LicencesGazette notice
Gazette Notice No. 3553 of 2025
Water Services Regulatory Board approves adjusted water and sewerage tariffs for Naivasha Water and Sanitation Company for 2024/2025 to 2028/2029.
Official PDF · 1.7 MB
Whole issue, from Kenya Law. This notice starts on printed page 1265.
AI-extractedAgreement between models, not verified accuracy.
Items 3
-
Tariff approval 1
Link- Licensing authority
- Water Services Regulatory Board
- Licensee
- Naivasha Water and Sanitation Company
- Term
- 2024/2025 to 2028/2029
- Notice period
- one-month notice from the date of this communication
- Reason
- to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff
- Non functional meter billing
- Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
- Sewerage with water connection
- Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories
- Disconnected account sewerage
- Disconnected water accounts shall be charged based on the average sewerage charges for the last three months before the disconnection.
- Domestic sewerage without metered water
- Domestic customers without a metered water source (Per single dwelling unit): KSh. 350 per month
- Other sewerage without water connection
- All other categories: 75% of the volume of water consumed as per the metered source of water, including boreholes, at the rates specified in (1.1) above
- Annual indexation
- The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the Water Services Regulatory Board (WASREB) regulations.
- Inflation adjustment
- The inflation adjustment shall come into effect every July of the tariff period, commencing July 2026.
- Sewer only deposit
- Customers with only sewer connection are to be charged a deposit equivalent to a water connection.
-
Tariff approval 2
Link- Licensee
- NAIVAWASCO
- Licensing authority
- WASREB
- Cost summary
- Below is the summary of the recommended cost structure that makes up the total costs to be incurred by NAIVAWASCO during the tariff period:
- Approval conditions
- The conditions attached to this approval, which shall form part of the license conditions of NAIVAWASCO, are:
- Service delivery conditions
- i. Service Delivery Conditions attached to the Tariff
- Annual budgets
- ii. Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
- Surpluses
- iii. Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by WASREB.
- Reporting
- iv. Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
- Catchment protection
- v. Catchment protection: The utility shall undertake measures to conserve/ protect catchment areas of their water source as part of corporate social responsibility
- Cost centres
- vi. Creation of distinct water and sewer cost centres: NAIVAWASCO will ensure that separate water and sewer cost centres are created and that different records of operations of the two centres are maintained.
- Sanitation levy
- vii. Ring Fencing Sanitation Levy: WSP shall establish a dedicated account exclusively for the sanitation Levy funds, ensuring they are securely ring-fenced. Any expenditure from this account shall be subject to WASREB's prior approval.
- Investments
- viii. Investments: The utility shall undertake the investments in Table 1:
-
Tariff approval 3
Link- Licensing authority
- Water Services Regulatory Board
- Office
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Place
- Karate Police post (Water Network expansions (Small projects)), Governor area (Water Network expansions (Small projects)), Kinungi Zone (Water Network expansions (Small projects)), DTI (DTI production upgrade), Subericol (Subericol sewer project), Naivasha (Sewer Network expansions (Small projects)), Deliverance (Subericol sewer project), Threeways (Lower CCCR Sewer Project)
- Project landmark
- Milimani Primary (Subericol sewer project), Gem Hotel (Lower CCCR Sewer Project)
Schedule 99 rows
| Consumer Categories | Consumption Block (M3) | Approved Tariff (KSh./M3) |
|---|---|---|
| Domestic/Residential | 1-6 | 110 |
| Domestic/Residential | 7-20. | 120 |
| Domestic/Residential | 21-50 | 130 |
| Domestic/Residential | 51-100 | 140 |
| Domestic/Residential | 101-300 | 150 |
| Domestic/Residential | >300 | 160 |
| Multi-Dwelling Units | Per M3 | 130 |
| Commercial/Industrial/Government/Institutions | 1-50 | 130 |
| Commercial/Industrial/Government/Institutions | 51-100 | 140 |
