Gazette Notice No. 3552 of 2025

The Water Services Regulatory Board approves revised water and sewerage tariffs for Nyahururu Water and Sanitation Company for 2024/2025 to 2028/2029.

Official PDF · 1.7 MB

Whole issue, from Kenya Law. This notice starts on printed page 1260.

AI-extractedAgreement between models, not verified accuracy.

Items 5

  1. Tariff approval 1

    Link
    Licensing authority
    Water Services Regulatory Board
    Licensee
    Nyahururu Water and Sanitation Company Limited
    Term
    2024/2025 to 2028/2029
    Notice period
    one-month notice from the date of this communication
    Reason
    to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff
    Non functional meter billing
    Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
    Sewerage with water connection
    Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
    Disconnected account sewerage
    Disconnected water accounts shall be charged based on the average of the last three months' sewerage charges before the disconnection
    Domestic sewerage without metered water
    Domestic customers without a metered water source (per single dwelling unit): KSh. 350 per month
    Other sewerage without water connection
    All other categories: 75% of the volume of water consumed as per the metered source of water, including boreholes, at the rates specified in (1.1) above
    Annual indexation
    The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the Water Services Regulatory Board (WASREB) regulations.
    Inflation adjustment
    The inflation adjustment shall come into effect every July of the tariff period, commencing July 2026.
    Sewer only deposit
    Customers with only sewer connection are to be charged a deposit equivalent to a water connection.
  2. Tariff approval 2

    Link
    Licensee
    NYAHUWASCO
    Approval conditions
    The conditions attached to this approval, which shall form part of the license conditions of NYAHUWASCO, are:
    Cost structure
    Below is the summary of the recommended cost structure that makes up the total costs to be incurred by NYAHUWASCO during the tariff period:
  3. Tariff approval 3

    Link
    Licensee
    NYAHUWASCO
    Licensing authority
    WASREB
    Place
    Nyahururu Scheme (Customer Meters (New Connections); Water Network Extensions), Marmanet Scheme (Customer Meters (New Connections); Water Network Extensions), Rumuruti Scheme (Customer Meters (New Connections); Water Network Extensions), Igwamiti Scheme (Customer Meters (New Connections); Water Network Extensions), Ndurururi (Sewerage extension), Muthaiga (Sewerage extension), Jua Kali (Sewerage extension), Core site (Sewerage extension), Choices area (Sewerage extension), Maina (Sewerage extension)
    Annual budgets
    i. Annual budgets: The utility shall adhere to the budgetary levels set in the tariff.
    Surpluses
    ii. Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by WASREB.
    Catchment protection
    iii. Catchment Protection: As part of its corporate social responsibility, the utility shall undertake measures to conserve and protect the catchment areas of its water source.
    Cost centres
    iv. Creation of distinct water and sewer cost centres: NYAHUWASCO shall create separate water and sewer cost centres and maintain distinct records of operations for the two centres.
    Reporting
    v. Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format and describe any challenges encountered in implementing the tariff.
    Investments
    vi. Investments: The utility shall undertake the investments in Table 1:
  4. Licence notice 4

    Link
    Body
    NYAHUWASCO (Proposed investments)
    Place
    Marmanet, Kinamba, Rumuruti, Igwamiti, Nyahururu
  5. Proposed investments 5

