Gazette Notice No. 7252 of 2025
The Energy and Petroleum Regulatory Authority invites comments on draft biofuels regulations and their regulatory impact statement within 30 days, as printed.
Official PDF · 1.9 MB
Whole issue, from Kenya Law. This notice starts on printed page 2486.
AI-extractedAgreement between models, not verified accuracy.
Items 23
-
Legislation notice 1
Link- Body
- Energy and Petroleum Regulatory Authority (Developed the draft regulations and associated draft Regulatory Impact Statement)
- Issuing authority
- Director -General, The Energy and Petroleum Regulatory Authority (Recipient of written comments)
- Draft regulations
- Draft Energy (Biofuels) Regulations, 2025
- Draft statement
- Draft Regulatory Impact Statement
- Comments
- 30 days, as printed
- Comment deadline
- not later than thirty (30) days from the date of publication of this notice
- Submission form
- prescribed public comments form on the Authority’s website
- Memoranda marking
- PUBLIC COMMENTS ON DRAFT BIOFUELS REGULATIONS
- Submission methods
- hand delivered to the Authority offices or sent by email to renewableenergy@epra.go.ke
- Consultation workshops
- After the expiry of the thirty (30) day period for the submission of written memoranda, the Authority shall organize stakeholder consultation workshops.
- Website
- www.epra.go.ke
- Purpose
- promote the adoption and use of biofuels by enforcing standards and ensuring fair business practice in the biofuels value chain in Kenya
-
Legislation notice 2
Link- Body
- Energy and Petroleum Regulatory Authority (Regulatory authority; recipient of construction permit applications, biofuels data and accident reports.)
- Application recipient
- The Director-General (Addressee of the construction permit application form.)
- Court
- Energy and Petroleum Tribunal (Receives appeals by persons aggrieved by a decision or order of the Authority.)
- Place
- Nairobi (Printed in the application form's postal address.)
- Licence revocation liability
- (e) A suspension or revocation of the licence shall not indemnify the licensee of any penalties for which such person may have become liable under these regulations.
- Legal compliance
- A licensee shall comply with the Act and all other applicable laws
- Biogas requirements
- The design, construction, operation, maintenance and waste management at biogas production facilities and the distribution of biogas shall comply with the Kenya Standard and be in accordance to the provisions set out in the Sixth Schedule.
- Biodiesel requirements
- The design, construction, distribution, maintenance, packaging, blending, branding and labelling of biodiesel shall comply with the Kenya Standard and be in accordance to the provisions set out in the Seventh Schedule.
- Bioethanol requirements
- The design, construction, distribution, maintenance, packaging, safety requirements, labelling of bioethanol shall comply to the Kenya Standard and be in accordance to the provisions set out in the Eighth Schedule.
- Bioethanol blending
- (a) Licensees may blend bioethanol with premium motor spirit to produce gasohol. (b) The gasohol shall meet the requirements specified in the Kenya Standard KS 515. (c) Blending shall only be carried out at facilities licensed by the Authority in accordance with these regulations.
- Biodiesel blending
- (a) Licensees may blend biodiesel with automotive gas oil (b) Pure biodiesel to be blended into automotive gasoil fuel shall meet specifications provided in Kenya Standard KS 2227. (c) The derivatives of the blended diesel shall have properties specified in the relevant Kenya Standard. (d) Blending shall only be carried out at facilities licensed by the Authority in accordance with these regulations.
- Bioethanol importation
- A licensed person who wishes to import bioethanol shall submit an application for an import permit to the Authority. The importation of bioethanol shall be subject to shortfalls in local production.
- Licence register
- The Authority shall publish and maintain on its website a register of all licensees under these Regulations.
- Data reporting
- a) A licensee shall submit data on biofuels to the Authority. The data shall include the following: - (i) Quantities of biofuels produced, imported, exported or sold (ii) List of biofuel dispensing outlets where applicable (iii) Details of biofuel product origin, destination or use b) The Authority shall prescribe the format and time durations in which the data required under this part shall be provided. c) A licensee shall maintain the records required under this part for a period of at least five years. d) A licensee who provides, authorises or permits to provide misleading or false information to the Authority commits an offense and shall, upon conviction, be liable in accordance with the provision of Section 210 of the Act.
- Accident reporting
- A licensee under these Regulations shall report to the Authority accidents and incidents pursuant to the provisions of Section 214 of the Act.
- Inspection
- The Authority or its agent may carry out inspection, in relation to the compliance with these regulations and in accordance with the provisions of Section 11 of the Act.
- Compliance orders
- (a) Where the Authority finds that any provisions of these regulations have been contravened by a licensee or that a condition has arisen which may lead to the contravention of these regulations, the Authority may issue a compliance order. (b) An order issued under sub regulation 1 shall state: - (i) the specific provision(s) which has/have been or are likely to be contravened; (ii) the measures which should be taken to rectify the contravention; (iii) the potential consequences for non-compliance; and (iv) the period within which the order shall be complied with.
- Local content
- A Licensee under these regulations shall comply with local content requirements in accordance with the provisions of Section 206 of the Act.
- Offences and penalties
- A person who, without a permit or licence issued by the Authority, undertakes the construction of a biofuel facility, production, importation, exportation, transportation, storage, packaging, blending, distribution or sale of biofuels, commits an offence and shall, upon conviction, be liable to a fine as prescribed under Section 221 of the Act.
- Dispute resolution
- Any complaints or disputes between parties under these regulations shall be referred to the Authority for resolution in accordance with the applicable regulations on complaints and disputes resolution.
- Appeals
- Any person aggrieved by a decision or order of the Authority may appeal to the Energy and Petroleum Tribunal
- Transition
- Persons engaged in biofuels businesses before the publication of these regulations shall have one year to comply
-
Legislation notice 3
Link- Body
- Kenya Revenue Authority (Valid tax compliance certificate required with applications.), NEMA (Environmental & Social Impact Assessment licence specifically authorizing development of a Biofuels production facility required.), Energy & Petroleum Regulatory Authority (Named in the construction permit form.)
- Issuing authority
- Director General, Energy & Petroleum Regulatory Authority (Signature office in the blank construction permit form.)
- Registry
- registrar of companies (Form CR12 required from the registrar of companies.)
- Application requirements
- Continuation of the construction permit application form.
- Fees schedule
- SECOND SCHEDULE (r. 6(2), 10(2), 12(2))
- Permit form schedule
- THIRD SCHEDULE (r. 7(1))
-
Legislation notice 4
Link- Body
- National Construction Authority (Licenses contractors for their class of work.), National Environment Management Authority (Approves the Environmental Impacts Mitigation Plan and issues the facility's Environmental and Social Impact Assessment licence.), Energy and Petroleum Regulatory Authority (Receives applications for biofuels business licences.), Kenya Revenue Authority (Issues the valid tax compliance certificate required with applications.), Kenya Bureau of Standards (Provides proof of conformity assessment of the product against the applicable Kenya Standard.)
- Application recipient
- Director General, Energy and Petroleum Regulatory Authority
- Place
- Nairobi (Application recipient's postal address.)
- Registry
- registrar of companies (Issues Form CR12.)
- Construction condition 1
- The site shall be required to display the construction permit number conspicuously on the site;
- Construction condition 2
- engage only contractors who are licensed by the National Construction Authority for their class of work;
- Construction condition 3
- comply with the Environmental Impacts Mitigation Plan approved by the National Environment Management Authority;
- Construction condition 4
- comply with the Government policy on local content;
- Construction condition 5
- ………………………………………………..
- Application statement
- I/We ………………………………….…………................................... hereby apply for approval in accordance with the Energy (Biofuels) Regulations 2025 for a Biofuels licence of the following category;
- Category d
- q Category D Licence which shall entitle the holder to engage in the production, importation, exportation, transportation, storage, packaging, blending, distribution or sale of biodiesel.
- Category e
- q Category E Licence which shall entitle the holder to engage in the production, importation, exportation, transportation, storage, packaging, blending, distribution or sale of bioethanol.
- Category g
- q Category G Licence, which shall entitle the holder to engage in the production, transportation, storage, packaging, distribution or sale of biogas.
- Business lines prompt
- I/We intend to carry out the following line(s) of business
- Business line 1
- q Production
- Business line 2
- q Importation
- Business line 3
- q Exportation
- Business line 4
- q Transportation
- Business line 5
- q Storage
- Business line 6
- q Packaging
- Business line 7
- q Blending
- Business line 8
- q Distribution and Sale
- Business lines instruction
- (Please tick (ü) as appropriate)
- Applicant commitment
- I/ We commit to carry out the business in accordance with the Energy (Biofuels) Regulation 2025 applicable standards, guidelines and any rules and by-laws for the time being in force thereunder.
- Application purpose
- Purpose of application New Application q Renewal q Modification q (Please tick (ü) as appropriate)
- Form item 1
- Name of Applicant …………………………………………
- Form item 2
- Details of applicant:
- Applicant detail a
- Income Tax Personal Identification Number: ………
- Applicant detail b
- Postal Address: ……………………………………..
- Applicant detail c
- Email Address: ...........................................................
- Applicant detail d
- Telephone number(s): ..................................................
- Applicant detail e
- LR/ Plot No…………………Building Name………
- Applicant detail f
- Street/: ………………………………………………
- Applicant detail g
- Town/County: ………………………………...........
- Form item 3
- Location of business premise(s)
- Business location a
- ………………………………………………………
- Business location b
- ………………………………………………………
- Business location c
- ....................................................................................
- Business location instruction
- (Insert additional lines as appropriate)
- Form item 4
- Give full details of proprietors or partners owning business or directors/shareholders of the company, as applicable.
- Ownership details instruction
- (Insert additional lines as appropriate)
- Form item 5
- State if you are or any of your partners/directors is an un-discharged bankrupt. (If so, indicate the names).
- Bankruptcy names a
- ……………………………………………………..…
- Bankruptcy names b
- ……………………………………………..…………
- Bankruptcy names c
- ......................................................................................