| Commercial/Industrial/Government/Institutions | 101-300 | 150 |
| Commercial/Industrial/Government/Institutions | >300 | 160 |
| Public Schools, Colleges and Universities | 1-600 | 120 |
| Public Schools, Colleges and Universities | 601-1200 | 140 |
| Public Schools, Colleges and Universities | >1200m3 | 160 |
| Post-paid Water Kiosks | Per M3 | 100 |
| Pre-paid Water Kiosks | Per M3 | 100 |
| Item/Service | Charge (Ksh.) |
|---|---|
| Sanitation Levy (5% of water bill) | 5% of water Bill |
| Category of consumer | Charge (Ksh.) |
|---|---|
| Domestic | 2,500 |
| Retail shops less than 10m3 | 3,000 |
| Retail shops more than 10m3 | 3,500 |
| Bar and restaurants less than 15 m3 | 4,000 |
| Bar and restaurants more than 15 m3 | 6,000 |
| Hotel class “A” and “B” less than 150 m3 | 12,000 |
| Hotel class “A” and “B” more than 150 m3 | 15,000 |
| Hotel class “C” and ‘D’ less than 150 m3 | 18,000 |
| Hotel class “C” and ‘D’ more than 150 m3 | 20,000 |
| Hospitals and Health centres more than 150 m3 | 20,000 |
| Hospitals and Health centres less than 150 m3 | 12,000 |
| Schools and other institutions more than 200 m3 | 20,000 |
| Schools and other institutions less than 200 m3 | 10,000 |
| Minor construction sites of more than 200 m3 | 15,000 |
| Major construction sites more than 300 m3 | 50,000 |
| Light industries less than 200 m3 | 30,000 |
| Medium industries between 200 m3 and 300 m3 | 50,000 |
| Heavy industries of more than 300 m3 | 100,000 |
| Water kiosks | 5,000 |
| Service | Charge (Ksh.) |
|---|---|
| New water connection fee – Connection size: ½ inch to 1 inch | 2,500 |
| New water connection fee – Connection size: 1.5 inches to 3 inches | 7,500 |
| New water connection fee – Connection size above 3 inches | 15,000 |
| Water Reconnection fee – at meter point | 1,000 |
| Water Reconnection fee – at mains | 5,000 and double deposit |
| Tanker – 8000 and 16,000 litres | 2,500 & 5,000 respectively per tanker within NAIVAWASCO’s area for all consumers |
| Sale of water per M3 at Bowsing Point (own tanker) | Ksh. 130 |
| Replacement of stolen or damaged meters | 100% of the market cost of the meter |
| Meter testing on request | 500 |
| Sewer Connection– Residential/ Domestic | 5,000 |
| Sewer Connection– Commercial, Government, Schools, Universities and Colleges | 7,500 |
| Sewer Connection– Industrial | 15,000 |
| Private sewer unblocking | 2,500 |
| Leak detection services | 1,000 |
| Sewer Reconnection fee | 15,000 |
| Statement of account fees | 200 |
| Cutting off the supply at the request of the consumer | 200 |
| For turning on the supply other than in respect of a first connection | 200 |
| Exhauster Services (Company Exhauster) | 5,000 for other customers and 4,000 for informal settlements |
| Private Exhausters (Dumping into the company’s sewer system) | 15,000 per Truck per month |
| Item/Service | Charge (Ksh.) |
|---|---|
| Illegal water connection –Commercial, Industry, Construction (Fraud) | 100,000 plus estimated consumption during the period of illegality |
| Illegal water connection (Fraud) – Domestic | 30,000 plus estimated consumption during the period of the illegality |
| Overcharging (fraud) at water kiosk | 15,000 |
| Illegal sewer connection- Commercial, Industry, Construction | 100,000 |
| Illegal sewer connection- Domestic, Government, Schools, Universities and Colleges | 30,000 |
| Self-reconnection after cut-off for non-payment | 5,000 and billing to be backdated from the date of cut-off |
| Surcharge for tampering with meters (this to include meter removal, reversing of meter, etc) | 5,000 |
| Surcharge for direct suction of water from the supply line using a pump | 10,000 |
| Expenditure Item | 2023/24 | 2024/25 | 2025/26 | 2026/27 | 2027/28 | 2028/29 |
|---|---|---|---|---|---|---|
| Operations | 204,923,778 | 232,638,508 | 257,884,245 | 277,158,326 | 290,721,902 | 305,051,165 |
| Maintenance | 14,675,772 | 25,106,331 | 30,860,021 | 25,142,751 | 31,013,825 | 29,270,544 |
| Regulatory Levy | 8,615,951 | 13,493,172 | 13,886,507 | 15,141,321 | 16,208,682 | 17,204,504 |
| Total O&M Costs | 228,215,501 | 271,238,011 | 302,630,773 | 317,442,398 | 337,944,408 | 351,526,213 |
| Investment Costs | - | 37,881,527 | 13,316,847 | 29,349,950 | 37,211,171 | 48,608,858 |
| Debt Repayment | 1,766,487 | 12,235,394 | 12,235,394 | 12,235,394 | 9,791,144 | 7,723,275 |