    Link

Schedule 168 rows

1.1 Water Tariff
Consumer CategoriesConsumption Block (M3)Approved Tariff (KSh./M3)
Domestic/Residential1-6120
7-20.135
21-50145
51-100150
101-300160
>300175
Multi-Dwelling UnitsPer M3130
Commercial/Industrial/Government/Institutions1-50135
51-100145
101-300160
>300180
1-600125
Public Schools, Colleges and Universities601-1200145
>1200m3150
Water ProjectsPer M370
Bowsing PointPer M3120
Bulk Sale75
Kiosk50
1.4 Miscellaneous Charges — Water Deposit
Item/ ServiceCharge (Ksh.)
Water Deposit
Category of consumer
Domestic2,500
Retail shops less than 10m33,000
Retail shops more than 10m33,500
Bar and restaurants less than 15 m34,000
Bar, restaurants more than 15 m36,000
Hotel class “A” and “B” less than 150 m312,000
Hotel class “A” and “B” more than 150 m315,000
Hotel class “C” and ‘D’ less than 150 m318,000
Hotel class “C” and ‘D’ more than 150 m320,000
Hospitals more than 150 m320,000
Health centres less than 150 m312,000
Schools and other institutions more than 200 m320,000
Schools less than 200 m310,000
Minor construction sites of more than 200 m315,000
Major construction sites more than 300 m350,000
Light industries less than 200 m330,000
Medium industrial between 200 m3 and 300 m350,000
Heavy industries of more than 300 m3100,000
Water kiosks5,000
Other Charges
ServiceCharge (Ksh.)
New water connection fee – Connection size: ½ inch to 1 inch2,500
New water connection fee – Connection size: 1.5 inches to 3 inches7,500
New water connection fee – Connection size above 3 inches15,000
Water Reconnection fee – at meter point500
Water Reconnection fee – at mains5,000 and double deposit
Tanker – 8000 and 16,000 litres2,500 & 5,000 respectively per tanker within the WSP area for all consumers
Sale of water per M3 at Bowsing Point (own tanker)120
Replacement of stolen or damaged meters100% of the market cost of the meter
Meter testing on request1,500
Special meter reading under customer’s request500
Sewer Connection– Residential/ Domestic5,000
Sewer Connection– Commercial, Government, Schools, Universities and Colleges7,500
Sewer Connection– Industrial15,000
Private sewer unblocking2,500
Leak detection services1,000
Sewer Reconnection fee15,000
Printing of customer’s statement under own request200
Cutting off the supply at the request of the consumer500
For turning on the supply other than in respect of a first connection200
Exhauster Services (Company Exhauster)5,000 for other customers and 4,000 for informal settlements within the WSP area for all consumers
Private Exhausters (Dumping into the company’s sewer system)15,000 per truck per month
Penalties
Illegal water connection –Commercial, Industry, Construction (Fraud)100,000 plus estimated consumption during the period of illegality
Illegal water connection (Fraud) – Domestic30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk15,000
Illegal sewer connection– Commercial, Industry, Construction100,000
Illegal sewer connection–Domestic, Government, Schools, Universities and Colleges30,000
Self-reconnection after cut-off for non-payment5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter, etc)5,000
Surcharge for direct suction of water from the supply line using a pump10,000
2.0 Cost Summary
Expenditure Item2023/242024/252025/262026/272027/282028/29
Operations275,139,652285,062,230300,175,971310,201,779321,879,660331,824,676
Maintenance16,424,11519,687,57122,094,57824,824,90727,926,66131,455,795
Regulatory Levy10,339,32615,411,45018,422,57118,903,83420,274,84021,312,673
Total O&M Costs301,903,093320,161,251340,693,120353,930,520370,081,161384,593,144