- Bankruptcy names instruction
- (Insert additional lines as appropriate)
- Form item 6
- All applications shall be accompanied by copies of the following documents:
- Supporting document a
- Copy of Business Name Registration Certificate or Certificate of Incorporation and Memorandum and Articles of Association in case of a company (whichever is applicable);
- Supporting document b
- Form CR12 from the registrar of companies not older than 12 calendar months from the date of issue;
- Supporting document c
- PIN certificate;
- Supporting document d
- Valid tax compliance certificate from the Kenya Revenue Authority;
- Supporting document e
- Copy of national identification document or passport for all directors;
- Supporting document f
- Certified copy of a valid Work Permit for foreign directors working in Kenya or notarized declaration of non-residence for foreign directors not residing in Kenya;
- Supporting document g
- Proof of occupancy of company’s office;
- Form item 7
- The following documents shall be provided for the specific line(s) of business:
- Specific business a
- Production
- Production document i
- Feasibility study report
- Production document ii
- Physical Planning Approval issued by the respective county government
- Production document iii
- Proof of land ownership/lease agreement for the proposed production site
- Production document iv
- A valid Environmental and Social Impact Assessment licence issued by the National Environment Management Authority for the facility
- Production document v
- Layout Drawings of the facility
- Production document vi
- A letter from the Kenya Bureau of Standards as proof of conformity assessment of the product against the applicable Kenya Standard
- Specific business b
- Importation and Exportation
- Import export document i
- A letter from the Kenya Bureau of Standards as proof of conformity assessment of the product against the applicable Kenya Standard
- Import export document ii
- Proof of availability of storage infrastructure for imported products
-
Legislation notice 5
Link- Body
- Oil Spill Mutual Aid Group (Membership required for category D licenses.), Department of Weights and Measures (Issues calibration certificates.), County Fire Department (Issues fire clearance certificates.), Kenya Bureau of Standards (Provides letters of conformity assessment.), Department of Occupational Safety and Health Services (Issues work place registration certificates and approves pressure test reports.), National Industrial Training Authority (Approves institutions providing training in safe handling of flammable fuels.), National Environment Management Authority (Issues Environmental Impact Assessment licences.)
- Licensing authority
- Energy and Petroleum Regulatory Authority
- Issuing authority
- Director General, Energy and Petroleum Regulatory Authority (Signature position in the licence form.)
-
Legislation notice 6
Link- Body
- Department of Weights and Measures (Approves the separate metering system required for each consumer outlet.)
-
Legislation notice 7
Link- Subject
- Bioethanol fuel and appliance labeling
- Fuel labeling standard
- KS 2838
-
Legislation notice 8
Link- Issuing authority
- Cabinet Secretary
- Regulation 5 2 continuation
- in an area declared as an energy resource area as defined in Section 181 of the Act or any other part of the country.
- Regulation 6 1
- An application for exploration permit shall be made electronically or in any other manner that the Cabinet Secretary may, from time to time, prescribe and shall be in the form set out in First Schedule and accompanied by proof of payment of the application fees set out in the Second Schedule.
- Regulation 6 2
- Before making an application in sub regulation 1, the person intending to make an application shall give fifteen days’ notice, by public advertisement, in at least two newspapers of nationwide circulation, in the form set out in the Third Schedule
- Regulation 7 1
- Any objections to the grant of a permit as a result of the public notice issued under Regulation 6(2) shall be submitted not later than thirty days after the date of the public notice.
- Regulation 7 2
- Where the Cabinet Secretary receives an objection to the grant of a permit, he shall request the applicant to address, in writing, the issues raised in the objection within fifteen days.
- Regulation 7 3
- The Cabinet Secretary may hear any objections in public, at a time and place of which not less than fifteen days’ notice shall be given to the applicant and to every objector and the Cabinet Secretary shall make known their decision regarding any objection within thirty days after the hearing.
- Regulation 8 a
- The Cabinet Secretary shall, within fifteen days of receipt of an application for an exploration permit, inform the applicant if the application is complete.
- Regulation 8 b
- The Cabinet Secretary shall, in granting or rejecting an application for an exploration permit, consider—
- Regulation 8 b i
- availability of the proposed exploration site;
- Regulation 8 b ii
- output of consultation with the relevant county government, local communities or any other relevant government agency;
- Regulation 8 b iii
- the impact of the undertaking on the social, cultural or recreational life of the community;
- Regulation 8 b iv
- land use or the location of the undertaking;
- Regulation 8 b v
- economic and financial benefits to the country or area of supply of the undertaking;
- Regulation 8 b vi
- the economic and energy policies in place at the time;
- Regulation 8 b vii
- that the contractual rights, privileges, liabilities and obligations accrued to an existing licensee or any other person are not materially adversely affected;
- Regulation 8 b viii
- the cost of the undertaking and financing arrangements;
- Regulation 8 b ix
- the ability of the applicant to operate in a manner designed to protect the health and safety of its employees and users of the service for which the permit is required and other members of the public who would be affected by the undertaking;
- Regulation 8 b x
- the technical and financial capacity of the applicant to undertake the exploration for which the authority is required;
- Regulation 8 b xi
- any representations or objections in regulation 7(1); and
- Regulation 8 b xii
- any other matter that the Cabinet Secretary may consider likely to have a bearing on the undertaking.
- Regulation 8 bullet 1
- Where an application for an exploration permit is declined, the Cabinet Secretary shall inform the applicant in writing the reasons for the decline.
- Regulation 8 bullet 2
- Where the Cabinet Secretary approves the application, the approval shall grant the applicant site exclusivity for the period of the permit.
- Regulation 8 bullet 3
- A holder of an exploration permit shall within sixty (60) days of expiry of the permit or at the end of the exploration submit an exploration report to the Cabinet Secretary. The report shall include an appraisal of the resource in the resource area.
- Regulation 8 bullet 4
- A holder of the permit shall have the first right of exploitation of a feasible resource.
- Regulation 8 bullet 5
- A holder of a permit under these regulations, who intends to utilize the resource shall obtain the applicable approvals.
- Regulation 8 bullet 6
- Where the resource in sub regulation (7) is geothermal, the holder of the permit shall obtain a geothermal resource license.
- Part heading
- PART IV – Geothermal Resource Licence
- Regulation 9 a
- A person shall not undertake the extraction of geothermal energy resource unless he is licensed by the Cabinet Secretary.
- Regulation 9 b
- An application for a licence for extraction of geothermal energy resource shall be made electronically or in any other manner that the cabinet secretary may from time to time prescribe and shall be in the form set out in Fourth Schedule.
- Regulation 9 c
- The Cabinet Secretary may call for such additional information as he may require under these Regulations to enable him to assess the suitability of the grant of a geothermal resources licence.
- Regulation 9 d
- A person applying for the licence shall as part of the application include a proposal on benefit sharing during the exploitation of the resource.
- Regulation 9 e
- The Cabinet Secretary shall, in granting or rejecting an application for a licence do so in an open, competitive and transparent manner subject to Section 80 of the Act and consider --
- Regulation 9 e a
- output of consultation with the relevant county government local communities or any other relevant government agency;
- Regulation 9 e i
- the impact of the undertaking on the social, cultural or recreational life of the community;
- Regulation 9 e ii
- land use or the location of the undertaking;
- Regulation 9 e iii
- economic and financial benefits to the country or area of supply of the undertaking;
- Regulation 9 e iv
- the economic and energy policies in place from time to time;
- Regulation 9 e v
- that the contractual rights, privileges, liabilities and obligations accrued to an existing licensee or any other person are not materially adversely affected;
- Regulation 9 e vi
- prescribe adequate buffers between different licensed areas to safeguard subsurface resource interference. Such a buffer shall be at least one kilometer;
- Regulation 9 e vii
- the cost of the undertaking and financing arrangements;
- Regulation 9 e viii
- the ability of the applicant to operate in a manner designed to protect the health and safety of its employees and users of the service for which the license is required and other members of the public who would be affected by the undertaking;
- Regulation 9 e ix
- the technical and financial capacity of the applicant to render the service for which the authority is required; and
-
Legislation notice 9
Link- Issuing authority
- Cabinet Secretary, Ministry of Energy
- Body
- Ministry of Energy, Authority
- Court
- Tribunal
- Regulation 21 e
- A licensee shall, at his own cost, cause the annual accounts to be examined and audited by independent auditors and submit the audited accounts to the Cabinet Secretary by the end of the first quarter of every calendar year
- Regulation 22
- A holder of a permit or license shall notify the Cabinet Secretary and the Authority of any accident or incident within forty eight hours of the incident or accident in accordance with section 214 of the Act.
- Regulation 23
- The offences and penalties specified in sections 90, 118, 168, 169, 210, 219, 220 and 221 of the Act shall apply to these Regulations.
- Regulation 24
- Any person aggrieved by a decision or Order under these Regulations may appeal to the Tribunal in accordance with section 80 (7) of the Act.
- Regulation 25
- Upon coming to effect of these regulations—
- Regulation 25 a
- the existing exploration permits and licences shall be valid for the remainder of their term;
- Regulation 25 b
- geothermal royalty amounts payable by the licensee shall be as prescribed in the licence;
- Regulation 25 c
- the holders of permits and licenses shall be required to comply with the other requirements of these Regulations.
- Application declaration
- I/We………………………………………………………………………………………… Hereby apply for the renewable energy resource exploration permit and commit to comply with all laws and regulations applicable in Kenya including those regarding use of such resources.
- Application type
- Type of application (New, Amendment Renewal)………………………………………………..
- Registration instructions
- 1. REGISTRATION DETAILS OF THE APPLICANT (Check the relevant option)
- Registration option 1
- Sole Proprietorship or Partnership
- Registration option 2
- Public Limited Company
- Registration option 3
- Private Limited Company
- Registration option 4
- Cooperative Society
- Registration option 5
- Other (Specify)…………………………………
- Contact instructions
- B. Details of the Contact Person (Details of person to whom correspondence or enquiries concerning the application should be directed)
- Ownership instructions
- 2. OWNERSHIP DETAILS (Give full details of proprietors or partners owning business or directors/shareholders of the company, as applicable)
- Ownership additional lines
- (Insert additional lines as appropriate)
- Bankruptcy question
- State if you are or any of your partners/directors is an un-discharged bankrupt. (If so, indicate the names)
- Bankruptcy item a
- a) ……………………………………………………………
- Bankruptcy item b
- b) …………………………………………………………....
- Bankruptcy item c
- c)..................................................................................................
-
Legislation notice 10
Link- Registry
- registrar of companies (Form CR 12), Business Registration Service (CR 13)
- Body
- Host County Government (Project approval requested in application item 3.10.)
- Applicant declaration
- I/we hereby declare that the information provided in this application is true to the best of my/our knowledge.
- Declaration fields
- Dated this ………………………day of ……………….20………; Name …………………………………………………………..; Title……………………………………………………………….; Signature……………………………………………………………….
- Third schedule placeholder
- (Insert name of the Applicant)
-
Legislation notice 11
Link- Body
- Ministry of Energy and Petroleum (Ministry named in the exploration permit application notice template.), Ministry of Energy (Ministry named in the geothermal energy extraction licence application form.)
- Licensing authority
- Cabinet Secretary, Ministry of Energy and Petroleum (Recipient of the proposed exploration permit application and representations or objections in the template.), Cabinet Secretary, Ministry of Energy (Addressee of the geothermal energy extraction licence application form.)
- Place
- Nairobi (Printed postal address of the application form's addressee.)
- Objections
- 30 days, as printed
- Objection period start
- the date of application as stated in the notice
- Objection procedure
- Any public or local authority, company, person or body of persons desirous of making any representation on or objection to the application must do so by a letter addressed to the Cabinet Secretary and marked on the outside of the cover enclosing it "Renewable Energy Resource Permit Objection"; a copy of such representation or objection shall be forwarded to the applicant.
- Inspection
- A copy of the application (subject to confidentiality considerations) will be available (once lodged) for inspection by the public at the registered office of the applicant.
