Funua Alerts & API

Independent guide. Not a government website.Independent guide to Kenya Gazette notices. Not a government website.

LicencesGazette notice

Gazette Notice No. 7300 of 2025

The Water Services Regulatory Board approved water and sewerage tariffs for Olkejuado Water and Sewerage Company Limited for 2024/2025 to 2027/2028.

Official PDF · 0.7 MB

Whole issue, from Kenya Law. This notice starts on printed page 2530.

AI-extractedAgreement between models, not verified accuracy.

Items 3

  1. Tariff approval 1

    Link
    Licensing authority
    Water Services Regulatory Board
    Applicant
    Olkejuado Water and Sewerage Company Limited (Applied for a review of water services tariffs.)
    Licensee
    Olkejuado Water and Sewerage Company Limited (Utility whose water and sewerage tariffs are approved.)
    Term
    2024/2025 to 2027/2028
    Notice period
    one-month notice from the date of this communication
    Reason
    to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff
    Non functional meter billing
    Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
    Sewerage with water connection
    Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
    Disconnected account billing
    Disconnected water accounts shall be charged based on the average sewerage charges for the last three months before the disconnection.
    Domestic sewerage without meter
    Domestic customers without a metered water source (Per Single dwelling unit): Ksh. 300 Per Month
    Other sewerage without connection
    All other categories: 75% of the volume of water consumed as per the metered source of water, including boreholes, at the rates specified in (1.1) above
    Annual indexation
    The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the Water Services Regulatory Board (WASREB) regulations.
    Inflation adjustment
    The inflation adjustment shall come into effect every July of the tariff period, commencing July 2026.
    Sewer only deposit
    Customers with only sewer connection are to be charged a deposit equivalent to a water connection
  2. Tariff approval 2

    Link
    Licensee
    OWASCO
    Body
    WASREB (Approves priority service delivery capital projects and receives quarterly performance reports.)
    Service delivery conditions
    (i) Service Delivery Conditions attached to the Tariff
    Annual budgets
    (ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
    Surpluses
    (iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by WASREB.
    Reporting
    (iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
    Metering
    (v) Metering: OWASCO shall progressively enhance the metering ratio to attain 100% as per condition (3 i) above.
    Investments
    (vi) Investments: The utility shall undertake the investments in Table 1:
    Approval conditions
    The conditions attached to this approval, which shall form part of the license conditions of OWASCO, are:
    Cost summary
    Below is the summary of the recommended cost structure that makes up the total costs to be incurred by OWASCO during the tariff period:
  3. Tariff approval 3

    Link
    Licensing authority
    Water Services Regulatory Board
    Office
    Ag. Chief Executive Officer, Water Services Regulatory Board
    Place
    Kitengela (Metering investments), Kajiado (Metering investments), Isinya (Metering investments), Ilbssil (Metering investments), Kitengeal (Metering investments), illbissil (Metering investments), ilbisil (Metering investments), ilbissil (Meter replacements), railway draw point tank (Bulk/Production meters), demo farm bh draw point (Bulk/Production meters), Oloosuyian bh draw point (Bulk/Production meters), ilbissil Borehole draw point (Bulk/Production meters), Kitengela line (Bulk/Production meters), Oloosuyian Borehole (Bulk/Production Master Meters and Works), Demo Borehole (Bulk/Production Master Meters and Works), bissil (Bulk/Production Master Meters and Works), migingo (Bulk/Production Master Meters and Works)
    Investments
    Table 1: Investments