Investment Costs2,847,44830,935,63062,993,53061,634,66082,287,67096,046,168
Debt Repayment987,42319,409,34738,818,69438,818,69437,546,70434,869,002
Total Costs305,737,964690,667,479783,198,464808,314,394859,996,696900,101,458
Total Billing (KSh.)258,483,153385,286,239460,564,281472,595,843506,871,008532,816,824
Collection Efficiency (%)102%97%97%97%97%97%
Projected Revenue263,652,816373,727,652446,747,352458,417,967491,664,878516,832,319
Total Cost Coverage81%101%101%101%100%100%
i. Service Delivery Conditions attached to the Tariff Service Delivery Conditions
Target2022/20232023/20242024/20252025/20262026/20272027/20282028/2029
Water Coverage (%)90%91%92%93%94%95%96%
Water quality standards (%)100% Compliance with Standards
Personnel Expenditure as % of O&M51%46%43%41%41%40%39%
Non-Revenue Water38%38%36%34%32%30%28%
Hours of Supply (Hrs.)23232323242424
Staff per 1000 connections101099887
Metering ratio (%)100%100%100%100%100%100%100%
Collection Efficiency (%)98%102%97%97%97%97%97%
Resale at kioskKSh. 2.00 per 20l jerry canKSh. 5.00 per 20litre jerry can
Table 1: Investments — NYAHUWASCO PROPOSED INVESTMENTS
Investment AreaTargeted ProjectSample DescriptionsGuideSizeUnitUnit Cost
Customer Meters (New Connections)Nyahururu SchemeClass C15MMVolumetric meters R 200 and aboveNo.5,500.00
Marmanet SchemeClass C15MMVolumetric meters R 200 and aboveNo.5,500.00
Rumuruti SchemeClass C15MMVolumetric meters R 200 and aboveNo.5,500.00
Igwamiti SchemeClass C15MMVolumetric meters R 200 and aboveNo.5,500.00
Sub-Total
NRW Reduction ActivitiesDistrict Meter Areas (DMAs) bulk metering-----
Bursts and Leak Control-----
Commercial NRW Management-----
Water Network ExtensionsNyahururu SchemeHDPE50-110 mmPN10-PN12.5Km1,050,000
Marmanet SchemeHDPE50-160mmPN10-PN16Km1,500,000
Rumuruti SchemeHDPE50-110mmPN 10Km1,050,000
Igwamiti SchemeHDPE50-110mmPN 10-PN16KM1,200,000
Sewerage Improvement programmesSewer Network Extension/ RehabilitationDWP (HDPE) DN 200-415mm SN4-SN8Length in meters-
Ndurururi/ Muthaiga extension1,105-
Jua Kali extension1,455-
Core site extension1,063-
Choices area extension473-
Maina extension904-
Disludging of lagoons and ponds and annual maintenance3 no Anaerobic ponds 2No. Facultative ponds and one no. maturationSUM1
Table 1: Investments — NYAHUWASCO PROPOSED INVESTMENTS (financial columns, in printed row order)
QTYProject Cost (Ksh)2024/20252025/20262026/20272027/20282028/2029
1,6008,800,0001,760,0001,760,0001,760,0001,760,0001,760,000
1,2506,875,0001,375,0001,375,0001,375,0001,375,0001,375,000
1,0005,500,0001,100,0001,100,0001,100,0001,100,0001,100,000
3752,062,500412,500412,500412,500412,500412,500
23,237,5004,647,5004,647,5004,647,5004,647,5004,647,500
-18,470,0005,110,0003,990,0003,040,0003,090,0003,240,000
-23,585,290-5,040,8005,064,2508,275,8005,204,440
-59,340,0002,140,00012,900,00014,500,00014,800,00015,000,000
101,395,2907,250,00021,930,80022,604,25026,165,80023,444,440
10.259,930,0103,148,1303,144,1803,637,700
29.821,150,930-4,500,50012,150,4104,500,020
17.0520,144,536---14,211,9205,932,616
7.559,386,582-2,393,8002,400,600-4,592,182
60,612,0583,148,1306,894,30014,551,01021,856,12014,162,498
-35,000,000-----
--8,978,100---
---3,231,9007,000,0001,177,600
---1,598,2507,000,000
-1,790,000----
----4,224,150
-10,000,0005,000,000.005,000,000---
NYAHUWASCO PROPOSED INVESTMENTS
Investment AreaTargeted ProjectSample DescriptionsGuide SizeUnitUnit CostQTYProject Cost (Ksh)2024/20252025/20262026/20272027/20282028/2029
pond
Repair of damaged maintenance holes and replacement of Manhole coversNumber of Manholes repaired/covered12000x 1200No.25030,0007,500,000500,000500,0002,500,0002,500,0001,500,000