- Exploration notice template
- NOTICE is hereby given that (Name of Applicant), having its registered office at (registered office and postal address) in the Republic of Kenya, (“the Applicant”), pursuant to the provisions of Section 171 of the Energy Act, 2019, will on (proposed date of application), make an application to the Cabinet Secretary, Ministry of Energy and Petroleum for a permit for Exploration of Renewable Energy Resources for (state the renewable energy resource).
- Exploration description instruction
- (Describe the purpose, location, renewable energy resource and method of exploration).
- Permit effect statement
- The grant of the permit will not have adverse effect on any Public or Local Authorities, Companies, persons or bodies of persons within the areas of the undertaking.
- Notice execution fields
- Dated ________________________________________ Name………………………………………………………………….. Title of applicant’s representative
- Application declaration
- I/We…………………………………………………………… Hereby apply for the geothermal energy resource extraction licence and commit to comply with all laws and regulations applicable in Kenya including those regarding use of such resources.
- Ownership instruction
- (Give full details of proprietors or partners owning business or directors/shareholders of the company, as applicable)
- Ownership additional lines
- (Insert additional lines as appropriate)
- Bankruptcy instruction
- State if you are or any of your partners/directors is an un-discharged bankrupt. (If so, indicate the names)
-
Legislation notice 12
Link- Registry
- registrar of companies (Source of form CR 12 required with the application.), Business Registration Service (Source of CR 13 required with the application.)
- Body
- Ministry of Energy and Petroleum
- Licensing authority
- Cabinet Secretary in charge of Energy and Petroleum (Represents the Government in the printed geothermal resource licence form.)
- Place
- Nairobi (Location in the Cabinet Secretary's printed postal address.)
- Ownership declaration continuation
- c).................................................................................................. (Insert additional lines as appropriate)
- Proposed extraction area 6 1
- 6.1. Site of exploration area (Village, Sub-County, County and Landmark)
- Proposed extraction area 6 2
- 6.2. Delineation of the area or areas proposed to be covered by the exploration
- Proposed extraction area 6 3
- 6.3. Global Positioning System Co-ordinates of the exploration area (decimal format)
- Proposed extraction area 6 4
- 6.4. Nearest landmark
- Proposed extraction area 6 5
- 6.5. Socio-demographic and economic characteristics of the site(Population, number of households, businesses, institutions, households main source of energy, main economic activities)
- Proposed extraction area 6 6
- 6.6. Generation Capacity
- Proposed extraction area 6 7
- 6.7. Availability of land for the project (Land Ownership; private, public and site accessibility)
- Financing question
- Source of financing for Exploration(Debt, equity, grant, other) (Attach Audited accounts)
- Partnership approval question
- Is approval issued under the Public Private Partnership Act, 2013(Yes/No) If Yes, Attach evidence
- Proposed extraction area 6 8
- 6.8. Is the project approved by Host County Government(Yes/No) If Yes, Attach evidence
- Proposed extraction area 6 9
- 6.9. Expected date of commencement of exploration…………
- Proposed extraction area 6 10
- 6.10. Estimated………………Total exploration costs………….…………KSh.
- Required document 1
- 1. Certified copy of the certificate of incorporation or business registration certificate.
- Required document 2
- 2. Certified copy of form CR 12 from registrar of companies or CR 13 from the Business Registration Service that is not older than 12 calendar months from the date of issue.
- Required document 3
- 3. Certified copies of identification documents (National Identification Card or Passports) for all the company's directors.
- Required document 4
- 4. Certified copy of a valid Work Permit Class "G" for foreign directors working in Kenya or notarized declaration of non-residence for foreign directors not residing in Kenya.
- Required document 5
- 5. Copy of PIN Certificate.
- Required document 6
- 6. Copy of a valid tax compliance certificate.
- Required document 7
- 7. A full statement giving the applicant’s financial status including at least the past three years audited financial statements, bank statement(s), credit report and proposed financing arrangements.
- Required document 8
- 8. Proof of previous experience in exploration
- Required document 9
- 9. A statement of the applicant’s technical competence including, Curriculum Vitae of key personnel, company profiles and experience for the past five (5) years
- Required document 10
- 10. Details of expected infrastructure requirements.
- Applicant declaration
- I/we hereby declare that the information provided in this application is true to the best of my/our knowledge.
- Declaration fields
- Dated this ………………day of …………………….20……… Name ………………………………………………………….. Title…………………………………………………………. Signature…………………………………………………………….
- Licence form number
- Geothermal Resource Licence No. …./20YY
- Licence form preamble
- This Geothermal Resources Licence is granted this …………. day of …………..…..20YY by the Government of the Republic of Kenya (hereafter referred to as the “Government” ) represented for the purpose of this Licence by the Cabinet Secretary in charge of Energy and Petroleum (hereafter referred to as the “Cabinet Secretary”) of P.O. Box 30582- 00100, Nairobi to ………………………. , a limited liability company incorporated under the laws of Kenya and having a registered place of Business at …………………………….. (hereafter referred to as the “Licensee” which expression includes its successors) pursuant to the Energy Act, 2019 (the “Act”) and the Energy (Renewable Energy Resource) Regulations, 2024 (the “Regulations”).
- Licence rights 1
- 1. The Licensee is hereby granted the following exclusive rights:
- Licence rights 1 a
- (a) The right and privilege to enter and explore, drill for, extract, produce, utilize and dispose of geothermal steam and associated geothermal resources in or under the land described in Appendix I and shown on the map set forth in Appendix II hereof (the “Licence Area”).
-
Legislation notice 13
Link- Issuing authority
- Cabinet Secretary (The licence form specifies the Cabinet Secretary's powers and responsibilities.)
- Body
- Board of Consultants (Consultants hired through competitive sourcing to define the maximum economically available generating capacity.), Survey of Kenya (Preparation of Cadastral Maps and supporting documents.), Geothermal Development Company (Management of the geothermal reservoir(s).), Ministry of Energy and Petroleum, World Bank (Source of guidelines in the absence of relevant laws.)
- Office
- Secretary, Geo-Exploration of the Ministry of Energy and Petroleum (Authorized representative specified in the licence form for receiving reports and appraisal results.)
- Document type
- Geothermal resource licence form
- Term
- thirty (30) years from the date hereof
- Renewal term
- one further period of five (5) years
- Exploration period
- a period not exceeding three years
- Amount
- yearly in advance a rental of about US$5.00 per hectare
- Late payment penalty
- ten percent (10%)
-
Licence notice 14
Link- Licensing authority
- Cabinet Secretary
- Body
- Government of Kenya
- Clause 14
- The Licensee shall keep open at all reasonable time for the inspection of any duly authorized representative of the Cabinet Secretary, the License Area and all wells, improvements, machinery and fixtures thereon and all production reports, maps, records books, and accounts relative to the operations under the License Area.
- Clause 15
- The Licensee shall:
- Clause 15 a
- Be liable for any actions, obligations, breaches or negligence arising from or connected with the Licensee’s activities and operations conducted pursuant to this Licence.
- Clause 15 b
- Indemnify and hold harmless the Government from all claims arising from or connected with the Licensee’s activities and operations under this Licence except where such claims are caused by or arise from the direct acts or omissions of authorized representatives of the Cabinet Secretary.
- Clause 16
- The Cabinet Secretary may accept the surrender of this Licence or any part of the Licence Area upon such terms and conditions as he may deem fit but so, however, that no such surrender shall affect any liability incurred by the Licensee before the surrender shall have taken effect.
- Clause 17 a
- Cabinet Secretary may, by notice to the Licensee, declare this License to be forfeited if the Licensee:
- Clause 17 a i
- Wholly ceases work in or under the Licence Area during a continuous period of six (6) calendar months, without the written consent of the Cabinet Secretary;
- Clause 17 a ii
- Commits a breach or is in default of any provision of the Act or the Regulations or any term or condition of the Licence and the Cabinet Secretary has caused a notice to be served on the Licensee requiring the Licensee:
- Clause 17 a ii a
- In the case of a breach which, in the opinion of the Cabinet Secretary, is capable of being repaired or made good, to repair or make good the breach within a period of six (6) months; and
- Clause 17 a ii b
- In the case of a breach which, in the opinion of the Cabinet Secretary, is not capable of being repaired or made good, to show cause why this Licence should not be forfeited.
- Clause 17 a iii
- Forfeiture of this License under paragraph (a) shall not affect any liability already incurred by the Licensee.
- Clause 18 a
- Within ninety (90) days (or such longer period as the Cabinet Secretary may authorize because of adverse climatic conditions or other special circumstances) of the expiry, surrender or forfeiture of this Licence, the Licensee shall apply to the Cabinet Secretary to enter the Licence Area to remove the plant, machinery, engine or tools installed or erected thereon. The Cabinet Secretary’s consent to such removal shall not be unreasonably withheld, delayed or conditioned.
- Clause 18 b
- The Cabinet Secretary may require the Licensee to remove the plant, machinery, engines or tools within a reasonable time (being not less than one hundred and eighty (180) days after the expiry, surrender or forfeiture of this licence) and if the same are not so removed they may be sold by auction at the risk of the Licensee.
- Clause 18 c
- The net proceeds of the sale conducted pursuant to paragraph (b) above shall be held by the Cabinet Secretary until applied for by the Licensee but may be used in the repair of breaches or faults not made good by the Licensee and for payment of the costs incurred in conducting the sale. Any costs incurred in such repair of breaches or faults or in conducting any sale shall be in accordance with the usual or customary rates for the type of expenditure involved and in all cases shall be reasonable and fair.
- Clause 19 a
- The Cabinet Secretary may, at the request of the Licensee, make available to the Licensee such land as the Licensee may reasonably require for the conduct of operations under this licence in accordance with the Constitution of the Republic of Kenya, 2010, the Community Land Act, 2016 and any other applicable law and:
- Clause 19 a i
- where such land is community land, the Cabinet Secretary shall procure that Government of Kenya shall set apart such community land in the License Area in consultation and concurrence with the local community and in accordance with applicable law and Chapter Five of the Constitution of the Republic of Kenya, 2010 on Land and Environment;
- Clause 19 a ii bullet 1
- where such land is private land, the Cabinet Secretary Shall procure that the Government of Kenya acquires the land in accordance with the applicable laws;
- Clause 19 a ii bullet 2
- Prior to the Licensee requesting the Cabinet Secretary to make available to the Licensee private land for conduct of operations under this License, the Licensee shall first enter into negotiations with the owner or occupier of such private land for granting of the required permission or authorization or for the acquisition of the required permission or authorization or for the acquisition of the required interest (including way-leaves) over such land;
- Clause 19 a ii bullet 3
- In the event that the owner or occupier of any such private land fails to grant to the Licensee the required permission, authorization or interest in the land within one hundred and twenty (120) days of commencement of negotiations between the Licensee and such owner or occupier, the Cabinet Secretary shall procure the Government of Kenya to obtain in accordance with the applicable laws, the required permission, authorization or other interest in the land;
- Clause 19 a ii bullet 4
- In carrying out negotiations with the owner or occupier of private land, the Licensee shall act diligently. For the purpose of this clause “diligently” shall include pursuing all reasonably available procedures for obtaining the required permission, authorization or interest in land, including the offer of a rent or purchase price or other consideration which a person carrying out the Licensee’s activities would reasonably expect to pay for the grant of such permission or authorization or other interest in the land.