| Total Costs | 229,981,988 | 321,354,933 | 328,183,014 | 359,027,742 | 384,946,723 | 407,858,346 |
| Total Billing (KShs) | 215,398,769 | 337,329,303 | 347,162,682 | 378,533,025 | 405,217,054 | 430,112,601 |
| Collection Efficiency (%) | 97% | 95% | 95% | 95% | 95% | 95% |
| Projected Revenue | 208,936,806 | 320,462,838 | 329,804,548 | 359,606,374 | 384,956,201 | 408,606,971 |
| O&M Cost Coverage | 92% | 118% | 109% | 113% | 114% | 116% |
| Total Cost Coverage | 91% | 100% | 100% | 100% | 100% | 100% |
| Target | 2022/2023 | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 | 2028/2029 |
|---|---|---|---|---|---|---|---|
| Water Coverage | 91% | 91% | 92% | 93% | 94% | 95% | 96% |
| Water quality standards | 99% | 100% Compliance with Standards | |||||
| Personnel Expenditure as % of O&M | 44% | 39% | 35% | 33% | 33% | 32% | 32% |
| Non-Revenue Water | 25% | 25% | 25% | 25% | 24% | 24% | 23% |
| Hours of Supply (Hrs.) | 24 | 24 | 24 | 24 | 24 | 24 | 24 |
| Staff per 1000 connections | 8 | 8 | 7 | 7 | 6 | 6 | 5 |
| Metering ratio | 100% | 100% | 100% | 100% | 100% | 100% | 100% |
| Collection Efficiency | 85 | 97% | 95% | 95% | 95% | 95% | 95% |
| Resale at Kiosk | KSh. 2.00 per 20l jerry can | Kshs. 5.00 per 20l jerry can |
| Investment | Location | Specifications | Quantity | Unit Price (KSh) | 2024/25 | 2025/26 | 2026/27 | 2027/28 | 2028/29 |
|---|---|---|---|---|---|---|---|---|---|
| Metering | |||||||||
| Purchase of New Meter for new connections | (Within WSP Service Area) | Cold Water Meter DN 0.5" R200 | 822 | 6,032 | 4,958,304 | ||||
| 902 | 6,032 | 5,440,864 | |||||||
| 1,454 | 6,032 | 8,770,528 | |||||||
| 1,294 | 6,032 | 7,805,408 | |||||||
| Purchase of booster pumps andMotors | DTI | The centrifugal surface pump for DTI has a motor, panel, and dry run protection for the | 1 | 2,800,000 | 2,800,000 |
| Investment | Location | Specifications | Quantity | Unit Price (KSh) | 2024/25 | 2025/26 | 2026/27 | 2027/28 | 2028/29 |
|---|---|---|---|---|---|---|---|---|---|
| following characteristics: Discharge Q: 120 cmh, head 100m. | |||||||||
| Water Network expansions (Small projects) | Karate Police post | Laying a total of 7.7km HDPE pipes ranging from 32mm to 50mm at Karate police post | 1 | 3,280,896 | 3,280,896 | ||||
| Governor | Laying a total of 13.445km HDPE pipes ranging from 32mm to 63mm at Governor area in Kinungi Zone | 1 | 8,045,599 | 8,045,599 | |||||
| DTI production upgrade | Procure and install (i)1. No. Vertical centrifugal pump sets: Flow 110 m3/hr, total head 100m. (ii) 2. No. Grundfoss submersible pumps: Flow 60m3/hr, total head 105m. | 1 | 9,325,420 | 9,325,420 | |||||
| Sewer Network expansions (Small projects) | Subericol sewer project | Laying 4.98km UPVC pipes and 165 Sewer Manholes at Subericol Naivasha from Deliverance to Milimani Primary | 1 | 31,412,377 | - | 31,412,377 | |||
| Lower CCCR Sewer Project | Laying 1.55km DWC pipes and 103 Sewer Manholes at Threeways Naivasha from Gem Hotel to Sewer Pumping Station | 1 | 21,221,089 | 21,221,089 | |||||
| Non-Revenue Water (NRW) Management | WSPs Service Area | NRW Management Interventions | Lot | 18,796,728 | 7,875,983 | 11,254,002 | 8,184,674 | 9,391,074 | |
| Grand Total | 37,881,527 | 13,316,847 | 29,349,950 | 37,211,171 | 48,608,858 |
Everyone named
| Signed by | RICHARD CHERUIYOT, Ag. Chief Executive Officer Water Services Regulatory Board |
|---|---|
| Places 8 | Karate Police post · Governor area · Kinungi Zone · DTI · Subericol · Naivasha · Deliverance · Threeways |
| Licensing authorities 2 | Water Services Regulatory Board · WASREB |
| Licensees 2 | Naivasha Water and Sanitation Company · NAIVAWASCO |
| Project landmarks 2 | Milimani Primary · Gem Hotel |
| Office | Ag. Chief Executive Officer, Water Services Regulatory Board |
| Law | Water Act |
Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.
Corrections 0
- Corrected by
- No corrigendum in the issues we hold.
- Cites
- Water Act
Cite
Kenya Gazette Notice No. 3553 of 2025, Vol. CXXVII No. 58, 21 March 2025, p. 1265.Permalink funua.com/notices/2025/3553/.
About this data
- Source
- Official PDF of Vol. CXXVII No. 58, from Kenya Law
- Extracted by
- AI models
- Model audit
- An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
- Review flag
- None on this notice
Filed under: Licences, 2025 · March 2025 · Vol. CXXVII No. 58