Schedule 118 rows

1.1 Water Tariff
Consumer CategoriesConsumption Block (M3)Approved Tariff (KSh./M3)
Domestic/Residential1-690
7-20.113
21-50118
51-100123
101-300130
>300140
Multi-Dwelling UnitsPer M3105
Commercial/Industrial/Government/Institutions1-50118
51-100123
101-300130
>300140
Public Schools, Colleges and Universities1-600105
601-1200125
>1200m3140
Water KiosksPer M385
1.4 Miscellaneous Charges
Item/ServiceCharge (KSh.)
Water Deposit
Category of consumer
Domestic2500
Retail shops less than 10m33000
Retail shops more than 10m33,500
Bar and restaurants less than 15 m34000
Bar and restaurants more than 15 m36,000
Hotel class “A” and “B” less than 150 m312,000
Hotel class “A” and “B” more than 150 m315000
Hotel class “C” and ‘D’ less than 150 m318000
Hotel class “C” and ‘D’ more than 150 m320,000
Hospitals and Health centres more than 150 m320,000
Hospitals and Health centres less than 150 m312,000
Schools and other institutions more than 200 m320,000
Schools and other institutions less than 200 m310,000
Minor construction sites of more than 200 m315,000
Major construction sites more than 300 m350,000
Light industries less than 200 m330,000
Medium industries between 200 m3 and 300 m350,000
Heavy industries of more than 300 m3100,000
Water Kiosks5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch2,500
New water connection fee – Connection size: 1.5 inches to 3 inches7,500
New water connection fee – Connection size above 3inches15,000
Water Reconnection fee – at meter point1,000
Water Reconnection fee – at mains5,000 and double deposit
Tanker – 8000 & 16,000 litres2,500 & 5,000 respectively per tanker within the WSP area for all consumers
Sale of water Per M3 at bowsing point (own tanker)90
Replacement of stolen or damaged meters100% of the market cost of the meter
Meter testing on request500
Special meter reading under customer’s request500
Sewer Connection- Residential/ Domestic5,000
Sewer Connection- Commercial, Government, Schools, Universities and Colleges7,500
Sewer Connection- Industrial15,000
Private sewer unblocking2,500
Leak detection services1,000
Sewer Reconnection fee15,000
Printing of customer’s statement under own request200
For cutting off the supply at the request of the consumer200
For turning on the supply otherwise than in respect of a first connection200
Exhauster Services (Company Exhauster)5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system)15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud)100,000 plus estimated consumption during the period of illegality
Illegal water connection, (Fraud) – Domestic30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk15,000
Illegal sewer connection- Commercial, Industry, Construction100,000
Illegal sewer connection- Domestic, Government, Schools, Universities & Colleges30,000
Self-reconnection after cut-off for non-payment5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)5,000
Surcharge for direct suction of water from the supply line using a pump10,000
2.0 Cost Summary
Expenditure Item2023/242024/252025/262026/272027/28
Operations28,360,58229,059,32934,749,69240,026,29445,494,160
Maintenance337,200404,640485,568582,682699,218
Regulatory Levy286,571625,0902,044,1522,577,6722,745,049
Total O&M Costs28,984,35330,089,05937,279,41243,186,64848,938,427
Investment Costs--3,225,0008,625,0007,335,000
Total Costs28,984,35360,178,11840,504,41351,811,64856,273,427
Total Billing (KShs)8,885,94816,829,79552,526,53266,149,06170,674,930
Collection Efficiency (%)64%70%77%80%85%
Projected Revenue5,867,00611,780,85740,445,42952,919,24960,073,690
Total Cost Coverage20%39%100%102%107%
(i) Service Delivery Conditions attached to the Tariff
Target2022/20232023/20242024/20252025/20262026/20272027/2028
Water Coverage18%18%19%20%21%22%
Water quality standards0%100% Compliance with Standards
Personnel Expenditure as % of O&M46%36%37%33%28%26%
Non-Revenue Water44%44%39%36%33%30
Hours of Supply (Hrs.)101111121213
Staff per 1000 connections1075647393327
Metering ratio100%100%100%100%100%100%
Collection Efficiency78%64%70%77%80%85%
Resale at KioskKshs. 2.00 per 20l Jerry CanKshs. 5.00 per 20l Jerry Can
Table 1: Investments
S/No.InvestmentsDescriptionQTY.Unit Price (KSh..)2025/2026 2026/2027 2027/2028 — amounts in printed order
1Metering
1.1Water Meter - New ConnectionsProcure and instal Dn 15 R200 customer meters Kitengela-(300) Kajiado(100)Isinya(50)Ilbssil (50)5004,000400,000 800,000 800,000
Procure and instal Dn 20 R200 customer meters Kitengeal(300) Kajiado(100)Isinya(50)illbissil(50)5007,500750,000 1,500,000 1,500,000
procure and instal Dn 25 R200 customer meters kitengela(100)kajiado(60)isinya(20) ilbisil(20)20010,000500,000 750,000 750,000
1.2Water Meter- meter replacementsReplacement of meters that have surpassed their economical life (6yrs) - 200 DN 15 meters each year kajiado-(400) isinya(100) ilbissil(100)6004,000400,000 1,000,000 1,000,000
1.3Bulk/Production metersBulk meter - DN 75 single jet AMR enabled meter (railway draw point tank)180,00080,000
Dn 50- single jet AMR enabled meter demo farm bh draw point,Oloosuyian bh draw point, ilbissil Borehole draw point345,00045,000 45,000 45,000
DN 150 single jet AMR enabled meter (Kitengela line)1150,000150,000
2Non-Revenue Water Management
2.1Bulk/ Production Master Meters and WorksDN 200 Single Jet AMR Enabled Meter (Oloosuyian Borehole)2200,000200,000 200,000
DN 50 Single Jet AMR Enabled Meter (Demo Borehole,bissil,isinya,migingo445,00090,000 90,000
Construction and installation of series bulk meters and production meter chambers (2 Chambers every year)1150,000100,000 250,000 200,000
2.2Cold Water Meter Testing and CalibrationMeter Calibration bench for meter sizes DN15mm to DN40mm11,000,0001,000,000
Portable Water Meter Test Kit1400,000400,000
Water Meter Anti-Tampering Plastic Seals4000500500,000 750,000 750,000
2.4Active Leakage Management Equipment for DMAs operationalization
2.5Pressure data loggers, Pressure Gauges & Pressure Reducing ValvesPressure data loggers with 2 output channels (max pressure 10 bars)3200,000400,000 200,000
Pressure data loggers with 2 output channels (max pressure 20 bars)3300,000300,000 600,000
Veron Moris analogue calibrated Pressure Gauges with up to 20 bars and has plotter paper.250,00050,000 50,000 50,000
Install Water Pressure Gauges505,00050,000 100,000 100,000
Tank ball valves 4"1035,00070,000 140,000 140,000
tank ball valves 2 ½225,00050,000
Tank ball valves 2"1020,00040,000 80,000 80,000
3Office FurnitureOffice Chairs1510,00030,000 60,000 60,000
Office Desks720,00020,000 60,000 60,000
Office Cabinets640,00040,000 80,000 120,000
4ComputersLaptops (hp intel core i7,8gb)os 64-bit windows 116100,000100,000 200,000 300,000
Desktops (HP pro i5 8gb) 64-bit Windows 11650,00050,000 100,000 150,000
Printers (HP color laserjet pro)370,00070,000 140,000
TOTAL3,225,000 8,625,000 7,335,000