- Clause 19 a iii
- Where such land is within a “National Park” or National Reserve” within the meaning of the Wildlife Conservation and Management Act, 2013 or within a “Forest Reserve” within the meaning of the Forest Conservation and Management Act 2016 the Cabinet Secretary shall procure the Government of Kenya to obtain all necessary consents and authorizations from a competent authority. The Licensee shall on its part provide the Cabinet Secretary with sufficient description of the area required for its operations and supply such other information as may be required for its operations and supply such other information as may be required by the Cabinet Secretary or the competent authority for the issue of such consent or authorization
- Clause 19 a iv
- The Licensee shall pay or reimburse the Cabinet Secretary any reasonable compensation that may be required for obtaining permission, authorization or interest or for the setting apart, use or acquisition of any land as the
-
Licence notice 15
Link- Issuing authority
- Cabinet Secretary, Ministry of Energy and Petroleum
- Body
- Ministry of Energy and Petroleum, Government of Kenya
- Clause 19 iv continued
- Licensee may reasonably require for the conduct of operations under this Licence.
- Community land notification
- Where the Licensee has occupied community land for the purpose of such operations before that land has been set apart, the Licensee shall notify the Cabinet Secretary in writing the need to set apart such land.
- Way leaves and permissions
- § The Cabinet Secretary shall procure that the Government of Kenya shall grant or cause to be granted to the Licensee and its contractors and sub-contractors such way-leaves, easements, temporary occupation or other permissions within and (if necessary) without the Licence Area as are necessary to conduct such operations and in particular for the purpose of laying, operating and maintain pipelines, power lines, cables, communication facilities, roads and rights of way.
- Ingress and egress
- § The Cabinet Secretary shall procure that the Government of Kenya shall at all times give the Licensee and its contractors and sub-contractors the right of ingress to and egress from the Licence Area to and from, in particular, the facilities wherever located for the conduct of operations under this Licence.
- Clause 20
- The Cabinet Secretary shall, subject to applicable laws and regulations, obtain for the Licensee any permit necessary to enable the Licensee to use the water in the Licence Area for the purpose of operations under this Licence but the Licensee shall not unreasonably deprive the users of land, domestic settlement or cattle watering place of the water supply to which they are accustomed.
- Clause 21
- The Licensee shall pay compensation as required by Section 173 of the Energy Act, 2019.
- Clause 22
- Where the Licensee intends to occupy or disturb the surface of any particular area of private land or to disturb or otherwise interfere with any crops, trees, buildings or works thereon, the Licensee shall give not less than twenty one (21) days notice in writing of his intention to the person in visible and immediate occupation of the land affected thereby and, if practicable to the owner of the land, and shall comply with Section 171 of the Act.
- Clause 23 a
- The Licensee shall notify the Cabinet Secretary, before operations begin, of the name and address of the person resident in Kenya who will supervise the operations under this Licence and prior notice of any subsequent change shall be given to the Cabinet Secretary.
- Clause 23 b i
- Every notice demand or other communication under this Licence shall be in writing and may be delivered personally or by letter or facsimile transmission dispatched by the parties to each other in accordance with the details set out below or to such other address and / or facsimile number as the parties may notify each other in accordance with this clause for the purpose. The Licensee: ………………………………………….. ………………………………………….. …………………………………………. The Cabinet Secretary, Ministry of Energy and Petroleum, Kawi House, South C, P.O. Box 30582-00100, NAIROBI.
- Clause 23 b ii
- Every notice, demand or other communication shall be deemed to have been received (if sent by post) twenty-four (24) hours after being posted first class postage prepaid (if posted from and to an address within Kenya) or five (5) working days after being posted prepaid airmail (if posted from or to an address outside Kenya) at the time of actual delivery or (in the case of a facsimile transmission) receipt if during normal business hours on a working day in the place of intended receipt or to the facsimile transmission number specified above, and otherwise at the opening of business in that number on the next succeeding such day.
- Clause 24 a
- Where the Cabinet Secretary or the Licensee is prevented from complying with this License by force majeure, the party affected shall promptly give written notice to the other and the obligations of the affected party shall be suspended, provided that party shall do all things reasonable within its power to remove such cause of force majeure. Upon cessation of the force majeure event, the party no longer affected shall promptly notify the other party.
- Clause 24 b
- In this clause, “force majeure” means an occurrence beyond the reasonable control of the Cabinet Secretary or of the Licensee which prevents either of them from performing their obligations under Licence.
- Clause 24 c
- For the purpose of this clause promptly shall be deemed to mean a period of twenty-one (21) days.
- Clause 24 d
- Where the party not affected disputes the existence of force majeure, that dispute shall be referred to arbitration in accordance with the provisions for arbitration contained in this Licence.
- Clause 24 e
- Where an obligation is suspended by force majeure for more than one (1) year, the parties may agree to terminate this Licence by notice in writing without further obligations; provided that each party shall remain liable for the fulfillment of any obligation which remains unperformed at that time.
- Clause 24 f
- Subject to paragraph (e) of this clause, the term of the Licence shall be automatically extended for the period of the force majeure.
- Clause 25 a
- Whenever any dispute arises between the Licensee and an owner of private land or community land, then the owner of the private land or community land shall participate in the dispute resolution as stakeholder.
- Clause 25 b
- Except as otherwise provided in this Licence, any question or dispute arising out of or in relation to or in connection with this Licence shall, as far as possible, be settled amicably. Where no settlement is reached within thirty (30) days from the date of the dispute, such dispute shall be referred to arbitration in accordance with the provisions hereinafter contained.
- Clause 25 c
- All disputes arising out of this License or relating to any investment made under it for settlement by arbitration shall be settled in Kenya in accordance with Arbitration Act, 1995(Revised, 2012) of the Laws of Kenya.
- Clause 25 d
- Any such arbitration proceeding shall be conducted in accordance with the Rules of Procedure for Arbitration proceedings in effect in Kenya on the date on which the proceeding is instituted.
- Issuance block
- Issued by: ……………………………. CABINET SECRETARY MINISTRY OF ENERGY & PETROLEUM
- Appendix 1
- APPENDICES 1. APPENDIX I - DELINEATION OF LICENSE AREA The Licence Area shall be that area of land shown on the map annexed hereto as Appendix II for indicative purposes only. The Licence area, covering about …….. Km2 in ………….. Sub County of …………
-
Licence notice 16
Link- Licensing authority
- Cabinet Secretary
- Licence area continuation
- County is bounded by geographical coordinates …., ……, ….., ……. ……in WGS84 datumas shown in Appendix II overleaf.
- Appendix ii
- 2. APPENDIX II – MAP
- Appendix iii 1
- (1) The Licensee shall supply to the Cabinet Secretary daily reports on geothermal drilling and production operations, and weekly reports on geothermal exploration operations.
- Appendix iii 2
- (2) The Licensee shall report in writing to the Cabinet Secretary the progress of the geothermal operations according to the following schedule-
- Appendix iii 3
- (3) A report under sub-clause (2) shall contain, in respect of the period which it covers-
- Appendix iii 3 a
- (a) Details of the geothermal operations carried out and the factual information obtained;
- Appendix iii 3 b
- (b) A description of the area in which the Licensee has operated;
- Appendix iii 3 c
- (c) An account of the expenditure on the geothermal operations;
- Appendix iii 3 d
- (d) A map indicating all boreholes, wells and other geothermal operations;
- Appendix iii 3 e
- (e) On expiry or termination of this Licence details of the geothermal operations including all the matters described in paragraphs (a) to (d); and
- Appendix iii 3 f
- (f) All information required in the Regulations and the drilling conditions specified in the Appendix V thereto not hitherto supplied.
- Appendix iv a
- (a) The Licensee shall supply to the Cabinet Secretary a development and production programme which shall include:-
- Appendix iv a i
- (i) The date by which the applicant intends to commence production;
- Appendix iv a ii
- (ii) The capacity of production and scale of operations;
- Appendix iv a iii
- (iii) The estimated overall production;
- Appendix iv a iv
- (iv) The marketing arrangements made for utilization of the geothermal energy, including details of all contracts or arrangements made with proposed users;
- Appendix iv a v
- (v) Proposals for the prevention of pollution, the treatment of wastes, the safeguarding of natural resources, the progressive reclamation and rehabilitation of lands disturbed by prospecting or production operations and for the minimization of the effect of such operations on adjoining or neighbouring lands;
- Appendix iv a vi
- (vi) An approved Environmental and Social Impact Assessment detailing any significant adverse effect which the carrying out of production operations with proposals for controlling or eliminating that effect;
- Appendix iv a vii
- (vii) A technical report on the production possibilities and the intention of the applicant in relation thereto; and
- Appendix iv a viii
- (viii) A detailed forecast of capital investment, operating costs and sales reserves and the anticipated type and source of financing.
- Appendix iv b
- (b) The development and production phase shall commence upon the approval by the Cabinet Secretary of the development and production programme.
- Appendix v introduction
- The following conditions are intended as guidelines to ensure safety and environmental integrity. If these conditions would prove too restrictive for economical geothermal energy recovery, the licensee may propose an alternative.
- Appendix v 1
- 1. All casing strings reaching the surface shall be cemented at a sufficient depth to provide adequate anchorage and support for the casing and any blowout prevention equipment required thereon. The several casing strings in order of installation are—
- Appendix v 1 a
- (a) surface;
- Appendix v 1 b
- (b) intermediate;
- Appendix v 1 c
- (c) anchor;
- Appendix v 1 d
- (d) production strings.
- Appendix v 2
- 2. The following casing setting depth requirements are general in nature and subject to variation to permit the casing (if any) to be set and cemented in competent formation. Casing setting depths shall be based upon all geological and engineering factors including apparent geothermal gradients, depths and pressures of the various formations to be penetrated and all other pertinent information about the area. All depths in these Regulations referred to True Vertical Depth (T.V.D.) below ground level unless otherwise specified—
- Appendix v 2 a
- (a) Surface Casing.—This casing shall be set at a minimum depth of 30 metres and a maximum depth of 60 metres from the cellar top, before drilling into shallow formation suspected or known to contain geothermal resources, non-condensable gases, or other mineral resources or upon encountering such formations;
- Appendix v 2 b
- (b) Intermediate Casing.—This casing shall be set at any time when required by bore conditions encountered in drilling below the surface casing such as anomalous pressure zones, uncased fresh water aquifers, caveins, washouts, lost circulation zones, rapidly increasing thermal gradients or other drilling hazards;
- Appendix v 2 c
- (c) Anchor Casing.—This casing shall be set at a depth equivalent to or in excess of 10 percent of the proposed total depth of the bore provided, however, that such setting depth shall be not less than 250 metres and no more than 400 metres;
- Appendix v 2 d
- (d) Production Casing.—This casing may be set at the top of or through the potential producing zone and shall be set before completing the bore for production. Production casing shall be run to the surface.A liner shall be used below the production casing and theliner overlap shall be a minimum of 30 metres. The lap shall be tested by a fluid entry or pressure test to determine whether a seal between the liner top and the production casing string is achieved. The test shall be recorded on the driller’s log. In the event of lap or casing failure during the test, the lap or casing must be repaired or recemented and successfully retested as required. Production
-
Legislation notice 17
Link- Cementing oversight
- Cabinet Secretary (A temperature and cement bond log may be required by the Cabinet Secretary.)
