cites
EMCA 1999 revised 2015, OSHA 2007

Cite

Kenya Gazette Notice No. 9467 of 2025, Vol. CXXVII No. 151, 11 July 2025, p. 4390.

Permalink funua.com/notices/2025/9467/.

About this data

Source
Official PDF of Vol. CXXVII No. 151, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Planning, 2025 · July 2025 · Vol. CXXVII No. 151