Everyone named

Signed byRICHARD CHERUIYOT, Ag. Chief Executive Officer, Water Services Regulatory Board
Places 17Kitengela · Kajiado · Isinya · Ilbssil · Kitengeal · illbissil · ilbisil · ilbissil · railway draw point tank · demo farm bh draw point · Oloosuyian bh draw point · ilbissil Borehole draw point · Kitengela line · Oloosuyian Borehole · Demo Borehole · bissil · migingo
Licensees 2Olkejuado Water and Sewerage Company Limited · OWASCO
Licensing authorityWater Services Regulatory Board
ApplicantOlkejuado Water and Sewerage Company Limited
BodyWASREB
OfficeAg. Chief Executive Officer, Water Services Regulatory Board
LawWater Act

Pages for private people, including the deceased and petitioners, are public, but we ask search engines not to list them.

Corrections 0

Corrected by
No corrigendum in the issues we hold.
Refers to
No other notices.

Cite

Kenya Gazette Notice No. 7300 of 2025, Vol. CXXVII No. 108, 30 May 2025, p. 2530.

Permalink funua.com/notices/2025/7300/.

About this data

Source
Official PDF of Vol. CXXVII No. 108, from Kenya Law
Extracted by
AI models
Model audit
An independent model agreed with 98 to 99% of compared values for land and succession notices, 97% overall. Agreement between models, not verified accuracy.
Review flag
None on this notice

Filed under: Licences, 2025 · May 2025 · Vol. CXXVII No. 108