- Test witness
- Minister (Advance notice must enable the Minister or his representative to witness casing and lap tests.)
- Production casing continued
- casing shall normally be of consistent nominal outside diameter from the surface or from the top of the lap to the casing shoe. The surface casing shall not be used as production casing.
- Guideline 3 heading
- 3. Cementing of casing
- Guideline 3 a
- (a) The surface, intermediate and anchor casing strings shall be cemented with a quantity of cement sufficient to fill the annular space back to the surface. Production casing shall be cemented with a high temperature resistant admix and shall be cemented in a manner necessary to exclude with, isolate or segregate overlying formation fluids from the geothermal resources zone and to prevent the movement of fluids into possible fresh water zones. The first stage of all cementing operations must be carried out by circulating cement from the surface to the bottom of the casings and back up the annulus.
- Guideline 3 b
- (b) Before any backfill cementing is carried out the casing annulus must be tested to prove cement can pass below the outer casing shoe so as not to trap water or explosive fluid in the annulus.
- Guideline 3 c
- (c) Production casing shall be cemented back to the surface.. A temperature and cement bond log shall be conducted if an unsatisfactory cementing job is indicated or as may be required by the Cabinet Secretary.
- Guideline 4 heading
- 4. Pressure testing of casing
- Guideline 4 a
- (a) Prior to drilling out the casing shoe after cementing all casing strings set to a depth of 152 metres or greater, shall be pressure tested to a minimum pressure of 69 bars (1,000 p.s.i.) or 0.045 bars/metres (0.2 p.s.i./ft.) whichever is greater.
- Guideline 4 b
- (b) All casing strings set at a depth less than 152 metres (500 feet) shall be pressure tested to a minimum pressure of 20 bars (300 p.s.i.).
- Guideline 4 c
- (c) The tests under paragraphs (1) and (2) shall not exceed the rated working pressure of the casing or the blowout preventer stack assembly, whichever is lesser and in the event of casing failure during the test, the casing must be repaired or recemented until a satisfactory test is obtained.
- Guideline 4 d
- (d) A pressure decline of 10 percent or less in 30 minutes shall be considered satisfactory.
- Guideline 4 e
- (e) Casing test results shall be recorded on the driller’s log. Advance notice of all casing and lap tests shall be given in sufficient time to enable the Minister or his representative to be present to witness such tests. The casing and lap tests shall give a detailed description of the test, including mud and cement volumes, lapse of time between running and cementing casing and testing, method of testing and test results.
- Guideline 5 heading
- 5. Well survey
- Guideline 5 a
- (a) Deviation surveys (inclination from vertical or single shot) shall be taken on all bores during the normal course of drilling at intervals not exceeding 152 metres and in calculating all surveys, a correction from true north to Labert-Grid north shall be made after making the magnetic to true north correction.
- Guideline 5 b
- (b) Bores are considered vertical if inclination does not exceed an average of five degrees from the vertical.
- Guideline 5 c
- (c) Bores are considered directional if inclination exceeds an average of five degrees from the vertical. Directional surveys giving both inclination and azimuth shall be obtained at intervals not exceeding 30 metres between stations prior to, or upon, setting any casing string or liner (except conductor casing) and at total depth.
- Guideline 6 heading
- 6. Safety equipment and procedures
- Guideline 6
- All necessary precautions shall be taken to keep all bores under control at all times, utilize trained and competent personnel, and utilize properly maintained equipment and materials. Blowout preventers and related bore control equipment shall be installed, tested immediately thereafter and maintained ready for use until drilling operations are completed. Certain components, such as packing elements and ram rubbers, shall be of high temperature resistant materials as necessary. All kill lines, blown down lines, manifolds and fittings shall be steel and shall have a temperature derated minimum working pressure rating equivalent to the maximum anticipated wellhead surface pressure. Except as otherwise provided by these Regulations, blowout prevention equipment shall have manually operated gates and hydraulic actuating systems and accumulators of sufficient capacity to close all of the hydraulically-operated equipment and have a minimum pressure of 69 bars (1,000 p.s.i.) remaining on the accumulator. Dual control stations shall be installed with a high pressure backup system. One control panel shall be located at the driller’s station and one control panel shall be located on the ground at least 15 metres away from the wellhead or rotary table. Air or other gaseous fluids drilling systems shall have blowout prevention assemblies. Such assemblies may include, but are not limited to, a rotating head, a double ram blowout preventer or equivalent, a banjobox or approved substitute thereof and a blind ram blowout preventer or gate valve, respectively.
- Guideline 7 heading
- 7. Requirement for drilling
- Guideline 7 a
- (a) Surface Casing.—In the case of areas where higher pressures are anticipated at shallow depths, before drilling below this string, at least—
- Guideline 7 a i
- (i) one remotely controlled hydraulically-operated expansion type preventer; and
- Guideline 7 a ii
- (ii) a manual and remotely controlled complete shut-off single ram blowout preventer or equivalent having a temperature derated minimum working pressure rating which exceeds the maximum anticipated surface pressure at the anticipated reservoir fluid temperature. At least one ram set shall be for complete shut off. A drilling spool with side outlets or equivalent, shall be installed. A kill line and blowdown line with appropriate fittings shall be connected to the drilling spool.
- Guideline 7 b
- (b) Anchor, Intermediate and Production Casings.—Before drilling below the blowout prevention equipment shall include a minimum of—
- Guideline 7 b item 1
- (a) one expansion-type preventer and accumulator;
- Guideline 7 b item 2
- (b) a manual and remotely controlled hydraulically-operated double ram blowout preventer or equivalent having a temperature derated minimum working pressure rating which exceeds the maximum anticipated surface pressure at the anticipated reservoir fluid temperature;
- Guideline 7 b item 3
- (c) a drilling spool with side outlets or equivalent;
- Guideline 7 b item 4
- (d) a kill line equipped with at least one valve; and
- Guideline 7 b item 5
- (c) a choke line equipped with at least one valve and securely anchored at all bends and at the end.
- Guideline 7 c
- (c) Testing and maintenance.—Ram-type blowout preventer and auxiliary equipment shall be tested to a minimum of 69 bars (1,000 p.s.i.) or to the working pressure of the casing or assembly, whichever is the lesser. Expansion-type blowout preventer shall be
-
Legislation notice 18
Link- Bore plugging iii
- (iii) where there is an open hole (uncased and open into the casing string above) a cement plug shall be placed in the deepest casing string by either (a) or (b) below. In the event that lost circulation conditions exist or are anticipated, or if the well has been drilled with air or other gaseous substance, the plug shall be placed in accordance with (c) below;
- Bore plugging iii a
- (a) a cement plug shall be placed across the shoe extending a minimum of 30 metres above and 30 metres (100 feet) below; or
- Bore plugging iii b
- (b) a cement retainer with effective back pressure control set approximately 30 metres above the casing shoe with at least 61 metres of cement below the retainer and 30 metres above;
- Bore plugging iii c
- (c) a permanent bridge plug set at the casing shoe and capped with a minimum of 61 metres of cement;
- Waste a
- (a) The licencee shall remove or store, in an orderly manner, all materials not in use, and shall provide and use pits and sumps of adequate capacity and design to retain materials and fluids necessary for drilling, production, or other operations. When no longer needed, pits and sumps are to be properly abandoned and the land restored;
- Waste b
- (b) Liquid well effluent or the liquid residue thereof containing substances, including heat, which may be harmful or injurious to persons or property shall be dealt with in such a way as to minimize such possible harm or injury;
- Waste c
- (c) Drill cuttings, sand, precipitates and other similar solids shall be disposed of in a suitable manner.
- Electricity generation value
- (a) Value of geothermal energy for electricity generation The value of geothermal energy for electricity generation shall be determined by the following formula
- Reasonable costs a
- (a) The reasonable costs in equation 1 may include
- Reasonable costs b
- (b) Resource exploration costs
- Reasonable costs c
- (c) Feasibility studies costs
- Reasonable costs d
- (d) Construction costs
- Reasonable costs e
- (e) Costs of land rent, rates and leases
- Reasonable costs f
- (f) Licenses
- Reasonable costs g
- (g) Financing costs
- Reasonable costs h
- (h) Insurance costs
- Reasonable costs i
- (i) Legal fees
- Reasonable costs j
- (j) Taxes
- Reasonable costs k
- (k) Community liaison costs
- Direct use value
- a) Value of geothermal energy for direct use The value of geothermal energy for direct use shall be determined by the following formula
- Revenue electricity generation
- Revenue for— (i) electricity generation shall be gross proceeds from steam sales which is the steam charge multiplied by the units of electricity generated;
- Revenue direct uses
- (ii) direct uses shall be the steam unit price multiplied by the quantity supplied by the licensee.
- Royalty exclusion
- Exclusion from royalty returns Any geothermal resources that do not get to point of delivery shall not be subject to royalty. ;
- Royalty exclusion a
- (a) Well testing and re-testing
- Royalty exclusion b
- (b) Venting
- Royalty exclusion c
- (c) Steam/brine transmission loses
- Remittance form
- The licensee shall submit the remittance form as per Second Schedule of these regulations.
-
Legislation notice 19
Link- Body
- Energy and Petroleum Regulatory Authority, Kenya Accreditation Service (Approves accredited laboratories.)
- Issuing authority
- Cabinet Secretary for Energy
- Website
- www.epra.go.ke
- Regulations title
- THE DRAFT ENERGY (APPLIANCES’ STANDARDS AND LABELLING) REGULATIONS, 2025
- Purpose
- The purpose of these Regulations is to promote the use of energy efficient appliances.
- Regulation 1
- These regulations may be cited as the Energy (Appliances’ Standards and Labelling) Regulations, 2025.
- Regulation 2
- These regulations shall apply to manufacturers, importers, distributors, promoters or retailers of appliances listed in the First Schedule.