SUB-TOTAL52,500,0007,290,00014,478,1005,731,90011,098,25013,901,750
Acquisition of Movable AssetsOfficial MD's VehicleSUV,2400CC, Diesel-No.7,000,00017,000,000--7,000,000--
MotorbikesBoxer 1500cc-No.250,000102,500,000500,000500,000500,000500,000500,000
Electrofusion machine--No.2,711,15012,711,150-2,711,150---
Furniture and fixtures--No.2,820,00012,820,000-100,000150,000200,0002,370,000
Computers and Accessories--No.3,000,00013,000,000350,000350,000350,0001,600,000350,000
SUB-TOTAL18,031,150850,0003,661,1508,000,0002,300,0003,220,000
ERP Software UpgradeHuman Resource module-----2,050,000--2,050,000--
Finance and Accounting-----5,050,0005,050,000----
Technical and GIS module-----4,050,000--4,050,000--
Ndovu pay module-----2,050,000---2,050,000-
Supply Chain module-----5,050,000---5,050,000-
Billing And CRM Module-----4,050,000--4,050,000-
SUB-TOTAL-----22,300,0005,050,000-6,100,00011,150,000-
Construction of office BuildingsCustomer care center (HQ)Main officeNo7,000,00017,000,000---7,000,000
Marmanet/Kinamba Stores14,000,000----4,000,000
Rumuruti OfficeElevated tank site-No4,000,00014,000,000---4,000,000
Igwamiti officeAcquired plot-No3,500,00013,500,000---3,500,000
SUB-TOTAL18,500,000----18,500,000
Increase production capacityDrilling and equipping of one borehole--L. Sum12,000,000112,000,000----12,000,000
Construction of second intake---10,000,000-10,011,680---
Acquisition of new pumps for Nyahururu intake, Rumuruti intake and Production booster stations in Nyahururu3 no. 110 kwp pumps for intakeCaprari pump discharge 315 m3 per hour 80 meters dynamic headNo850,00032,550,000-850,000-850,000850,000
2 no.. 11 kw pumps forKSB pumpsNo320,0002960,000-320,000-320,000320,000
and RumurutiRumuruti booster station
2 No. 5.5 kw pumps for Rumuruti Intake station-NO200,0002800,000200,000200,000-200,000200,000
Motors Replacements110 Kw motors-NO1,200,00021,800,000---600,0001,200,000
55 kw motor for Losogua-NO600,00011,200,000---600,000600,000
Rehabilitation of filter media---2,500,00025,000,0002,500,000--2,500,000-
Recycling of water at water treatment plant--No3,000,00013,000,000----3,000,000
SUB-TOTAL37,310,0002,700,00011,381,680-5,070,00018,170,000
TOTAL333,885,99830,935,63062,993,53061,634,66082,287,67096,046,188
NYAHUWASCO PROPOSED INVESTMENTS — additional printed description cells
Targeted ProjectDescription
Repair of damaged maintenance holes and replacement of Manhole coversComposite maintenance hole covers 600x600 mm medium to heavy duty
Official MD's Vehicle-
Motorbikes-
Electrofusion machine-
Furniture and fixturesChairs, Tables, etc
Computers and AccessoriesDesktops, Laptops

Everyone named

Signed byRICHARD CHERUIYOT, Ag. Chief Executive Officer Water Services Regulatory Board
Places 18Nyahururu Scheme · Marmanet Scheme · Rumuruti Scheme · Igwamiti Scheme · Ndurururi · Muthaiga · Jua Kali · Core site · Choices area · Maina · Marmanet · Kinamba · Rumuruti · Igwamiti · Nyahururu · Rumuruti booster station · Rumuruti Intake station · Losogua
Licensing authorities 2Water Services Regulatory Board · WASREB
Licensees 2Nyahururu Water and Sanitation Company Limited · NYAHUWASCO
Bodies 2NYAHUWASCO · Water Services Regulatory Board
LawWater Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 3552 of 2025, Vol. CXXVII No. 58, 21 March 2025, p. 1260.

Permalink funua.com/notices/2025/3552/.

About this data

Source
Official PDF of Vol. CXXVII No. 58, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Licences, 2025 · March 2025 · Vol. CXXVII No. 58