- Regulation 3
- In these regulations, unless the context otherwise requires: –
- Definition accredited laboratory
- “accredited laboratory” means a laboratory for testing appliances as per the Kenya Standards and approved by Kenya Accreditation Service or a similar accreditation body;
- Definition act
- “Act” means the Energy Act, No.1 of 2019;
- Definition appliance
- “appliance” means an energy consuming equipment defined by the relevant standard;
- Definition authority
- “Authority” means the Energy and Petroleum Regulatory Authority established pursuant to Section 9 of the Act;
- Definition check test
- “check-test” means the testing of a registered appliance by an interested party to verify the declared energy performance;
- Definition distributor
- “distributor” means a person involved in sourcing appliances from manufacturers or importers for resale;
- Definition energy label
- “energy label” means an illustration to be affixed on an appliance or in printed on the packaging of an appliance, which provides information on the appliance’s energy performance, based on the Relevant Standard and approved by the Authority;
- Definition importer
- “importer” means a person involved in sourcing appliances from other countries into Kenya for own use or sale;
- Definition kenya standard
- “Kenya Standard” shall have the meaning assigned to it under Laws of Kenya;
- Definition manufacturer
- “manufacturer” means a person who makes or assembles appliances;
- Definition model
- “model” means a specific design of an appliance distinguished by its energy performance;
- Definition model number
- “model number” means a unique reference term assigned to a model by a manufacture or an importer;
- Definition person
- “person” natural or juridical person who manufactures, imports, distributes, promotes or sells appliances referred to in these Regulations;
- Definition promote
- “promote” means advertising or publicizing of appliances with an intention to sell.
- Definition registration certificate
- “registration certificate” means a document issued by the Authority to a manufacturer or importer, to confirm that an appliance has met the Relevant Standard;
- Definition retailer
- “retailer” means a person that sells appliances to end users;
- Definition relevant standard
- “relevant standard” means the Kenya Minimum Energy Performance Standards and the associated test methods;
- Definition test certificate
- “test certificate” means a document issued by an accredited laboratory as an attestation of an appliance meeting the requirements of the Relevant Standard; and
- Definition testing
- “testing” means the assessment of an appliance by an accredited laboratory to determine its energy performance in accordance with the Relevant Standard.
- Regulation 4
- Appliances listed in the First Schedule shall be tested for energy performance and registered by the Authority. A person shall not manufacture, import, distribute, promote or retail unregistered appliances.
- Regulation 5 a
- A person who intends to manufacture or import any of the appliances listed in the First Schedule shall submit a sample of the appliance model (s) to an Accredited Laboratory for testing. The number of appliances per model submitted for testing shall be determined by the relevant standard.
- Regulation 5 b
- The accredited laboratory shall test the appliance and issue a test report and certificate. Where the appliance fails to meet the minimum energy performance standards, only a test report shall be issued.
- Regulation 6 a
- A person who intends to manufacture or import appliances referred to in the First Schedule shall apply to the Authority for registration of the appliance model using the form provided in the Second Schedule.
- Regulation 6 b
- An application for registration under these Regulations shall be made electronically or in any other manner that the Authority may prescribe.
- Regulation 6 c
- The application shall be accompanied by proof of payment of the registration fees specified in the Third Schedule.
- Regulation 6 d
- The Authority shall, within thirty days of receipt of an application for registration of an appliance model, approve or reject the same with reasons and communicate to the applicant in writing.
- Regulation 6 e
- An appliance model registration certificate shall remain in force until the relevant standard is revised.
- Regulation 7 a
- Appliances under these regulations shall be required to have an energy label during promotion and at the point of sale.
- Regulation 7 b
- The energy label shall be positioned in a visible location as specified in the relevant standards.
- Regulation 7 c
- A person who fails to affix or imprint the energy label as per these regulations commits an offence.
- Regulation 8 a
- The Authority or its agent may carry out an inspection on any site where appliances are manufactured, promoted, stored, distributed or suspected to be manufactured, promoted, stored, distributed, to ensure that the appliances conform to these Regulations.
- Regulation 8 b
- Any person who hinders the Authority or its agent from enforcing Regulation 8 (1) commits an offence.
- Regulation 9 a
- Where the Authority finds that any provision of these regulations has been contravened, or that a condition has arisen which may lead to their contravention, the Authority may issue a compliance order. The order shall state:
- Regulation 9 a i
- the specific provisions which have been or are likely to be contravened;
- Regulation 9 a ii
- the measures which should be taken to rectify the contravention and this may include a re-test of the appliance; and
- Regulation 9 a iii
- the period within which the notice shall be complied with.
- Regulation 9 b
- Where a re-test is ordered by the Authority, the person served shall:
- Regulation 9 b i
- submit the appliance to an accredited laboratory at own cost within thirty days of receipt of the Authority’s order; and
- Regulation 9 b ii
- submit the test report and certificate to the Authority within the period stipulated in the order.
-
Legislation notice 20
Link- Body
- Authority (Administers appliance testing, registration, compliance, records and dispute resolution.)
- Court
- Energy and Petroleum Tribunal (Hears appeals against decisions of the Authority.)
- Regulation 9 continuation
- A person who fails to submit a test report and certificate within the period stipulated by the Authority in the regulations commits an offence.
- Regulation 9 c
- The Authority may, at its own cost, re-test, inspect or re-inspect appliances where necessary.
- Regulation 9 d
- Where an appliance model fails to meet the relevant standard after re-testing, the Authority may suspend or revoke the registration certificate.
- Regulation 9 e
- (e)
- Regulation 10 a
- A person who wishes to check-test a registered appliance shall apply to the Authority for authorization. The cost of the check-test shall be met by the applicant.
- Regulation 10 b
- The Authority shall within fourteen days notify all the parties involved in the planned check-test. The parties to be notified are:
- Regulation 10 b i
- the check-test applicant
- Regulation 10 b ii
- the person who registered the model
- Regulation 10 b iii
- the laboratory that tested the model
- Regulation 10 b iv
- the laboratory where the check-test is to be conducted.
- Regulation 10 c
- The check-test applicant shall submit the test report to the Authority within forty-eight hours of receiving it.
- Regulation 10 d
- Where an appliance fails to meet the performance, standards indicated in the registration certificate, after the check test, the Authority shall issue a non-compliance notice to the manufacturer or importer, which shall state:
- Regulation 10 d a
- the measures which should be taken to rectify the contravention;
- Regulation 10 d b
- the cost of the check-test to be reimbursed to the person that has applied for the check-test; and
- Regulation 10 d c
- the period within which the notice shall be complied with.
- Regulation 10 e
- A person who fails to comply with the notice issued commits an offence.
- Regulation 11 a
- Manufacturers and importers of appliances listed in the First Schedule shall be required to submit an annual record of all appliances manufactured or imported, in the format indicated in the Fourth Schedule, within six months after the end of the calendar year.
- Regulation 11 b
- The Authority may require additional data from the manufacturers and importers of appliances and shall, from time to time, prescribe and publish the format in which the data required under this part shall be provided.
- Regulation 11 c
- Manufacturers and importers of appliances shall maintain data under regulations 11(1) and 11(2) for a minimum period of five years.
- Regulation 11 d
- A person whose appliance is registered and fails to submit the records referred in these regulations commits an offence.
- Regulation 12 a
- The Authority may suspend or revoke a registration certificate issued under these Regulations where it is satisfied that a person has breached the provisions of these regulations or any conditions attached to the registration certificate.
- Regulation 12 b
- The Authority shall, give a notice of not less than thirty (30) days prior to suspending or revoking a registration certificate, in writing, to afford the person an opportunity to show cause why the registration certificate should not be suspended or revoked.
- Regulation 12 c
- A notice to show cause issued hereunder shall contain information to enable a person know the specific incidence(s) of non-compliance.
- Regulation 12 d
- The person shall be entitled to appear before the Authority with or without representation to show cause why his registration certificate should not be suspended or revoked.
- Regulation 12 e
- Where a registration certificate is suspended or revoked, the Authority shall remove the appliance model from the register and publish the suspension or revocation status.
- Regulation 12 f
- The person whose registration certificate has been suspended shall, on rectification of the non-compliance issues, submit to the Authority a compliance report for consideration, approval and reinstatement of the registration certificate.
- Regulation 12 g
- The person whose registration certificate has been revoked shall:
- Regulation 12 g a
- immediately stop the distribution and sale of that model;
- Regulation 12 g b
- recall all appliances of that model from distribution or retail outlets within Forty-eight hours of the notice; and
- Regulation 12 g continuation
- submit to the Authority a compliance report at the end of the notice.
- Regulation 12 h
- A manufacturer or importer who fails to comply with these regulations commits an offence.
- Regulation 13 a
- Where a standard is revised, a person shall be required to re-apply for registration of the appliance model.
- Regulation 13 b
- Where a Relevant Standard is revised, it shall be applicable to appliances:
- Regulation 13 b a
- manufactured or imported one year after the revision; or
- Regulation 13 b b
- promoted or retailed two years after the revision.
- Regulation 14
- Where a person demonstrates to the Authority that a registration certificate issued under these Regulations has been defaced, destroyed or lost, the Authority may, on payment of the fees prescribed in the Third Schedule, issue a duplicate registration certificate.
- Regulation 15
- The Authority shall publish and maintain a register of all appliance models registered under these Regulations and the status of the registration certificate(s).
- Regulation 16 a
- Complaints and/or disputes under these regulations shall be referred to the Authority for resolution in accordance with the Act.
- Regulation 16 b
- Any person dissatisfied or aggrieved by a decision of the Authority shall appeal to the Energy and Petroleum Tribunal.
- Regulation 17
- Where any default or contravention of any of the provisions of these Regulations is made for which no fine or penalty is expressly stated, the person so defaulting or contravening shall, on conviction, be liable to a fine not less than one hundred thousand shillings.
- Regulation 18 a
- A person found to be guilty of any of the offences listed in these regulations shall be liable to the fine or penalty indicated:
-
Legislation notice 21
Link- Body
- Energy and Petroleum Regulatory Authority (Authority administering appliance registration and penalties)
- Application recipient
- Director General, Energy and Petroleum Regulatory Authority (Recipient of applications for registration of appliance model(s))
- Place
- Nairobi (Application recipient's address)
- Penalties proviso
- (b) The fines or penalties in this Regulation are without prejudice to the Authority’s right to suspend or revoke the registration certificate.
- Transitional application
- 19. These regulations shall apply to appliances listed in the First Schedule and were not in the Energy (Appliances’ Energy Performance and Labelling) Regulations, 2016
- Importer manufacturer transition
- (a) one year for importers or manufacturers; and
- Retailer transition
- (b) two years for retailers.
- Existing certificates
- Registration certificates issued under Energy (Appliances’ Energy Performance and Labelling) Regulations, 2016 shall remain valid.
- Repeal provision
- 20. The Energy (Appliances' Energy Performance and Labelling) Regulations, 2016 are repealed.
- Application form instruction
- (This form is to be used for application for registration of appliance model(s) by Manufacturers and Importers.)
- Application declaration
- I/We …………………………............hereby apply for registration of:—
- Category instruction
- (Please tick (ü) as appropriate)
- Application category ac
- q Category AC: Non-Ducted Air Conditioners
- Application category c
- q Category C: Computers
- Application category cm
- q Category CM: Computer Monitors
- Application category gsl
- q Category GSL: General Service Lamps
- Application category m
- q Category M: Three Phase Induction Motors
- Application category r
- q Category R: Refrigerating Appliances
- Application purpose
- for the purpose of Manufacturing and/or Importing in accordance with the Energy (Appliances’ Standards & Labelling) Regulations, 2022.
- Applicant details heading
- 1. Details of applicant:
- Applicant form field a
- (a) Name of applicant (individual or organization)
- Applicant form field b
- (b) Income Tax Personal Identification Number:…………………
- Applicant form field c
- (c) Postal Address:…………………………….………………
- Applicant form field d
- (d) Email Address:.....................................................................
- Applicant form field e
- (e) Telephone number(s):...........................................................
- Applicant form field f
- (f) Building Name…………………………………….……….
- Applicant form field g
- (g) Street:………………………………………………………
-
Legislation notice 22
Link- Body
- Kenya Revenue Authority (Issuer of the Valid Tax Compliance Certificate required with the application.), County Government (Issuer of the Business Permit required with the application.)
- Registry
- registrar of companies (Source of CR12 required for limited companies.)
- Declaration
- I/We hereby declare that the information provided in this application is true and accurate. I/We understand that it is an offence, under the Energy Act 2019 and any other Laws of Kenya to give false information in application for this certificate
- Applicant commitment
- I/We commit to abide by the Energy (Appliances’ Standards and Labelling) Regulations, 2022 and any rules and by-laws for the time being in force there under.
- Motor registration
- For registration of motors, declaration of conformity will be accepted in lieu of test report.
-
Legislation notice 23
Link
Schedule 363 rows
Rows 1 to 200 of 363.
| The Director-General |
| Energy and Petroleum Regulatory Authority |
| P.O. Box 42681, 00100 GPO |
| Nairobi |
| I/We ……………………………………………….............................. hereby apply for a construction permit in accordance with the Energy (Biofuels) Regulations 2025 for the production of; |
| q Biogas |
| q Biodiesel |
| q Bioethanol |
| (Please tick (ü) as appropriate) |
| I/We commit to carry out the business in accordance with the Energy (Biofuels) Regulation 2025 applicable standards, guidelines and any rules and by-laws for the time being in force thereunder. |
| Purpose of application |
| New Applicationq Extension q (Please tick (ü) as appropriate) |
| 1. Name of Applicant ………………………………………… |
| 2. Details of applicant: |
| (a) Income Tax Personal Identification Number: ……………….. |
| Item | Text |
|---|---|
| (b) | Postal Address: ……………………………………… |
| (c) | Email Address: .......................................................... |
| (d) | Telephone number(s): ................................................ |
| (e) | LR/ Plot No………Building Name………………… |
| (f) | Street/: …………………………………………… |
| (g) | Town/County: ………………………………........... |
| 3. | Location of business premise(s) |
| a) | ………………………………………………… |
| b) | …………………………………………………….. |
| c) | ................................................................................... |
| (Insert additional lines as appropriate) | |
| 4. | Give full details of proprietors or partners owning business or directors/shareholders of the company, as applicable. |
| Name ……………… Nationality …………………….. …………………………….......... | |
| 5. | State if you are or any of your partners/directors is adjudged bankrupt. (If so, indicate the names). |
| 6. | All applications shall be accompanied by copies of the following documents: |
| (a) | Copy of Business Name Registration Certificate or Certificate of Incorporation and Memorandum and Articles of Association in case of a company (whichever is applicable); |
| (b) | Form CR12 from the registrar of companies not older than 12 calendar months from the date of issue; |
| (c) | PIN certificate; |
| (d) | Valid tax compliance certificate from the Kenya Revenue Authority; |
| (e) | Copy of national identification document or passport for all directors; |
| (f) | Certified copy of a valid Work Permit for foreign directors working in Kenya or notarized declaration of non-residence for foreign directors not residing in Kenya; |
| (g) | Proof of occupancy of company’s office; |
| (h) | For the project site, provide proof of land ownership (copy of title deed in the name of company/director(s)) or In the case of long-term land lease, copy of duly executed lease agreement in the name of the Company; |
| (i) | Physical planning approval from the county physical planning office; |
| (j) | Environmental & Social Impact Assessment licence from NEMA specifically authorizing development of a Biofuels production facility; |
| (k) | A Feasibility Study to demonstrate the technical viability of the project; |
| (l) | Detailed Specifications and Layout Plans: |
| (i) | Mechanical engineer’s materials & design specifications and associated drawings / facility’s operation philosophy (product piping, above-ground tank(s), filling facility, water draw off fittings, high level alarm location, requirements for pump venting; etc) |
| (ii) | Civil engineer’s drawings (all civil works including drainage, Oil Water Separator, bund walls, tank pad/foundation, hard standing surfaces, internal service roads, structures etc) |
| (iii) | Fire suppression systems (firefighting water storage tanks and associated fittings, firewalls etc) which should be accompanied by calculations showing adequacy of the same. |
| (iv) | Electrical and Instrumentation & Controls engineer’s drawings (Hazardous area classification, distribution control systems (DCS), data logging systems, Piping and Instrument Diagrams (P &ID)) |
| • | Certified copies of Professional Registration Certificates for the engineers or professional firm(s) that have undertaken the designs in (l) and Feasibility Study in (k) above. |
| DECLARATION | I/We hereby, declare that the information I/we have provided in the application is true and accurate. I/We understand that it is an offence to give false information in an application for an approval. |
| Signature of Applicant ………..……...Date…………………...…… |
| Facility | Application Fees (KSh.) | Permit grant Fees (KSh.) |
|---|---|---|
| Biogas | 2,000 | 100 per cubic meter of per day production capacity |
| Biodiesel | 5,000 | 1,000 per kl of per day production capacity |
| Bioethanol | 5,000 | 1,000 per kl of per day production capacity |
| Category of licence | Application Fees (KSh.) | Annual Licence Fees (KSh.) |
|---|---|---|
| G | 5,000 | 2,000 |
| D | 5,000 | 10,000 |
| E | 5,000 | 10,000 |
| Text |
|---|
| PERMIT NO. ……………………. |
| Construction Permit is hereby granted to _____________________of P.O. Box _____________ to construct the following biofuels Facility (s): |
| Construction of Biofuel Production Facility for ……………………. |
| On premises situated at : ___________________________ |
| Plot No. : ___________________________ |
| Street/Market : ___________________________ |
| Town/County : _________________________ |
| This Permit expires on : _____________________ |
| Dated this: ________________________________ |
| Signature _________________________________ |
| Director General |
| Energy & Petroleum Regulatory Authority |
| Item | Text |
|---|---|
| (iii) | Proof of membership to Oil Spill Mutual Aid Group (OSMAG) for category D licenses |
| (c) | Transportation |
| (i) | A valid Motor Vehicle Inspection Certificate for each prime mover and trailer where applicable |
| (ii) | A copy of the Logbook for each prime mover and trailer (Attach a valid lease agreement if vehicle not in the name of the applicant) |
| (iii) | A list of vehicles; paired prime movers and trailers where applicable |
| (iv) | A valid calibration certificate issued by the Department of Weights and Measures for the tank mounted on each trailer where applicable |
| (v) | A Highway Emergency Response Plan |
| (vi) | Fire Clearance Certificate for the vehicle(s) issued by the respective County Fire Department |
| (d) | Storage |
| (i) | Fire Clearance Certificate for the facility issued by the respective County Fire Department |
| (ii) | A letter from the Kenya Bureau of Standards as proof of conformity assessment of the facility against KS EAS 976 for category D licenses. |
| (iii) | A valid copy of certificate of registration of work place issued by Department of Occupational Safety and Health Services |
| (iv) | A report by a Professional Mechanical Engineer on the designs and suitability of the material of the storage equipment, pipeline, metering system and dispensing equipment used |
| (v) | Valid certificate(s) of calibration of the tank(s) and metering system issued by the Department of Weights and Measures |
| (vi) | An Emergency Response Plan |
| (vii) | Proof of training of at least one (1) employee in the safe handling of flammable fuels from a National Industrial Training Authority approved institution |
| (viii) | A valid Environmental Impact Assessment licence issued by the National Environment Management Authority for the facility |
| (e) | Distribution and Sale |
| (i) | Fire Clearance Certificate for the facility from the respective County Fire Department; |
| (ii) | A valid copy of certificate of registration of work place issued by the Department of Occupational Safety and Health Services; |
| (iii) | A valid certificate of calibration for the storage tank(s) and metering equipment issued by the Department of Weights and Measures; |
| (iv) | A valid certificate of calibration of the biofuel dispensing units’ meters from the Department of Weights and Measures; |
| (v) | A pressure test report approved by the Department of Occupational Safety and Health Services for the biodiesel tanks and pipelines at the facility; (not older than 60 months); |
| (vi) | A letter from the Kenya Bureau of Standards as proof of conformity assessment of the product against the applicable Kenya Standard; |
| (vii) | Copy of Applicant’s customer complaint handling procedures; |
| (f) | DECLARATION |
| I/We hereby, declare that the information I/we have provided in the application is true and accurate. I/We understand that it is an offence to give false information in an application for an approval. | |
| (b) | The right to construct or erect and use, operate and maintain within the Licence Area, together with ingress and egress there upon all wells, pumps, pipes, pipelines, buildings, plants, sumps, brine pits, reservoirs, tanks, waterworks, pumping stations, roads, electric power generating plants, transmission lines, industrial facilities; electric, telegraph or telephone lines or cables and such other works and structures and to use so much of the surface of the land within the Licence Area as may be necessary or convenient for the production, utilization and processing of geothermal resources or for the full enjoyment of the rights granted hereunder, subject to compliance with all applicable laws and regulations. |
| (c) | In so far as it may be necessary for and in connection with the operations described in this Licence, the right to: |
| (i) | drill and construct all necessary boreholes; |
| (ii) | erect, construct and maintain houses and buildings for the Licensee’s own use and for use by the Licensee’s employees; |
| (iii) | erect, construct and maintain plant, machinery, buildings and other erections as may be necessary; |
| (iv) | utilize the geothermal resources; |
| (v) | subject to the Water Act 2016, reclaim and utilize any water; and |
| (vi) | construct and maintain roads and other means of communication and convenience; subject to compliance with the Environment Management and Co-ordination Act, 2015, the Energy Act, 2019 and all other applicable laws and regulations |
| (d) | The rights to take, use, sell or apply the geothermal resources for the purpose of generating electric power, at any power station(s) to be erected upon the Licence Area, under Power Purchase Agreement(s) to be made between the Licensee, and/or an affiliate of the Licensee approved by the Authority, and the off taker. For the purposes of this sub-clause 1(d), “affiliate” shall mean an entity that directly or indirectly owns, is owned by or is under common ownership with the Licensee, and as used in this definition, “own” shall mean the possession, directly or indirectly, of any equity interests in or voting rights in such entity” “Off taker” shall mean any entity authorized to enter into a power purchase agreement with the Licensee. |
| (e) | The rights to take, use, sell or apply the geothermal resources for the purpose of direct uses, at any facilities to be erected upon the Licence Area |
| 2. | The rights granted shall be for a term of thirty (30) years from the date hereof and such term may be renewed at the option of the Licensee, for one further period of five (5) years; provided the licensee has complied with all the terms hereof; and provided that the Cabinet Secretary shall in granting the Licence, allow an exploration phase of a period not exceeding three years and if at the end of that period no geothermal resource of potential commercial interest is discovered the Cabinet Secretary may require the Licensee to surrender the Licence Area. |
| 3. | The Licensee shall: |
| (a) | Conduct geothermal surface exploration in the Licence Area for a period of three (3) years commencing the date of issuance of this Licence. |
| (b) | Carry out development of the power station(s) or direct use facilities in a period of three (3) years, which includes construction, and commissioning, starting from the end of the three (3) years geothermal exploration period under (a). |
| (c) | Mount the first development plan to target generating capacity of …….. MW of electrical power or thermal energy of …….MW (thermal) or the maximum economically available as defined by a Board of Consultants hired by the Cabinet Secretary through competitive sourcing as per applicable law, under Terms of Reference (ToRs) proposed by the Licensee and approved by the Cabinet Secretary, and paid for by the Licensee, before the end of the three (3) years geothermal exploration period under (a). |
| (d) | Bear the costs of any consultancy relating to the project in full. |
| (e) | Deposit the full amount of the consultancy fee for the Board of Consultants with the Cabinet Secretary on completion of the tendering process. |
| (f) | Also deposit with the Cabinet Secretary the full amount required by the Survey of Kenya for preparation of Cadastral Maps and other supporting documents of the Licence Area which will be needed for registration of rights to the land. |
| 4. | The Licensee shall provide the Cabinet Secretary with periodic written reports of the progress of operations under this licence as set forth in Appendix III. |
| 5. | |
| a) | Where the Licensee during the exploration phase, discovers geothermal resources which is of potential commercial interest, they shall within sixty (60) days after discovery submit an appraisal programme to the Cabinet Secretary for approval. |
| b) | If the appraisal programme results into a declaration by the Cabinet Secretary and the Licensee of a viable commercial geothermal resource, the Licensee shall, within twelve (12) months from the date of declaration, submit to the Cabinet Secretary a development and production programme which shall be in the form of Appendix IV. |
| 6. | The Licensee shall pay the Cabinet Secretary for the grant of the rights and privileges under the Licence |
| (a) | yearly in advance a rental of about US$5.00 per hectare amounting to US$ …………… (……………. hectares; ………. km² approximately) for each and every year or part thereof for which this licence is in effect and, if such rent is not paid within three months of becoming due, a penalty of ten percent (10%) shall be payable as if it were part of the rent; and, |
| (b) | a royalty of ………. (….%) of the value of geothermal resource extracted. |
| 7. | The Licensee shall comply with the provisions of the Regulations and the drilling conditions specified in the Appendix V thereto. |
| 8. | The Licensee shall carry out appraisal and development of the geothermal resources in the Licence Area, working closely with a designated government representative or the Geothermal Development Company (GDC) in management of the geothermal reservoir(s). |
| 9. | The Cabinet Secretary designates the Secretary, Geo-Exploration of the Ministry of Energy and Petroleum as his authorized representative for the purpose of receiving periodic reports, results of any geothermal appraisal programme and other written reports required under the Act or the Regulations. |
| 10. | The Licensee shall not transfer or assign this License or any part thereof without the consent of the Cabinet Secretary signified by the endorsement hereon, which consent shall not be unreasonably withheld. |
| 11. | The Licensee shall conduct operations under his License in workmanlike manner and in accordance with all applicable statutes and regulations to prevent bodily injury, danger to life or health or damage to property. |
| 12. | The Licensee shall comply where appropriate with the Health and Safety Guidelines as set out in the relevant Laws of Kenya and in the absence of such laws with the most recent World Bank guidelines currently in force, where appropriate. |
| 13. | The Licensee shall comply with the requirements for Privately Initiated Investment Proposals (PIIPs) as set out in the Public Private Partnerships (PPP) Act, 2013 and the Public Private Partnerships Regulations, 2014 of the Laws of Kenya |
| Text |
|---|
| BIOFUELS BUSINESS LICENCE |
| LICENCE |
| THE ENERGY (BIOFUELS) REGULATION 2025 |
| BIOFUELS BUSINESS LICENSE CATAGORY (………..) |
| License Number: ………………. |
| This is to Certify that |
| (NAME OF LICENSEE) |
| of Tel/Mobile: |
| P.O.Box |
| Code |
| Town |
| Having duly complied with all the requirements of the above Regulations is hereby licensed to |
| (Scope of licence) |
| Issue and Expiry Date……. ……... |
| Date |
| Terms & Conditions |
| GENERAL CONDITIONS |
| The license is valid for ……………….. calendar years as provided on the licence issued. |
| 1. Application for licence renewal shall be made at least thirty (30) days before the license expiry date. |
| 2. The licensee shall not transfer or otherwise divest any rights, powers or obligations conferred or imposed on him by the license without permission from the Energy and Petroleum Regulatory Authority. |
| 3. The licensee, manufacturer or importer of consumer devices shall provide the Authority with information on |
| 4. The licensee shall not carry out any work unless the license is valid. |
| Item | Text |
|---|---|
| 1. | Design and Construction. |
| (a) | In determining the size of a bio-digester the design shall take into account the available feedstock, the existing and any projected future biogas demand. |
| (b) | The amount of biogas consumption for basic applications shall be as specified in KS 2566-1. |
| (c) | Site selection for domestic and commercial biogas plants shall be determined by the criteria specified in KS 2566-1and KS 2951 respectively. |
| (d) | The materials used in the construction of biogas plants should withstand the chemical conditions of the feedstock and effluent, weather conditions, corrosion and the weight of the structures. |
| (e) | The design of biogas plants shall take into account cost optimization and safety consideration. The design considerations for domestic and commercial systems are specified in KS 2566-1 and KS 2951 respectively. |
| (f) | The project proponent shall undertake a risk assessment and an evaluation based on occupational health and technical aspects of the biogas project, as required by KS 2566-1 and KS 2951, prior to the construction of a biogas plant. |
| (g) | A biogas plant supplier shall avail to the system owner documentation regarding: |
| (i) | Overall description of the plant |
| (ii) | Applicable construction and technical drawings |
| (iii) | Operation manual for each component of the biogas plant |
| (iv) | Manual for whole plant operation including action for unplanned situations |
| (v) | Safety documents |
| (vi) | Operation guidelines |
| (vii) | Start up/normal operation/shut-down |
| (h) | The sizing and layout of biogas plant components such as; inlet tank, piping, digester, gas chamber, outlet tank, fitting and accessories shall be as specified in KS 2566-1, KS 2566-2, KS 2566-3 and KS 2951. |
| (i) | The design, construction and installation of biogas plants shall be undertaken by suitably qualified personnel as per the requirements provided in KS 2566-1, KS 2566-2, KS 2566-3and KS 2951. |
| (j) | At the end of the construction of domestic and commercial biogas plants, testing, commissioning, operation and maintenance shall be undertaken as per by KS 2566-1 and KS 2951 respectively. |
| (k) | The biogas installer shall provide a workmanship guarantee of at least one (1) year and after sales services. The guarantee for the biogas components shall be as per the manufacturers’ specifications. |
| 2. | Distribution |
| (a) | A biogas reticulation system shall conform to the provisions of the relevant Kenya Standard and be operated in accordance with these guidelines. |
| (b) | The operator of a biogas reticulation system shall obtain, maintain and safeguard wayleaves or rights of way where the pipeline and incidental installation will be located. |
| (c) | A design for a biogas reticulation system shall incorporate environmental, health and safety standards, and shall be certified by a Professional Mechanical Engineer. |
| (d) | Each consumer outlet shall have a separate and functional metering system approved by the Department of Weights and Measures. |
| (e) | The unit of sale of biogas to consumers in a biogas reticulation system shall be in cubic metres. |
| (f) | The biogas shall consist of at least 60% methane and at most 1% hydrogen sulphide by volume. |
| (g) | The operator of a biogas reticulation system shall maintain an accidents and complaints register. |
| (h) | A notification of an accident or incident shall be submitted to the Authority within 48 hours of its occurrence. The respective investigation reports shall be submitted to the Authority within 14 days. |
| (i) | The operator of a biogas reticulation system shall enter into a service contract with each biogas consumer. The service contract shall include the following details:- |
| (i) | name, address and telephone number of the operator and the biogas consumer; |
| (ii) | rights and obligations of the parties; |
| (iii) | emergency response plan; |
| (iv) | billing period and the mode of payment; |
| (v) | charge per cubic metre and the cost breakdown thereof; and |
| (vi) | dispute and complaints handling procedures. |
| (j) | The operator of a biogas reticulation system shall maintain records of volume, in cubic metres, of all the biogas supplied. |
| 3. | Waste Management |
| The management of waste and emissions from domestic and commercial biogas plants shall be carried out as specified in KS 2566-1 and KS 2951, respectively and as per environmental laws and regulations. |
| 1. | Packaging |
| Except when transported in bulk, the biodiesel shall be packed in sound, clean, dry drums not affected by the biodiesel. The drums shall be so closed that leakage and contamination of the biodiesel is prevented during normal handling and transport. | |
| 2. | Blending requirements for biodiesel: |
| Pure biodiesel to be blended into automotive gasoil fuel shall meet specifications provided in Kenya Standard KS 2227. | |
| The derivatives of the blended diesel shall have properties specified in the relevant Kenya Standard. | |
| 3. | Branding and Labeling |
| Pumps and dispensing equipment used for sale of biodiesel shall be clearly marked and labeled to distinguish them from pumps dispensing pure diesel. | |
| For labeling purposes, the following information shall appear in prominent, legible and indelible marking: | |
| (a) | The manufacturers’/suppliers’ name; |
| (b) | Brand name of the product; |
| (c) | A description of the product; |
| (d) | Batch identification; and |
| (e) | Quantity of the contents |
| The aforementioned information shall be indicated on each drum. |
Everyone named
Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.
Corrections 0
- Corrected by
- No corrigendum in the issues we hold.
- Cites
- KS EAS 976, KS 2566-1, KS 2951, KS 2566-2, KS 2566-3, Kenya Standard KS 2227, KS 2759, KS 2838, First Schedule, Second Schedule, Third Schedule, Fourth Schedule, Public Private Partnership Act, Energy Act, Appendix I, Appendix II, Appendix III, Appendix IV, Appendix V, Second Schedule of these regulations, Energy Act, Energy (Appliances’ Standards & Labelling) Regulations, 2022
- Revokes
- Energy (Appliances' Energy Performance and Labelling) Regulations, 2016
Cite
Kenya Gazette Notice No. 7252 of 2025, Vol. CXXVII No. 107, 30 May 2025, p. 2486.Permalink funua.com/notices/2025/7252/.
About this data
- Source
- Official PDF of Vol. CXXVII No. 107, from Kenya Law
- Extracted by
- AI models
- Model audit
- An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
- Review flag
- None on this notice